Notice of Violation from Insp on 790726-27,0802,09 & 23, 1029-30,1102 & 06-09
ML17138B371
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 03/03/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17138B368 List:
References
50-387-79-20, NUDOCS 8006240581
Download: ML17138B371 (2)


Text

APPENDIX A NOTICE OF VIOLATION Pennsylvania Power 8 Light Company Docket No. 50-387 This refers to the investigation conducted by a representative of the Region I (Philadelphia) office at the Susquehanna Unit 1 site and at your corporate office of activities authorized by NRC License No.

CPPR-101.

During this, investigation, conducted on July 26 and 27; August 2, 9, and 23; October 29 and 30; and November 2 and 6-9, 1979; the following apparent items of noncompliance were identified:

A.

10 CFR 50, Appendix B, Criterion 1, states:

"...persons and organizations performing quality assurance functions shall report to a management level such that this required authority and organizational freedom, including sufficient independence from cost and schedule...are provided."

Contrary to the above, the project files for 1973-1979, including the minutes of the scheduled monthly meetings that were held at G.E..between 1977-1979, show that PP8L's Engineering Department was responsible for both (1) quality assurance for the ACR/PGCC equipment and (2) expediting deliveries of this equipment when the schedule slipped.

This. apparent lack of independence of quality assurance functions was further substan-tiated by interviews with PPSL personnel.

This item is an Infraction.

B.

10 CFR 50, Appendix B, Criterion VII, states:

"Measures shall be estab-lished to assure that purchased materials, equipment...conform to the procurement documents...The effectiveness of the control of quality by contractors and subcontractors shall be assessed by the applicant...."

PAL gA Manual Procedure 8.1 specifies that the Manager-Nuclear guality Assurance is responsible for timely evaluation of the pr'oposed contractors gA/gC system by auditing the contractors operations or by reviewing the documents which describe his gA/gC system.

Contrary to the above, General Electric, a contractor, supplied defective power generation control complex electrical equipment to the project with

'product quality certificates which certified "that the products identified herein have been manufactured under a controlled quality assurance program..."

The licensee had not carried out a timely evaluation of the effectiveness of the contractor's quality control department responsible for the quality control of the defective equipment and preparation of the certificate of quality.

This item is a deficiency.