ML17139B218
| ML17139B218 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna, Summer, 05000000 |
| Issue date: | 11/15/1982 |
| From: | Kane W, Perch R Office of Nuclear Reactor Regulation |
| To: | Carter J, Case E, Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8212010030 | |
| Download: ML17139B218 (2) | |
Text
Docket Nos.:
50-387 and 50-395 tIJOV ]. 5 1S82 thEthORANDUth FOR:
E. Case, NRR'Q
~ J. Carter, NRRz PR D. Eisenhut, OL J. Kramer, OHFS R. Vollmer, OE R. thattson, DSI
~
S. Hanauer, DST J. Sniezek,,OIE T. Ippolito, ORAB T. Novak, NRR G. Lainas, ERR F. thiraglia, NRR DIST:
<Document Control (50-387/50-395) =
LB82 Rdg.
WKane RPerch thRushbrook EHylton FROth THRU:
SUBJECT:
R. L. Perch, Project tlanager Licensing Branch No. 2, DL M. F. Kane, Project thanager Licensing Branch No. 1, DL B. J. Youngblood, Chief Licensing Branch No. 1, DL ISSUANCE OF FULL POllER LICENSES FOR SUSQUEHANNA STEAtl ELECTRIC STATION, UNIT 1
AND VIRGIL C.
SUthNER NUCLEAR STATION, UNIT 1
M. F. Kane, Project thanager Licensing Branch No.
1 Division of Licensing On November 12, 1982, full power license amendments were issued to Pennsylvania Power and Light Company for Susquehanna, Unit 1
(3293 thMt) and to South Carolina Electric and Gas Company for Summer, Unit 1
(2775 HMt).
The Susquehanna, Unit 1
license is a 40-year license from the date of issuance of the operating license with the low power limitation and expires July 17, 2022.
The Summer, Unit 1
license is a 40-year license from the date of issuance of the construction permit and expires tharch 21, 2013.
The Summer license contains a condition limiting opera-tion to 50'5 power until, the steam generator tube vibration problem is resolved.
R. L. Perch, Project thanager Licensing Branch No. 2 Division of Licensing DL:LBg2 lj Ol RPerch/1 g
'4 age 11/15/82 11/$5 /82
-82i2010030 82iii5 PDR ADOCK 05000387 P
PDR DL:
BJYoup lood 11/(+82