|
---|
Category:Letter
MONTHYEARIR 05000482/20244202024-10-31031 October 2024 Security Baseline Inspection Report 05000482/2024420 ML24296B1902024-10-22022 October 2024 10 CFR 50.55a Requests for the Fifth Ten-Year Interval Inservice Testing Program 05000482/LER-2024-001-01, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-10-22022 October 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing 05000482/LER-2024-002, Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve2024-10-21021 October 2024 Technical Specification Required Shutdown Due to Inoperable Auxiliary Feedwater Discharge Valve ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24283A0752024-10-0909 October 2024 Notification of Commercial Grade Dedication Inspection (05000482/2025012) and Request for Information ML24199A1712024-09-17017 September 2024 Issuance of Amendment No. 241 Revise Ventilation Filter Testing Program Criteria and Administrative Correction of Absorber in Technical Specification 5.5.11 ML24260A0712024-09-12012 September 2024 License Amendment Request for a Risk-Informed Resolution to GSI-191 IR 05000482/20240102024-09-10010 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000482/2024010 (Public) ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24248A0762024-09-0404 September 2024 Containment Inservice Inspection Program Third Interval, Second Period, Refueling Outage 26 Owner’S Activity Report ML24248A2492024-09-0404 September 2024 Inservice Inspection Program Fourth Interval, Third Period, Refueling Outage 26 Owner’S Activity Report ML24241A2212024-08-29029 August 2024 Notice of Enforcement Discretion for Wolf Creek Generating Station ML24240A2642024-08-27027 August 2024 Corporation - Request for Notice of Enforcement Discretion Regarding Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5562024-08-14014 August 2024 Application to Revise Technical Specifications to Adopt TSTF-569-A, Revision 2, Revision of Response Time Testing Definitions ML24213A3352024-07-31031 July 2024 License Amendment Request to Revise Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq(Z)) (Fq Methodology), to Implement the Methodology from WCAP-17661-P-A, Revision 1. ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) IR 05000482/20240022024-07-18018 July 2024 Integrated Inspection Report 05000482/2024002 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing2024-07-0202 July 2024 Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing IR 05000482/20244012024-07-0202 July 2024 Security Baseline Inspection Report 05000482/2024401 ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24162A1632024-06-11011 June 2024 Operating Corporation – Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000482/2024010) ML24150A0562024-05-29029 May 2024 Foreign Ownership, Control or Influence (FOCI) Information – Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML23345A1602024-05-0909 May 2024 Revision of Safety Evaluation for Amendment No. 237 Request for Deviation from Fire Protection Requirements ML24089A2622024-04-29029 April 2024 Financial Protection Levels ML24118A0022024-04-27027 April 2024 Wolf Generating Nuclear Station - 2023 Annual Radiological Environmental Operating Report ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24113A1882024-04-19019 April 2024 Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment ML24109A1842024-04-18018 April 2024 Cycle 27 Core Operating Limits Report ML24109A1212024-04-18018 April 2024 (WCGS) Form 5 Exposure Report for Calendar Year 2023 IR 05000482/20240012024-04-17017 April 2024 Integrated Inspection Report 05000482/2024001 ML24114A1442024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37 ML24106A1482024-04-15015 April 2024 Notification of Inspection (NRC Inspection Report 05000482/2024003) and Request for Information ML24098A0052024-04-0707 April 2024 2023 Annual Environmental Operating Report ML24089A0972024-03-29029 March 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24089A1352024-03-29029 March 2024 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes ML24074A3312024-03-14014 March 2024 Missed Quarterly Inspection Per 40 CFR 266 Subpart N IR 05000482/20240122024-03-11011 March 2024 Fire Protection Team Inspection Report 05000482/2024012 ML24080A3452024-03-11011 March 2024 7 of the Wolf Creek Generating Station Updated Safety Analysis Report ML24016A0702024-03-0808 March 2024 Issuance of Amendment No. 240 Removal of the Power Range Neutron Flux Rate - High Negative Rate Trip Function from Technical Specifications ML24068A1992024-03-0707 March 2024 Changes to Technical Specification Bases - Revisions 93 and 94 ML24066A0672024-03-0505 March 2024 4-2022-024 Letter - OI Closure to Licensee ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners IR 05000482/20230062024-02-28028 February 2024 Annual Assessment Letter for Wolf Creek Generating Station Report 05000482/2023006 ML24059A1702024-02-28028 February 2024 Annual Fitness for Duty Program Performance Report, and Annual Fatigue Report for 2023 ML24026A0212024-02-27027 February 2024 Issuance of Amendment No. 239 Modified Implementation Date of License Amendment No. 238 ML24050A0012024-02-19019 February 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) 2024-09-06
[Table view] |
Text
May 3, 2017 NOTE: The Enclosure to this letter contains "SAFEGUARDS INFORMATION" and must be protected as required. When separated from the Enclosl!re, this letter is "Decontrolled."
SAFEGUARDS INFORMATION.
