The purpose of the NRC draft statement is to evaluate the potential environmental impact of the reservoir and to encourage a discussion by PP8IL and other interested parties.
The draft statement should not be interpreted as a final statement.
The NRC draft statement has been reviewed by PPSL.
On Nay 29, 1980, PP8L sent the following response to the NRC,'", "He (PPEL) are currently reviewing the design concept for the spillway and will consider the NRC's comments in this review..
As design approval for the, project will rest with the Pennsylvania Department of Environmental Resources, the design will meet their criteria.
He (PP8IL) will inform the NRC of any revisions to the spillway concept."
The Pond Hill Reservoir and its dam are being constructed because the Susquehanna River Basin Commission requires that water consumption be compensated by users during periods of low river flow.
The reset voir is not needed for the safe operation or shutdown of the nuclear power plant.
The NRC is, therefore, not reviewing the safety of the dam but rather the potential environmental impact of the construction and operation of the dam.
The NRC will complete its environmental impact review and document the results in the Final Environmental Statement scheduled for completion December 1980.
For additiona'l information regarding the dam design criteria and dam safety, we suggest that you contact the Pennsylvania Department of Environmental Resources, P. 0. Box 2063, Harrisburg, Pennsylvania 17120.
Sincerely, yY
>gC (Signed) T. h RdIm b~
~ Hilliam J. Dircks, Acting Executive Director for Operations 6
~oig, DISTRIBUTION:*w/incoming DOCKET FILE*
RStark BSnyder TERA MRushbrook*
BGrimes NRC/PDR*
RVollmer SHanauer L/PDR*
OELD AUG 1. 8 1980 EDO Rdg GErtter (ED0809257)
NRR Rdg EHughes LB81 Rdg*
LStowers HDenton MFudge The Honorable Raphael Musto AFerguson United States House of Representatives RHattson OIE (3)
Hashington, D. C.
20515 DEisenhut PPAS Rdg RPurple DRoss
Dear,
copgressmah<
Nusto:.o:
RTedesco SECY (3') (80-1339)
JYoungblood JCook In your letter of June 26, 1980 you requested that NRC comment on a letter written by one of your constituents, t<s. Kathie Spallone.
Her letter addressed the potential impact of a dam failure of the Pond Hill Reservoir which Pennsylvania Power and Light Company
{PPSL) is considering for future construction.
Her letter refers to the NRC draft statement which is documented in NUREG-0564.
8/ /
909100 CDW2 L:LBg MSta Rushb 8/6/80 OFFICE I/I SURNAME)
OATE l>
D 1
1 Qd 8/
80 DL:AD/
~
~
RLTedes 8/7./80 hut
/fi/80 DI to 8
/80 EDO HJDircks
/
/80 NRC FORM 318 (9.76i NRCI'/I 0240 OV.S, GOVERNMENT PRINTING OFFICE: 1979.289.369
~
tJ
"~
<<II
)
)g.g4.
l g lg al ta 'ps r
h II d
~'
~% MOg, f>
~4 0
0
+**41 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C.
20555 dY McceP
~NcdC@ >gg
~,>ROUTjNG AF>t T=WNSMITTAL SUP TO: (Name, oNce symbol, room number, building, Agency/Post) x.
B. Youn blood Date Initials Date 7/29/80 2.
/
S.
ction roval s Re uested ircuiate mment Coordination File For Clearance For Correction For Your Information Investigate Justi Note and Return Per Conversation Prepare Reply See,Me Signature Please have the letters on Pond Hill reservoir (Susquehanna?)
revised to reflect Hr. Cutchin's comments (attached).
If you need help, Hr. Cutchin will wor}; with you.
DO NOT use this form as a RECORD of approvals, concurrences, disposals, ciearances, and similar actions FROM: (Name, org. symbol, Agency/Post)
Room No.Bldg.
Joe Scinto Phone No.
so41-102 OPTIONAL FORM 41 (Rev. 7-76)
PTsscrlbsd b~ GSA
- V.S. CCVSRNMCNT FRINTINC OFF ICED ISTQ 280 I SS/l2
c
~(7~
Comments on Letters to Congressmen Schweiker and Musto about
'Potential Dam Failure at Pond Hill Reservoir These letters do not, but should, put the NRC's statements in NUREG-0554 about potential dam failure at Pond Hill Reservoir in better perspective.
/e A
(Each letter should also mention that the same request by the same Constituent was referred to us by the other Congressman.)
