JAN 5
Doc!:et fto. 50-387 HEttORAtlDSi FO?:
Steven A. Varga, Chief, Ll!R Branch >4, DPH FRY!'aul F. Collins, Chief, Operator Licensing Branch, DPtt
SUBJECT:
REVIEW OF FSAR Al!ENDHEtlT '5, CO"<DUCT OF OPERATIOt!S SECTIO"lS 13.2 AllD 13.5 PLA!!T HA'1E:
Sequoyah Unit 1 DOC!:ET ttU!1DER:
50-387 LICEt!SIttG STAG=": Safety Evaluation Review ORAtlCH AHD PROJECT HAFlAGER RE(UESTI,'IG ASSISTAtlCE:
LH.', - H. Silver REVIEt! BRAllCH IF!VOLVED:
DPll:OLD REqUESTED CO'.)PLETIOFl DATE:
January 5,
1979 DESCRIPTIOH OF REVIEH:
REVIEll OF At;Et!DF!EHT 55, CONDUCT OF OPERATIOtlS, SECTIOFlS 13.2 AF!D 13.5
".'"=' EL! STATUS:
He have reviewed Ar".endment 55 to section 13.2 and 13.5 of the FSAR.
Based on our review we have determined Amendment 55, which revised the approved training program, is unacceptable for cold license eligibility pursuant to Section 55.25
( b) of 10 CFR Part 55.
Addit-ional information is necessary for us to complete our review of Amendment 55.
This information is identified 'in the enclosure.
Ae will be available to discuss these items should the applicant desire to do so.
70>
Z 6O 3~5 cc:
A/enclosure D. Skovholt ll. Haass Paul F. Collins, Chief Operator Licensing Branch Division of Project t1anagement DISTRIBUTIOl'l:
OLB R/F 'F Collins OLB Facility File JJ Buzy RJ Bursey PDR orr<cc~
cgllNANc&
OATC~
H., Silve R. Hartf eld
.0!.8 'P.H".".
JBursey:jmb
~.....OLB PF C
1/C, /79 ra
) es SIC PORbf 318 (9-76) NBCM 0240
- U C OOVkkkMCkftklk'TlkO OI rlCCt 101 ~
j4$
1 ~ t
440-OPERATOR LICENSING BRANCH 441.1
( 13.2.3.2) 441.2 (13 2
3 3) 441. 3
( 13.2.4) 441. 4
( 13.2. 6.2) 441.5 (13.2'.6.4)
The approved two week Reactor Operation Training-Oak Ridge National Laboratory was changed by Amend-ment 55 to a single day.
This change is unacceptable.
The approved Observation Training at an Operating PWR Plant was changed to read "Observation Training at an Operating Nuclear Plant."
This is unacceptable unless the facility is a
PWR.
Amendment 55 describes the Hot License Program util-izing the TVA Nuclear Student Generation Plant Operating Training Program.
Additional information is required to further evaluate this previously unapproved program pursuant to hot license eligibility.
Information should describe the training and length of courses involving lecture series, on-the-job train-ing, reactivity changes and simulator training, if any.
Specify the reactivity control manipulations that will be performed by licensed personnel as part of the re-training program.
NRC must approve the control manipulations pursuant to 10 CFR Part 55, Appendix A.
A statement should be included in the program which indicates that individuals who prepare and grade the annual retraining examination are exempt from taking the examination.
A maximum of three licensed personnel may be exempt.