Cynthia R. Hafenstine Nuclear and Regulatory Affairs RA 17-0062 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk
Subject:
Docket No. 50-482: Revision 11 to the Wolf Creek Generating Station Security Plan, Training and
Pursuant to 10 CFR 50.54(p)(2) and fo CFR 50.4, the Enclosure to this letter provides Revision 11 of the Wolf Creek Generating Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan: The Enclosure to this letter contains Safeguards Information and must be protected as required. In accordance with 10 CFR 73.21, information contained in the Enclosure should be withheld from public disclosure. When separated from the Enclosure, this letter is "Decontrolled." The Attachment provides reasons and justifications for changes incorporated by this revision. , *
.This let.ter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204.
Sincerely,
- Cynthia R Hafenstine CRH/rlt Soo I
.---------------,--------, *t-l ~
NOTE: The Enclosure to this letter contains "SAFEGUARDS INFORMATION" and must be protected as required. When separated from the Enclosure, this letter is "Decontrolled."
SAFEGUARDS INFORMATION P.O. Box 411 I Burlington, KS 66S39 / Phone: (620) 364-8831 An Equal Of?portunity Employer M/F/HC/VET
RA 17-0062 Page 2 of 2 NOTE: The Enclosure to this letter contains "SAFEGUARDS INFORMATION" and must be protected as required. When separated;from the Enclosure, this letter is "Decontrolled."
SAFEGUARDS INFORMATION .
Attachment - Reasons and Justifications for Changes to the Wolf Creek Generating Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Enclosure - Wolf Creek Generating Station Security Plan, -Training and Qualification Plan, and Safeguards Contingency Plan, Revision 11 0 .
cc: J. L. Buchanan (NRC), w/a, w/e K. M. Kennedy (NRC), w/a, wo/e N. H. Taylor (NRC), w/a, w/e Senior Resident Inspector (NRC), w/a, wo/e NOTE: The Enclosure to this letter contains "SAFEGUARDS INFORMATION" and must be protected as required. When separated from the Enclosure, this letter is "Decontrolled."
SAFEGUARDS INFORMATION
Attachment to RA 17-0062 Page 1 of 2
"' NOTE: The E:nclosure to this letter contains "SAFEGUARDS INFORMATION" and must be protected as required. When separated from the Enclosure, this letter is "Decontrolled."
. SAF,EGUARDS INFORMATION .1
. Reasons and Justifications fo-r Changes to. the Wolf Creek Generating Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Change 1 Section Affected: 14.2 Change: Removal of site-specific alternative methodologies for implementing the requirements identified in 1o CFR 73.55(i) (5) (vi)
Reason for Change: Compliance with 10 CFR 50.9(a) regarding section 14.2 of the Wolf Creek Generating Station Security Plan. ,
Justification: An armed member of the security force, capable of maintaining continuous communication with an individual in each alarm station and other members of the security force, shall provide random patrols of all accessible areas containing target set equipment at the required periodicity as defined in NRC' Regulatory Guide 5. 76, Physical Protection Programs at Nuclear Power Reactors. The security system performance needed to protect, with the objective of high assurance, against the design basis threat of radiological sabotage, continu*es to meet the general performance objective and requirements of 10 CFR 73.55 .. This change, section 14.2, does not reduce the safeguards effectiveness of the Wolf Creek Generating Station Security Plan. Therefore, this change has been made in accordance. with 10 CFR 50.54(p) (2).
Change 2 Section Affected: 15.1 Change: Addition of Light Emitting Diocie (LED) fixtures Reason for Change: The High Mast lighting has been modified by the addition of LED fixtures.
Justification: The addition of LED fixtures has been evaluated. and documented by Wolf Creek Generating Station as a direct replacement equivalency for the current fixtures employed to meet the requirements identified in 10 CFR 73.55(i) (6). This change, section 15.1, does not decrease the safeguards _effectiveness .of the Wolf Creek Generating Station Security plan.
Therefore, these changes have been made in accordance with 10 CFR 50.54(p) (2).
NOTE: The Enclosure to this letter contains "SAFEGUARDS INFORMATION" and must be protected as required. When separated from the Enclosure, this letter is '~Decontrolled."
SAFEGUARDS INFORMATION
Attachment to RA 17-0062 Page 2 of 2
.. NOTE: The Enclosure to this letter contains "SAFEGUARDS INFORMATION" and must be protected as required. When separated from the Enclosure, this lett~r is "Decontrolled."
SAFEGUARDS INFORMATION Change 3
~
SectiOn Affected: Entire Security Plan (Does not include the Training and Qualification Plan or Contingency Plan)
Change: Minor administrative changes and/or corrections Reason for Change: Periodic reviews revealed instances where the Wolf Creek Generating Station Security Plan contained minor inconsistencies when comparing to the NRC appr~ved Revision 7 of NEI 03-12 "Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, [and Independent Spent Fuel Storage Installation Security Program]."
Justification: These changes are administrative and/or editorial and do not decrease the safeguards effectiveness of the Wolf Creek Generating Station Security Plan. Therefore, these changes have been inade in accordance with 10 CFR 50.54(p) (2).
NOTE: The Enclosure to this letter contains "SAFEGUARDS INFORMATION" and must be protected as required. When separated from the Enclosure, this letter is "Decontrolled."
SAFEGUARDS INFORMATION