ML17139C338
| ML17139C338 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos Nuclear Center |
| Issue date: | 05/23/2017 |
| From: | Anthony Mendiola Research and Test Reactors Oversight Branch |
| To: | Feyrer M GE-Hitachi Nuclear Energy Americas |
| Anthony Mendiola | |
| References | |
| 50-73/OL-17-002 | |
| Download: ML17139C338 (4) | |
Text
May 23, 2017 Mr. Matt Feyrer, Director General Electric-Hitachi Vallecitos Nuclear Center 6705 Vallecitos Road Sunol, CA 94586
SUBJECT:
EXAMINATION REPORT NO. 50-073/OL-17-02, GENERAL ELECTRIC-HITACHI VALLECITOS NUCLEAR CENTER
Dear Mr. Feyrer:
On May 2, 2017, the U.S. Nuclear Regulatory Commission (NRC) administered an operator licensing examination at your General Electric-Hitachi Nuclear Test Reactor (GEH NTR). The examination was conducted according to NUREG-1478, Operator Licensing Examiner Standards for Research and Test Reactors, Revision 2. Examination questions and preliminary findings were discussed with you and those members of your staff identified in the enclosed report at the conclusion of the examination.
In accordance with Title 10 of the Code of Federal Regulations, Section 2.390, a copy of this letter and the enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. The NRC is forwarding the individual grades to you in a separate letter which will not be released publicly. Should you have any questions concerning this examination, please contact Mrs. Paulette Torres at (301) 415-5656 or via e-mail Paulette.Torres@nrc.gov.
Sincerely,
/RA/
Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No.50-073
Enclosure:
Examination Report No. 50-073/OL-17-02 cc w/o enclosure: See next page
ML17139C338 NRR-074 OFFICE NRR/DPR/PROB NRR/DIRS/IOLB/OLA NRR/DPR/PROB/BC NAME PTorres ABaxter AMendiola DATE 05/17/2017 05/19/2017 05/23/2017
General Electric-Hitachi Vallecitos Nuclear Center Docket No.50-073 cc:
Mark Leik, Manager Regulatory Compliance GE Hitachi Nuclear Energy Vallecitos Nuclear Center 6705 Vallecitos Road Sunol, CA 94586 Daniel Thomas, Manager Nuclear Test Reactor GE Hitachi Nuclear Energy Vallecitos Nuclear Center 6705 Vallecitos Road Sunol, CA 94586 Scott Murray, Manager Facility Licensing GE Hitachi Nuclear Energy 3901 Castle Hayne Road Wilmington, NC 28401 Commissioner California Energy Commission 1516 Ninth Street, MS-34 Sacramento, CA 95814 California Department of Health ATTN: Chief Radiologic Health Branch P.O. Box 997414, MS 7610 Sacramento, CA 95899-7414 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611-8300
U. S. NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING INITIAL EXAMINATION REPORT REPORT NO.:
50-073/OL-17-02 FACILITY DOCKET NO.:
50-073 FACILITY LICENSE NO.:
R-33 FACILITY: General Electric-Hitachi Vallecitos Nuclear Center EXAMINATION DATE:
May 2, 2017 SUBMITTED BY: ________/RA/__________________
_____05/16/17____
Paulette Torres, Chief Examiner Date
SUMMARY
On May 2, 2017, the NRC administered a licensing examination to one Senior Reactor Operator instant (SRO-I) candidate. The candidate passed all applicable portions of the examinations.
REPORT DETAILS
- 1.
Examiner: Paulette Torres, Chief Examiner, NRC
- 2.
Results:
RO PASS/FAIL SRO PASS/FAIL TOTAL PASS/FAIL Written 0/0 Waived 0/0 Operating Tests 0/0 1/0 1/0 Overall 0/0 1/0 1/0
- 3.
Exit Meeting:
Paulette Torres, Chief Examiner, NRC Matthew Feyrer, Site Manager, GEH NTR Tom McConnel, NTR Manager, GEH NTR Mark Leik, IHS Regulatory Compliance, GEH NTR Upon completion of the examination, the NRC examiner thanked the facility for their support in the administration of the examination.