Pond Hill Reservoir and its dam are not being constructed because the water source is required for safe operation or l~tKi ~ of the nuclear plant but because the Susquehanna River Basin Commission requires that river." flows be supplemented by users during periods of low flow.
Because the reservoir and
'its dam are not safety-related, the NRC is not reviewing the dam's design for he purpose of approving the cLam's design, but for the purpose of evaluating the potential environmental impacts that might result from the dam's construction
'and operation as designed.
However, the criteria used by the NRC in evaluating the potential environmental impacts that might result from construction and ope'ration of a non-safety-related dam are the same as those that it (and other major federal 'agencies with dam design review functions) would use in assessing and approving the design adequacy of safety-related
<<ha~'s Using those criteria NgC.
predicts potential failure of the dam if it is subjected to a maximum probable i
flood.
Because NRC disclaims design approval responsibility and authority for this dam, I suggest that the penultimate paragraph be deleted, or modified to.make clear that further. review of spillway design is being conducted solely for the purpose of determining whether our conclusions about potential dam failure would change.
Finally, I suggest that Bill Bivins, Hydrologist and NRC Dam Safety Officer, be given an opportunity to comment on the proposed letters before they are finalized and dispatched.
Itu;r.t James H. Cutchin, IV
- Attorney, OELD
~Pi
's!
C g)
V
a m
DISTRIBUTION:"w/incoming DOCKET, FILE* OELD TERA GErtter (EDO¹09257)
NRC/PDR*
EHughes L/PDR*
NFudge EDO Rdg LStowers NRR Rdg AFerguson LB¹1 Rdg*
OIE (3)
HDenton PPAS Rdg ECase DRoss RMattson SECY (3) (80-'1339)
DEisenhut JCook The Honorable RaPhael gusto Rpurple BSnyder,y-.'"
United States House of Representatives Washington, D. C.
20515 JYoungblood SHan'uer RStar k Dear Representative Nusto:
NRushbrook*
RVollmer In your letter of June 26, 1980, you requested the>t<RC comments on a letter written by one of your constituents, h1s. Kathie Spallone.
Her letter addressed the potential for dam failure of the Pond Hill,lfeservoir which Pennsylvania Power and Light Company (PP&L) is considering/For future construction.
Her letter refers to the NRC study which is docyRiented in the Supplement to NUREG-0564.
The NRC hydrologic criteria weFe developed by the NRC staff for safety related nuclear power plant dams uhder very severe conditions.
The Pond Hill reservoir is not safety relat/d.
NUREG-0564 discusses the differences<'between the NRC hydrologic criteria and the hydrologic criteria used by PP&I..
The NRC study has been reviewed by PP&L.
On fly'9, 1980, PP&L seng~~the following response to the NRC; "Lle (PP&L) are currently reviewing the design concept for the spillway and will consider the NRC's comments in this review.
As design approval for the project will rest with the Pennsylvania Department of Environmental Resources, the final design will meet their criteria.
Me (PP&L) will inform the NRC of any revisions to the spillway concept.","
The NRC will complete oar review of the spillway design during the Final Environmental Statement preparation scheduled for December 1980; however, it remains our position~)that the dam serves no essential safety function and therefore would not~be subject to NRC review.
/f Consequently, foyf~further Information regarding the dam ue suggest that you contact the Peqnsylvania Department of Environmental Resources, P. P.
Box 2063, Harri sburg, Pennsyl vani a 17120.
pl J Sincerely, a ~ 4 William J. Dircks, Acting Executive Director for Operations OELD 7/
/80 OFFICE/
SURNAME OATEP 7/22/80 RS ta,rk/.
HRushbro DL B
gb ood 7
/80 DL:
L RLT sco fizwo RP.ur.pl e..
DEisenhut 7/" '/8'0 "
Ebs e HDenton 7'/"/80'DO llJDirdks 7/'/80 ""
NRC FORM 318 (9.76) NRCM 0240 4U.S. GOVERNMENT PRINTING OFFICE': 1979.289.369
. ~
E 11
~
II
~
')p');l"Iug)
I I
~ kl4 I)I
FROM:
.Rep.
Raphael tlusto TO:
Chairman Ahearne ACTION CONTROL COMPL DEADLINE ACKNOWLEDGME I'NTERIM REPLY FINAL REPLY F I LE LOCATION 7/16/
CONTROL NO09257 DATE OF DOCUMENT 6/26/80 PREPARE FOR SIGNATURE OF:
Q CHAIRMAN fP EXECUTIVE D I RECTO R OTHER:
DESCRIPTION Q LETTER Q MEMO Q REPORT Q OTHER SPECIAL INSTRUCT 0 NS OR REMARKS Ltr from Kathie Spallone concerning the Pond Hill Reservoir which Pennsylvania Pow Im Light is intending to construct near the site of the Berwick plant CLASSIF IED DATA GP~
5'ca~~(N l%ggH rA
'7 ll B
DOCUMENT/COPY NO.
