OCT 2 1 1980 g I/7
, Licensing Branch No. 1, DL ct Manager, Licensing Branch No. 1, DL ORECAST November 6 and 6, 1980 10:30 N as Susquehanna Si te B.eniick, Pennsylvania NRC. case load forecast panel meeting and site visit for %he Susquehanna site (see agenda)
Docket Noa.: SO~
I;",".l!!l1IgfP t1910RANDUH,FOR:,B. <J; 'Youngblood, Chief
, 'R$ 1.,,;-'-, =,.--'-,.:, ";:,.Richa'rd-5'tark, Proje
-.".; SUBilXCT'~ ".~<'~".,':;- SUSgUEffANHA'.CASE'OAD F
'- 'jDPT$'AND"Il:IME:"'.;:".-;.=-
';-'-.=,:-,.LOCATION:-,-,.a PURPOSE:.;
-.'ARTICIPANTS:;
h
~e NRC Staff W. Lovelace, R. Stark, R. Gallo Penns lvania Power and Li ht Co.
B. Barberich Enclosure; As sta'ted.
Richard N. Stark, Project f1anager Licensing Branch No.
1
'ivision of Licensing cc:.
,See next page Se i.0se0N~
OFFICE SURNAME Ol..L RStark/ys JY un blood DATE/.10/g/80 10'"/ 0-.
~
q
~
. NRC, FORM 316 (9-76) NRCM 0240 i
OU.S. GOVERNMENT PRINTING OFFICE 1979.289.369
tf
~
~
)~
fl L
,J
'C t
~(r SUSQUEHANNA PROJECT CASELOAD FORECAST PANEL SITE VISIT,
'EETING AGENDA l
l.
Overview of project construction schedule including progress'nd major milestones completed since Caseload Panel visit of March 1980 current problems and any anticipated-problem areas that may impact the current projected fuel load date.
2.
3.
5.
6.
7..
Detailed review and current status of design and engineering effort (by major discipline) including any potential problems that may arise from necessary rework.
Detailed review and current status of procurement activities including valves, pipe, instruments,
- cable, major components, etc.
Actual and proposed craft work force (by major craft), craft availability, productivity, potential labor negotiations and problems.
Detailed review and current status of all. large and small bore pipe hangers, restraints,
.snubbers, etc., including design, rework, procurement, fabri,cation, delivery and installation.
Detailed review of project schedule identifying critical path it'ems, near critical items, amount of float for various activities, the current critical path to fuel loading, methods of implementation, of corrective action, for any activities with negative float, and provisions for contingencies.
The estimated project percent complete as of November 1, 1980.
Detailed review and current status of bulk quantities including current estimated quantities, quantities installed to date, quantities scheduled to date, current percent complete for
- each, actual versus forecast installation rates, and basis for figures.
(a)
Concrete
{CY)
(b)
Process Pipe
{LF)
- Large Bore~Pipe (2 1/2" and larger)
- Small Bore, Pipe (2" and smaller)
(c)
Yard Pipe (LF)'d)
Large Bore Pipe Hangers, Restraints, Snubbers (ea) 1
~I Jl I
t (e)
Small Bore Pipe Hangers, Restraints (ea)
(f)
Cable Tray (LF)
(g)
Total Conduit {LF)
(h)
Total Exposed Metal Conduit (LF)
(i)
Cable (LF)
- Power
- Control
- Security
- Instrumentation
- Plant Lighting (j)
Terminations (ea)
- Power
- Control
- Security
- Instrumentation
- Plant Lighting
{k) Electrical Circuits (ea)
- Power
- Control
- Security (1)
Instrumentation (ea) 8.
Detailed review and current status p'f preparation of preop test procedures, integration of preop test activities with construction
- schedule, system turnover schedu'le, preop test
- schedule, current and proposed preop test program manpower.
(a) b)
c)
(d)
(e)
(f)
(g)
(h)
(i)
Total number of procedures required for fuel load.
Number of draft procedures not started.
Number of draft procedures being written.
Number of procedures approved.
Number of procedures in review.
Total number of preop tests required for fuel load.
Number of preop tests completed.
Number of preop tests currently in progress.
Number of systems turned over to start-up.
