Forwards Revision to Des Suppl,Pond Hill Reservoir Evaluation.Revision Necessitated by Changes to Locations & Configurations of Pumping Plant & Pipelines Recently Proposed by Applicant
ML17138B076
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/15/1980
From: Bivins W
Office of Nuclear Reactor Regulation
To: Sells D
Office of Nuclear Reactor Regulation
References
NUDOCS 8002150208
Download: ML17138B076 (5)


Text

Docket Nos.

0-387 and 50-388 JAN 1 5 t980

/y

/gjg@)

MEMORANDUM FOR:

Dooald E. Sells, Acting Chief Environmental Pro)ects Branch No, 2, DSE THRU:

FROM!

SUBJECT:

L. G. Hulman, Chief Hydrologykfeteorol ogy Br anch, DSE William S. Bivins, Leader Hydrologic Engineering Section, 'HMB, DSE REVISION TO THE HYDROLOGIC ENGINEERING INPUT TO THE DRAFT ENVIRONMENTAL STATEMENT SUPPLEMENT POND HILL RESERVOIR EVALUATION PLANT NAME:

Susquehanna Steam Electric Station, Units 1 and 2

LICENSING STAGE: 'L RESPONSIBLE BRANCH!

EPB)02 S ~ Bajwa, EPM le Enclosed is a. revision to the subject DES.Supplement.,

This revision was necessitated by changes to the 1ocati ons and configurat ions of the pumping plant and pipel ines recently proposed, by the applicant.

Our.revision is based upon information submi tted by applicant and information. obtained dur ing a telephone conser vation with tbe applicant on.January 7, 1980.

The applicant. stated that the.informati on provided during that.telephone conservati on would be documented by a formal submittal to NRC<

If you have any questions regarding this matter, please contact M. Fliegel, e'xt;,

280284 Enclosure!

As Stated cc:

w/enclosure D. Muller W. Krcger L ~ Hu lman G~ Lear M. Bivins M.- Fliegel S ~ Bgwa NRC PDR LPDR S

18 Original Signed by WilliamS ~ Bivins i<illiam S. Bivins, Leader Hydrologic Engineering Section Hydrology-Meteorology Br'anch, DSE DISTRIBUTION:

DOCKET FILES (50-387/388)

NRR RDG HMB RDG DS

'M '. k'm

// 4 OFFICE/

SIJRNAME DATE}

NRC'FORM 3) 9 (9 76) NRCh'249 DS AS iv ns O.g..y 5.0.P.

LS 01/ p/00 01/J

/80

)I.S GOVEANI"E)MT +R)NTING OF<IGE: )979 269 369

,y

~'

yf F P

P

~

I P

pvr r

I

,P

~'l V

P A 'A' O'I ~ I rr I

I P

h ~ ZI 1 I

If

~ f\\

Ah f

I

~

I

~ 4 A

~

II

~

~

~

~

h

~

I'I y

I vrf I ~

I A'

I I

I A

I r ~

V,VP ~

VI V

I I

'A l M

~

I

~ ~

f I

lI v

, r V

~. I

~

V I

=

I A

~

~ ~

P I

p' r'

~

~ A.

r P I I

  • fr F

A

~

~

Ph V

~ ~

+$4 4t

Docket Nos 5

387 and ~0-388 JAN 15 1980 HENORANDUM FOR:

Donald E. Sells, Acting Chief Environmental Prospects Branch No. 2, DSE THRU::

FROM:

SUBJECT:

L. G. Hu'lman, Chief Hydrologydfeteorology Branch, DSE

, tJilliam S. Bivins> Leader Hydrologic Engineering Section, HhB, DSE REVISION TO THE HYDROLOGIC ENGINEERING INPUT,TO THE DRAFT ENVIRONNENTAL STATEt'lENT SUPPLEMENT POND HILL RESERVOIR EVALUATION PLANT NAME:

Susquehanna Stean Electric Station, Units 1 and 2 LICENSING STAGE:

OL RESPONSIBLE BRANCH:

EPBP2; S. Bgvm, EPf4 Enclosed is a revision to the subject DES Supplement.

This revision was necessitated by changes to the locations and configurations of the pumping p'lant and pipelines recently proposed by the applicant.

Our revision is based upon information submitted by app'ficant and information obtained during a telephone conservation Mith the applicant on,january 7, 1900.,

The applicant. stated that the. information provided during that telephone conservation mould be documented by a formal submittal to NRC~

'f you have any questions regarding this matter, please contact R. Fliegel, ext, 28028.

Origim 1 Signadbv 5illiam S. Bivins Milliam S. Bivins, Leader Hydrologic Engineer ing Section Hydrology-tfeteorology Branch, DSE

Enclosure:

As Stated cc:

v</enclosure D. Huller H. Kreger L. Hulman G. Lear M

. Biv'fns 5l. 'Fliegel S. Bajva NRC PDR LPDR ACRS (18)

DISTRIBUTION:

DOCKET FILES (50-387/388)

NRR RDG HMB RDG

, DSE:H%;......

t<HF1iegel:km 01/14/80 OFFICE P SURNAME

'OATE$

NRC FORM 318 (9 76) NRCM 0240 DSE.:UNB.......QSK le.

llSBivins CIO/

/80 01/

/80 AU,S. GOVERNMENT PRINTING OFFICE: 1979'289 369

( ~

, 1

~

4 P

F ~

as I

th a

l e

t

REVISION TO THE HYDROLOGIC ENGINEERING INPUT TO THE DRAFT ENVIRONMENTAL STATEMENT SUPPLEMENT POND HILL RESERVOIR EVALUATION SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2 DOCKET NUMBERS 50-387 AND 50-388 Replace the last two paragraphs of Section

4. - Hydrologic Impacts of Construction with the following:

Water will be conveyed between the inlet-outlet structure in the reservoir and the pumping plant at the Susquehanna River, via pipeline.

The pipeline will be buried and will run parallel to the lower reach of Pond Hill Creek from downstream ot'he dam to the pumping plant.

Just below the dam a branch of main pipeline will run to the stream.

This will be used to divert natural streamflow during the construction of the dam and later, as described in Section 4.3.2,.to supply conservation flow to the stream.

The proposed location of the piimping station is adjacent to the railroad in an area outside-the 1 percent chance (100-year) floodplain as shown in figure (figure 11F of December 17, 1979 submittal).

Pipelines connecting the pumping plant to the submerged intake and discharge will be buried in the floodplain, The applicant has stated that after completion of e

'onstruction the land surface in the floodplain will be restored.

We

'I conclude that there is no practicable alternative to the construction in the floodplain of this section of pipeline and that the hydrologic impacts would be minimal.