ML17139D040
| ML17139D040 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/28/1985 |
| From: | Harold Denton Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17139D041 | List: |
| References | |
| NUDOCS 8504080522 | |
| Download: ML17139D040 (5) | |
Text
~p,fl REoy,Np0 Op
~ 9~
0
+**++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 PENNSYLVANIA POWER
& LIGHT COMPANY DOCKET NO. 50-388 SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
9 License No.
NPF-22 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Pennsylvania Power
& Light Company (the licensee),
dated January 30, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of'he Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, Facility Operating License No. NPF-30 is amended by changing License Condition 2.C.(7) to read as follows:
(7)
Environmental uglification (Section 3.11
- SER, SSER Pl SSER 82, Prior to March 31, 1985, the licensee shall environmentally qualify all electrical equipment according to the provisions of 10 CFR 50.49 except as follows:
(a)
All modifications of Unit 2 equipment which are common with Unit 1 shall be completed prior to the startup following the first refueling outage f'r Unit I which is prior to November 30, 1985.
(b)
Testing and qualification of conduit seals, silicone rubber insulated cable and NSIS cable shall be completed prior to November 30, 1985.
8504080522 850328~
- DOCK 05000388 P
~
1 (c)
Modifications to the Target Rock Solenoid Valve SV-22651 shall be completed prior to November 30, 1985.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Date of Issuance:
MAR 2 8 1985 cc u.
ora z.
0
- ton, cree or Office of Nd lear Reactor Regulation
3.
1 I
8 c.
Modifications to the Target Rock Solenoid Valve SV-22651 shall be completed prior to November 30, 1985.',',
This license amendment is effective as of the date of its,issuance.
~"
FOR THE NUCLEAR REGULATORY COMMISSION li Original Signed bp',,
," Parrell G. Eisenhuh, 1
Harold'R. Denton, Director, Office of Nucl ear Reactor Regul ation Date of Issuance:
MAR p 8 1985
- See previous concurrence concurred on by:
LB02/DL/PM LB82/DL/LA
- RAuluck:lb
- EHylton 03/22/85 03/22/85 D /
D/NRR D
ut Dento 03ggl/85 03/g /85 LB82/DL/BC
- ASchwencer 03/22/85 OELD AD/L/DL D/DL
- WShields
- TMNovak
- HThompson 03/22/85 03/26/85 03/27/85
"'3:
>> l ll) 6 C1' "J
tl fi
t s
WA I"'
~v 3
P
'l" f
ll I,
II 1