Docket Nos.:
50-387 and 50-388 OCT R2 1982 MEMORANDUM FOR:
Joe Youngblood, Chief Licensing Branch No.
1 Division of Licensing FROM:
SUBJECT:
John J. Stefano, Project Manager Licensing Branch Ho.
1 Division of Licensing DOCUMENTATION OF CONFERENCE CALL HITH PENNSYLVANIA POWER AND LIGHT COMPANY (PP&L)
- SUSQUEHANNA STEAM ELECTRIC STATIOH (SSES)
The conference call was held on October 18, 1982, during which PP&L advised NRC and Teledyne of progress.-made in reconciling concerns raised by the Teledyne's Independent Design Review of PP8L's engineering judgements for concluding the acceptability of the plant's large pipe hangers to Code allowable stresses.
Those participating in the conference call were:
PP&L N. Curtis T. Crimmins R. Shovlin W. Barberich Teledyne D. Landers NRC T. Novak J. Youngblood T. Sullivan D. Terao J. Stefano (substituting for PM - R. Perch)
In sutanary, PP&L indicated that it had completed categorizing 395 sample hangers out of 493.
Of the 395 categorized, 311 sample hangers have been found accept-able by PP8L; 57 Category III hangers are being reanalyzed by Bechtel with the review of 17 of them found to be acceptable.
Reanalysis of the remaining 40 Category II samples is to be completed by October 19, 1982.
PP&L is committed to complete its'tudy of 500 hangers (selected for its Reconciliation Sampling Program) but indicated that it believes 395 samples should be adequate for obtaining a satisfactory response from HRC to its October 14, 1982 request, to go to 3M power.
PP&L further stated that it is currently prepared to provide Teledyne with whatever information is needed for its confirmatory acceptance of the PP&L/Bechtel re-examination findings.
Finally, PP&L updated its schedule for plant startup and attainment of 5% power, which will occur on October 21 and 27, respectively.
OFFICE)
SURNAME/
DATElI 82iiOi0445 82i022
-;- PDR.-ADOCK:.05000387-.-
~ ~
~IttttO~ 0 ~ 0 ~ 1 ~
~
~
0 ~ ~ ~ 1 ~ ~\\ ~ ~ ~ ~ ~ ~
NRC FORM 318 (10-80) NRCM 0240 OFF lCIAL R ECOR D COPY USQPO: 1991~990
Joe YoungbloodI In response to PP8L's request, a meeting was scheduled between itself, Teledyne and NRC for Thursday, October 21, 1982 at the NRC offices in Bethesda (this meeting date was subsequently scheduled for Friday, October 22, 1982 in Bethesda).
NRC (T. Novak) stressed to PP8L (and Teledyne) that NRC expects to have in hand Teledyne's formal acce~tability of PP8L's reconciliation findings in order to be able to act on PPSL s request to permit plant operation beyond 5% of power.
cc:
T. Novak A. Schwencer T. Sullivan D. Terao John J. Stefano, Project Manager Licensing Branch Ho. 2 Division of Licensing DISTRIBUTION:
Document Control (50-387/388)
NRC PDR PRC System LB&2 Rdg BJYoungblood MRushbrook RPerch O
iCEP SURNAME DATE DL:L~
~ ~
~i JStefa:cw
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ \\ ~ ~ ~ ~ ~ ~
1 0/
82 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1881 33&%0
l~
I I
'3