ML17138A695
| ML17138A695 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 04/06/1979 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML17138A692 | List: |
| References | |
| 50-387-79-11, 50-388-79-07, 50-388-79-7, NUDOCS 7907230585 | |
| Download: ML17138A695 (1) | |
Text
APPENDIX A NOTICE OF VIOLATION Pennsylvania Power and Light Company Docket No. 50-387 This refers to the inspection conducted by a representative of the Region I (Philadelphia) office at the Susquehanna Steam Electric Station Unit 1, Berwick, Pennsylvania, of activities authorized by NRC License No.
CPPR-101.
During this inspection, conducted on March 6-8, 1979, the following apparent item of noncompliance was identified:
10 CFR 50, Appendix B, Criterion V, states, in part, that:
"Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings...
and shall be accomplished in accordance with these instructions, procedures, or drawings."
. The Susquehanna PSAR, Appendix D, guality Assurance
- Program, Paragraph D.2.5 states, in part, that:
"Activities affecting quality will be prescribed by documented instructions, procedures, or drawing appropriate to the circumstances..."
Bechtel Field Project Procedure E-8, Revision 0, states in Section
- 6. 3.1 that, "Aluminum conductors shall be thoroughly brushed with a fine bristle stainless steel wire brush immediately prior to installation of the conductor to remove any oxide film from the conductor strands. "
Contrary to the above, on March 7, 1979, the installation of terminations on twq 500 NCH aluminum conductors for the 250 VDC battery charger ID653B was completed without brushing with a wire brush as required.
This item is an infraction.
vaovss o UZI