NUMBER,OF PAGES POSTAL REGISTRY NO.
ASSIGNED TO:
DATE CLASSIFICATION CATEGORY Q
NSI QRD Q FRD INFORMATIONROUTING J.
Cook Vollmer Denton Case Hanauer PPAS Hattson Snyder SECY 80-1339 LEGALREVIEW Q
FINAL Q
COPY DATE ASSIGNED TO:
NO LEGAL OBJECTIONS NOTIFY:
Q EDO ADMINCc CORRES BR EXT.
COMMENTS, NOTIFY:
EXT.
JCAE NOTIFICATION RECOMMENDED:
Q YES Q
NO NRC FORM 232 (11-75)
EXECUTIVE DIRECTOR FOR OPERATIONS PRINCIPAL CORRESPONDENCE CONTROL OO NOT REIIOVE THIS COPY
FROM:
,Rep.-Raphael l1usto TO:
Chairman Ahearne ACTION CONTROL COMPL DEADLINE ACKNOWLEDGME INTERIM REPLY FINAL REPLY FILE LOCATION 7/16 OBP.57 DATE OF DOCUMENT 6/26/80 PREPARE FOR SIGNATURE OF:
P CHAIRMAN fI EXECUTIVE D I RECTO R OTHER:
DESCRIPTION Q LETTER Q MEMO P REPORT Q OTHER Ltr from Kathie Spallone concerning the Pond Hill Reservoir which Pennsylvania Pow
& Light is intending to construct near the site of the Berwick plant SPECIAL INSTRUC 0NS OR REMARKS Scl~c(~ I+w1 cm I
"I /I DOCUMENT/COPY NO.
C LASS IF I ED DATA CLASSIFICATION NUMBER OF PAGES POSTAL REGISTRY NO.
ASSIGNED TO:
DATE CATEGORY P
NSI Q 'RD 'P FRD INFORMATION ROUTING J.
Cook Vollmer Denton Ross Case Hanauer PPAS Hattson Snyder SECY 80-1339, Sw LEGALREVIEVI ASSIGNED TO:
DATE P
FINAL Q
COPY NO LEGAL OBJECTIONS NOTIFY:
COMMENTS, NOT IF Y:
EXT.
Q YES P
NO JCAE NOTIFICATIONRECOMMENDED:
NRC FORM 232 (11-75)
EXECUTIVE DIRECTOR FOR OPERATIONS PRlNCIPAL CORRESPONDENCE CONTROL DO NOT REIiIOI/E THIS COPY
NRC SECRETARIAT 80 Na, TO>> 0 Commissioner
'5 Exec. Dir./Oper.
0 Cong. Liaison O Public Affairs Logging Date 7 1/80 Date 0
Gen. Counsel 0 Solicitor O Secretary 0
Inspector & Auditor Policy Evaluation Incoming:
From:
Re Ra To:
Subject:
Date L/MI-I' XQX Prepare reply for signature of:
0 Chairman 0 commissioner Q~GC, CL, SOL, PA, SECY, IA, PE 0
Signature block omitted Date due:
Ju1y 9
f",dC'tj Off. KLIG Date...,,... 7 J..-Pp-~li
~r&il 0
For information 0 Return original of incoming with response 0
For direct reply' For appropriate action OCA to Ack For the Commissicb:
'Send three I3) copies of reply to Secy Correspondence and Records Branch NRC42 ACTION SLIP
~ ~
I
~
~
RAPHAEL MUSTO I ITH DISTRIQ; PCNNSTLVANIA 1338 LoNOTRHITH Noose Orncc OVILDIHo WASHIHCTON. D.C.
20515 (202) 2L40511 EDUCATION AND LABOR COMMITTEE (it:OIIIIr2SS Of tI)2 (HIIifebStateS 390use nf 3Reyt;eserrtatibes KaSfjf'trgtoff,S.C.
205l5 June 26, 1980 Hon. John F. Ahearne
- Chairman, Nuclear Regulatory Commission.>>
Rm. H-1165 Matomic Bldg.
1717 H. St.
Washington, D.C.
