APPENDIX A NOTICE OF VIOLATION Pennsylvania Power and Light Company Docket No. 50-387 This refers to the inspection conducted by a representative of the Region I (Philadelphia) office at the Susquehanna Steam Electric Stat'ion, Unit 1, Berwick, Pennsylvania, of activities authorized by NRC License No.
CPPR-101.
During this inspection, conducted on March 19-23, 1979, the following apparent items of noncompliance were identified:
A.
10 CFR 50.55a, Paragraph (d)(2), states, in par t:
"For construc-tion permits issued on or after January 1, 1971, but before July 1, 1974, piping which is part of 'the reactor coolant pressure boundary shall meet...
the requirements applicable to Class 1 piping of editions of Section III of the ASME Boiler and Pressure Vessel Code..."
The Susquehanna PSAR, Appendix A, states, in part:
"Piping... (is) separated into classifications...
and the applicable codes...
as indicated in Table A.2.l.a..."
Table A.2.2 specifies the feedwater system as Group A which corresponds to ASME Boiler and Pressure Vessel Code,Section III (ASME B&PVC).
The ASME B8PVC,Section III, Paragraph NB-4321, states, in part:
"Each... Installer... shall establish the procedure and conduct the tests required by this article and by Section IX of this Code..."
Section IX states, in part, in Paragraph gW-201.1:
"The welding procedure specification shall list in detail the...
variables described for each welding process as either essential or nonessen-tial."
Contrary to the above:
1.
Welding procedure specification DWP-S(I-1.4, Revision 1, was approved on January 9, 1979, and used to weld the internal diameter build up on feedwater safe ends N4A through N4F without addressing the essential variable gW-410.16.
It f:I
C Appen'dix A.
~
~
~
2.
Welding procedure specification DWP-SgI-1.4.1, Revision 0, was approved for use to weld the new safe ends to the feedwater system without addressing the essential variable gW-410.24.
This item is an infraction.
B.
10 CFR 50, Appendix B, Criterion V.states, in part:
"Activities affecting quality shall be prescribed by documented instructions...
and shall be accomplished in accordance with these instructions..."
The Susquehanna PSAR, Appendix D.3.3.7 states, in part:
"...Use of qualified procedures and application thereof as required Py estab-lished standards will be rigidly enforced..."
The Bechtel guality Control Instruction, P-1.10, Revision 7, Para-graph 2.4, states, in part:
"Inspect the internals of the piping components and any adjacent components accessible at the time of installation to assure compliance with the applicable Engineering Specification.
This inspection is to be performed just prior to the connection closure."
Contrary to the above, on February 1, 1979, a cleanliness inspec-tion was performed and documented on pipe spool DCA-108-1-2-FW4.
Subsequent to this inspection; machining, fitting, and aligning activities took place on the open ends of the pipe spool during March 19-20,
- 1979, and the closure weld commenced on March 21, 1979.
No additional cleanliness inspection was performed.
This item is considered to be an infraction.