ggl7$ 82 o
~ocket:Ho..:~0.-387'PPLICANT:
Pennsylvania Power 8 Light Company FACILITY:
Susquehanna Steam Electric Station, Unit 1
SUBJECT:
SUMMARY
OF JULY 12,
- 1982, SENIOR HANAGEMEHT SITE VISIT AT SUSQUEHANNA STEAtl ELECTRIC STATION, UNIT 1 On July 12, 1982, representatives of the NRC staff met with the applicant to discuss the status of Susquehanna, Unit 1 with regard to readiness for fuel loading and low power testing.
The meeting was held at the Susquehanna Steam Electric Station.
A list of attendees is provided fn Enclosure 1.
The purpose of the meeting was to provide for senior HRC management review of the application prior to issuance of a low-power license.
The meeting began with a tour. of the training center followed by a general tour of the facility.
One concern expressed by the staff was the noise level fn the control room due to multiple communication networks in use.
PPSL addressed this issue to the staff in a letter dated July 16, 1982.
Following the plant tour the applicant made presentations fn a number of areas:
Management Organization PP8L's Nuclear Department Organization currently has about 800 personnel and a projected level of approximately 1100 personnel for two unft operations.
Current staffing at the site is above the needs for one unit operation but below the needs for two units.
Readiness and Training The Susquehanna Review Committee, which does the off-site revfew, currently consists of key managers in PPBL departments.
PPSL intends to add one outside consultant to this committee but no selection has been made.
An assessment of plant readiness was made by line management, the Nuclear Safety Assessment Group and Quality Assurance fn February
- 1982, and a report was issued.
00087 PDR OFFICE)
I ~ ~ ~ ~ ~ ~ ~ ~
~ o ~ ~ ~ ~ ~"
SURNAME P
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ oei ~ ~ ~ ~ ~ ~ ~ ~
DATE I7 In the area of operator licensing, PP8L stated that approximately 20 personnel have completed all operator examinations and walkthroughs for which they have not received the final results.
The NRC staff subsequently followed up on this item and provided the results to PPBL.
8209010015 820817
(
PDR ADOCK 050 NRG FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO; 1881 3N 860
0 ~
?I
)g
)~,g ~ 0
\\
~ he
Pennsylvania Power
& Light Company Revisions to D namic Analyses During the engineering turnover process between Bechtel and PP&L, ar ithematic errors and analyst judgment errors were noted in the horizontal dynamic model.
The reactor/control structure was reviewed and both the East-Hest and Nor th-South models were rerun.
PP&L' evaluation on the revised analyses was that no system or equipment changes are needed.
This item is the subject of a meeting between PP8L and the NRC staff on July 13, 1982.
Status of Resident Inspector Items.
Ninety-six items remain outstanding at the time of this meeting.
Of these 57 items remain to be closed out prior to fuel load.
PP&L anticipants these items will be completed prior to July 17, 1982.
Of the remaining
- items, 23 are to be closed out prior to initial criticality and the other 16 at later dates.
Enclosure:
As stated Robert L. Perch, Project t1anager Licensing Branch No.
2
'ivision of Licensing cc w/encl.:
See next page OFFICES SURNAME/
DL:LBk'2 RPerch/lg 8/F6782"'"""'ATE P
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~
~ ~
NRG FORM 318 (10-80) NRCM 0240 DL:
~ eeeeeo i
~
oo oat
~ ~
o ~
~ ~ ~
~ oooe ~ Ssss
~ ~
~
~ ~ ~ ~ o ~ ~ ~
~ sooo ~ ~ ~ ~ ~ ~ e ~
BJYo n od
'8/t"/'52"""'"
OFFlClAL RECORD COPY USGPO: 198$ -335.980
"e e
~ ~
~y tl I
I
\\
~
- Susquehanna SO C
i0 0 t1r. Norman W. Curtis Vice President Engineering and Construction Pennsylvania Power
& Light Company Allentown, Pennsyl vania 18101 ccs:
~ Jay Silberg, Esquire Shaw, Pittman, Potts
& Trowbridge 1800 H Street, N.
W.
Washington, D.
C. 20036 Edward H. Nagel, Esquire General Counsel and Secretary Pennsylvania Power
& Light Company 2 North Ninth Street i
Allentown, Pennsylvania 18101 ter. William E Barberich Nuclear Licensing Group Supervisor Pennsylvania Power
& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101
.Yir. G.
Rhodes Resident Inspector P. 0.
Box 52 Shickshinny, Pennsyl vani a 18655 Gerald R. Schultz, Esquire Susquehanna Envi roanental Advocates P. 0. Box 1560 Wilkes-Barre, Pennsyl vania 18703 Hr. E. B. Poser Project Engineer Bechtel Power Corporation P. 0.
Box 3965 San Francisco, Cali fornia 94119 I
Dr. Judi th H. Johns rud Co-Director Environmental 'Coalition on Nuclear Power 433 Orlando Avenue State College, Pennsylvania 16801 Ns. Colleen flarsh P. 0.
Box 538A, RD
.,4 t1ountain Top, Pennsylvania 18707 tir. Thomas J. Halligan Correspondent The Citizens Against Nuclear Dangers P. 0.
Box 5
- Scranton, Pennsyl vania 18501 lir. J.
W. Nillard Project Manager Hail Code 395 General Electric Company
'75 Curtner Avenue San Jose, California 95125 Robert W. Adler, Esquire
,. Office of Attorney General 505 Executive House P. 0.
Box 2357 Harrisburg, Pennsylvania 171'20
- tip, R,
Haynes, Administration U,
S. Nuclear Regul..atory Coruission-Region I 631 Park Avenue "King of Prussia, Pennsylvania 19405 lir. Thories H. Gerusky, Director Bureau of Radiation Protection Resources Commi nwealth of Pennsylvania
.,P. 0.
Box 2063 Harri sbur g, P ennsyl va ni a 17120 1
+e Enclosure 1
List of Attendees IIRC Staff PPSL Staff H. Denton S. J.
Youngblood R. Perch G. Rhoads J.
IIcCann J. Kauffman J.
Calhoun N. Curtis B. Kenyon H. Keiser T. Crimmins A. Sabol W. Oarberich R. Harris OFFICEI SURNAME/
DATEf
~
~ 0
~ ~ ~ ~ ~ ~ ~ ~
~\\ ~ ~ ~ 0 ~ ~
~
~ ~
~ ~ 0
'I
~
~ ~ 0 ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ 0 ~i~ ~I ~ ~ ~ 0 ~ ~I~ ~ 1
~ ~ ~ ~ ~ ~
~ 0 ~ ~ ~ 0 ~ ~ 0
~ ~ 0 ~ ~ ~ ~
~ 0 ~ ~ ~ ~
~\\ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~
~
~ ~ ~ ~ ~ ~ ~ ~I~ ~ ~ ~ ~IM NRC FORM 318 (10.80) NRCM 0240 OFFICIAL RECORD COPY USOPO: 1981~960
~ ~
0 ~
I c
f I
j iH~+
L pp MEETING
SUMMARY
QDocument Control-(50=387)>
NRC,PDR L PDR TERA NSIC LB82 Rdg.(2)
MRushbrook Project Manager R. Perch
- Attorney, OELD OIE Regional Administrator, Region I
AUG I 7 1982 PARTICIPANTS NRC:
H. Denton J.
Youngblood R. Perch G.
Rhoads J.
McCann
1 ~
Ci
~
~
f II I
~ t I II