9.
Detailed discussion of potential schedular influence due to changes attributed to NUREG-0660, NUREG-0694 and other recent licensing requirements.
10.
Detailed discussion of 50.55E items and thei r impact on the schedule.
11.
Site tour and observation of construction activities.
Mr. Norman W. Curtis Vice President - Engineering and Construction Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 CC:
Mr. Earle M. Mead Project Engineering
- Manager, Pennsylvania Power
& Light;Company
,2 North Ninth Street Allentown, Pennsylvania 18101 Jay Silberg, Esq.
- Shaw, Pittman, Potts Trowbridge 1800 M Street, N.
W.
Washington, D.
C.
20036 Hr. William E. Barberich, Nuclear Licensing Group Supervisor Pennsylvania Power
& Light Company 2 North Ninth Street Al1entown, Pennsyl vania 18101 Edward M. Nagel, Esquire General Counsel and Secretary Pennsylvania Power
& LighttCompany 2 North Ninth Street Allentown, Pennsyl vani a 18101 Bryan Snapp, Esq.
Pennsylvania Power
& Light>Company 2 North Ninth Street Allentown, Pennsyl vani a 18101 Robert M. Gallo Resident Inspector P. 0.
Box 52 Shickshinny, Pennsylvania
- 18655 John L., Anderson Oak Ridge National Laboratory Union Carbide Corporation
'ldg;-
- 3500, P. 0.
Box X
Oak Ridge, Tennessee 37830 Mr. E.B. Poser Project Engineer Bechtel Power Corporation P.
0 ~
Box 3965 San Francisco, California 94119 Matias F. Travieso-Diaz, Esq.
Shaw, Pittman, Potts Trowbridge 1800 M Street, N.
W.
Washington, D.
C.
20036 Dr. Judith H. Johnsrud Co-Director Environmental Coalition on Nuclear Pow'er 433 Orlando Avenue State College, Pa 16801 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Department of Environmental Resources Coranonwealth of Pennsylvania P.
0.
Box 2063 Harrisburg, Pa 17120 Ms. Colleen Marsh Box 538A, RDP4 Mountain Top, PA 18707 Mrs. Irene Lemanowicz, Chairperson The Citizens Against Nuclear Danagers ll P. 0.
Box 377 RD>/1
- Berwick, PA 18503 Mr. J.W. Hillard Project HAnager Mail Code 394 General Electric Company 175 Curtner Avenue San Jose, California 95125
,Docket File NRC PDR Local PDR TIC NSIC Branch File H. Denton E.
Case D. Eisenhut R. Purple T.
Novak S;
Varga T. Ippolito R.
A. Clark R.
Reid R. Tedesco J.
Youngblood A. Schwencer F. Mirag1 i a J.
R. Miller G. Lainas D. Crutchfield W. Russell J. Olshinki R. Vollmer R.
Bosnak F. Schauer R.
E. Jackson G. Lear V. Noonan S. Pawlicki V. Benaroya Z. Rosztoczy W.
Haass D. Muller R. Ballard W.
Regan J.
D. Saltzman D.
Ross P.
Check R. Satterfield
- 0. Parr F.
Rosa W. Butler W. Kreger R.
W. Houston T. Murphy W. Gammill L. Rubenstein T. Speis W. Johnston B. Grimes H. Collins F.
Pagano S.
Ramos J.
Krammer MEETING NOT
~ *
~~$ +gS ~
ICE OISTRIBUTION OCP g
TB Sto1z S.
Hanauer P. Collins D. Vassallo D. Zi emann R. h1attson R. Schroeder K. Kniel D. Skovholt G. Knighton M. Ernst R. Baer E.
Adensam A. Thadani ACRS (16)
- Attorney, OELD OIE:(3)
OSD (7)
Project Manager RStark Licensing Assist~ant Receptionist TERA J.
- LeDoux, I&E V. Moore I8E Headquar ters I8E Region I
I &E Regi on I I I&E Region III I8E Region IV I8E Region V
NRC
Participants:
W. Lovelace, R. Stark, R. Gallo Penns lvania Power and Li ht Co.
B. Barberi ch bcc:
Applicant
& Service Liqt
r V
~
~
<>tJ<