ML17139D084

From kanterella
Jump to navigation Jump to search
Forwards Response to 850723 Request for Addl Info in Support of Tech Spec Exemption to Allow Diesel Generator Removal from Svc for 60 Days. Design Criteria,500 Kv Steel Pole Structure Transmission Lines, Encl
Date released: 09/18/2017 Download: ML17139D084


Forwards Response to 850723 Request for Addl Info in Support of Tech Spec Exemption to Allow Diesel Generator Removal from Svc for 60 Days. Design Criteria,500 Kv Steel Pole Structure Transmission Lines, Encl
ML18040A784
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 08/07/1985
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: BUTLER W R
Office of Nuclear Reactor Regulation
References
Download: ML18040A784 (17)
Design Criteria,500 Kv Steel Pole Structure Transmission Lines.
ML17139D083
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 07/07/1980
From: Geiger R, Valastiak M
PENNSYLVANIA POWER & LIGHT CO.
To:
References
Download: ML17139D083 (178)