Text

ES-301 Operating Test Quality Checklist Form ES-301-3 Facilitv: Dresden Generatinq Station Date of Examination: 2127117 Operatins Test Number: 2016-302 lnitials

1. General Criteria a b* ú
a. The operating test conforms with the previously approved outline; changes are consistent with samplinq requirements (e.q., 10 CFR 55.45, operational importance, sqtely !ç!iS! !!!qib!!!)- 6l r
b. There is no day{o-day repetition between this and other operating tests to be administered durino this examination. sl? r
c. The operating test shall not duplicate items from the appl icants' audit test(s). (see Section D.1.a.) btp  ?

d Overlap with the written examination and between different parts of the operating test is within ,,lo plt t¿la acceptable limits.

e. It appears that the operating test will differentiate between competent and less-than-competent aoolicants at the desqnated license level.

¿/' t5p  ?

2. Walk-Throush Criteria Each JPM includes the following, as applicable:

initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include: ¿_-

tt(  ?

detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the of if

b. Ensure that any changes from the previously approved systems and adminisative walk{hrough (Forms ES-301 -1 and 2) have not caused the test to deviate from any of he acceptance outf ines criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified

,llft pln tln on those forms and Form ES-201-2.

3. Simulator Griteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES- ,l^ dle ,uln 30'l-4 and a coov is attached.

Printed Name / Signature Date

a. Author w wrc i/,t1,-r
b. FacilityReviewer(.) ,/-/r-/7
c. NRC Chief Examiner (#) J e- v!-r , t /tc/n
d. NRC Supervisor \ :laJ,.ut NOTE: ' The facility signature is not applicable for NRC-developed tests.
  1. lndeoendent NRC reviewer initial items in Column "c"; chief examiner concunence requi red.