20555 HOMO DlSTRICT ORFICCS I 85 ORTDCN PITTSTCN, PcHNSTLvAIRA
'18840 (717) 854 1483 I,
OICCHTCHHIALOVILDIHO 15 PVRLIc SCDARc WIUICS OARRC, PCHNSYI VANIA 1870'I (717) 823 7307 823-7308
'i I 812 NCRTHCASTCRN BANN OvILDIHo HACLcIDN. PCHHSTLVAHIA 18201 (717) 459%895 459~98 I
28 FLRST STRCCT BI4IOMSIRIRo, PSNNCTI.YAIVA 17815 (717) 784&SSI 784&552 t
I I L, P
'IIIH "7
l
Dear Mr. Ahearne:
,W Enclosed please find. a constituent letter concerning""
the Pond Hill Reservoir which the Pennsylvania Power and-,
Light Company is intenting to construct near the site oX the Ber'wick, Pa. plant.
j: would greatly appreciate your
~
I'omments on this letter.
Sincerely yours,'M/11 RAPHAEL M STO, M.C.
~
~
~
~
~ ~
N
~ l 0
~ j It
)t d
Samuel Chilk, Secretary U.S. Nuclear Regulatory ommission
'tt Docketing a Service Branch Washington, D.C.
20555 ocrmF-~
USVRO APR <0>S80 >
OfticB g@s
~>>g~g &Q7k8 gynic '~ +
,Mr. Chilk, I am writing to request time to make a Limited Appearance Statement at the licensing hearing's for Pennsylvania Power and Light's Susquehanna Steam Electric Stations 1 and 2 under construction in Berwick, Pennsylvania (Docket numbers 50-387 and 50-388).
Please inform me when and where, these hearings will take place and when I will be able to speak.
I also would like to request that time be made available in the evenings and~ or on weekends for these statements to insure grea er public input.
Thank you, 8&4'/8./
fpor ~~ ~f '~~
~fc
@pl L jY~
UNITED STATES OF Ai~lERICA NUCLEAR REGULATORY CO~QIISS ION In the Matter o PENNSYLVANIA POWER AND LIGHT COMPANY (Susquehanna Steam Electric Station, Units 1 and 2)
)
)
)
)
)
)
)
)
)
Docket No.(s) 50-387 50-,388 CERTIFICATE OF SERVICE I hereby certify that I have this day served the foregoing document(s) upon each person designated on the official service list compiled by the Office of the Secretary of the Commission in this proceeding in accordance with the requirements of Section 2.712 of 10 CFR Part 2-Rules of Practice, of the Nuclear Regulatory Commission's Rules and Regulations.
Dated at Washington,D.C. this day of I 19'\\
Offic f the Secretary of the ommission
UNITED STATES OP AMERICA NUCLEAR REGULATORY COi ISS ION In the Matter of PENNSYLVANIA POWER AND LIGHT
(Susquehanna Steam Electric Station, Units 1 and 2)
)
)
)
)
)
)
)
Docket No.(s) 50387 50-388 SERVICE LIST Charles Bechhoefer,'sq.,
Chairman Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Dr. Judith H. Johnsrud Co. Director, Environmental Coalition on Nuclear Power 433 Orlando Avenue State College, Pennsylvania 16801 Mr. Glenn O. Bright Atomic Safety and Licensing Board U. S.Nuclear Regulatory Commission Washington, D. C.
20555 Dr. Oscar H. Paris
~
Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Counsel for NRC Staff Office of the Executive Legal Director U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Jay E. Silberg, Esq.
Shaw, Pittman, Potts
& Trowbridge 1800 "HY Street, N.W.
Washington,'D.C.
20036 Pennsylvania Power and Light Company ATTN:
Hr. Norman W. Curtis Vice President Engineering and Construction.
2 North Ninth Street Allentown, Pennsylvania 18101 Hs. Colleen Marsh 558A
'R.D.
//4 Mount Top, Pennsylvania 18707 Hr.
Thomas J. Halligan Correspondent CAND P.O.
Box 5
Sacranton, Pennsylvania 18501 Gerald Schultz, Esq.
Susquehanna Environmental Advocates 174 Machell Avenue Dallas, Pennsylvania 18612 Hr. Thomas H. Gerusky, Director Bureau of Radiation Protection Department of Environmental Resources Commonwealth of Pennsylvania P.O.
Box 2063 Harrisburg, Pennsylvania 17120 Albert E. Vogel, Jr.,
Esq.
Assistant Attorney General Dept. of Environmental Resources P.O.
Box 2357 Harrisburg, Pennsylvania 17120
L 0