APPENDIX A NOTICE 'OF 'IOLATION Pennsylvania Power 8 Light Company Docket No. 50-387 This refers to the inspection conducted by a representative of the Region I (Philadelphia) 'Office at the Susquehanna Steam Electric Station,

Berwick, Pennsylvania, of activities authorized by NRC License No.

CPPR-101.

During this inspection conducted on July 24-27, 1979, the following apparent item of noncompliance was identified.

10 CFR 50, Appendix B, Criterion VII, states in part:

"Measures shall be established to assure that purchased material, equipment, and services...

conform to the procurement document.

These measures shall include pro-visions...for source"evaluation and selection; objective evidence of quality...inspection...examination of product upon delivery..:."

Bechtel specificating C-16 for Susquehanna Steam Electric Station requires the welding to conform to AWS-D.l.l.

AMS structural welding code D.l.l, section 3.2.2 states in part:

"In all oxygen cutting, this cutting flame shall be so adjusted and manipulated as to avoid cutting beyond'(inside) the prescribed lines.'..."

Contrary to the above, as of July 24, structural floor beams coped for connection were burned and cut beyond the limit of prescribed lines.

Also, these items were inspected and accepted in fabrication shop, upon delivery to the site, and were installed in'structures.

This is an infraction.