ML17103A560
ML17103A560 | |
Person / Time | |
---|---|
Site: | Monticello |
Issue date: | 04/12/2017 |
From: | Robert Orlikowski Operations Branch III |
To: | Kissinger P Northern States Power Company, Minnesota |
Orlikowski R | |
References | |
Download: ML17103A560 (2) | |
Similar Documents at Monticello | |
---|---|
Category:Letter
MONTHYEARML24025A9362024-01-31031 January 2024
[Table view]Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0055 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000263/20230042024-01-31031 January 2024 Integrated Inspection Report 05000263/2023004 ML24024A0722024-01-24024 January 2024 Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000263/20244012024-01-22022 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000263/2024401 L-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 ML23349A0572023-12-15015 December 2023 and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota IR 05000263/20234022023-12-13013 December 2023 Security Baseline Inspection Report 05000263/2023402 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 ML23319A3182023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000263/20230032023-11-13013 November 2023 Integrated Inspection Report 05000263/2023003 and 07200058/2023001 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 ML23291A1102023-10-23023 October 2023 Environmental Audit Summary and RCIs and RAIs ML23285A3062023-10-12012 October 2023 Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports ML23248A2092023-09-18018 September 2023 Proposed Alternative VR-11 to the Requirements of the ASME OM Code Associated with Periodic Verification Testing of MO-2397, Reactor Water Cleanup Inboard Isolation Valve ML23256A1682023-09-13013 September 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection IR 05000263/20230102023-09-0707 September 2023 Commercial Grade Dedication Inspection Report 05000263/2023010 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 ML23214A2412023-08-31031 August 2023 Letter: Aging Management Audit - Monticello Unit 1 - Subsequent License Renewal Application IR 05000263/20230052023-08-30030 August 2023 Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2023005) L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 ML23241A9732023-08-21021 August 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1, Subsequent License Renewal Application (Docket No. 50-263) L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 ML23222A0122023-08-10010 August 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Changes in Foreign Ownership, Control or Influence ML23215A1312023-08-0909 August 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application IR 05000263/20230022023-08-0707 August 2023 Plantintegrated Inspection Report 05000263/2023002 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 ML23198A0412023-07-28028 July 2023 LRA Availability Letter ML23206A2342023-07-25025 July 2023 Independent Spent Fuel Storage Installation, and Monticello Nuclear Generating Plant, Changes in Foreign Ownership, Control or Influence ML23201A0352023-07-24024 July 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23202A0032023-07-21021 July 2023 Independent Spent Fuel and Independent Spent Fuel Storage Installation, Monticello Nuclear Generating Plant, Submittal of Quality Assurance Topical Report (NSPM-1) L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 ML23195A1732023-07-14014 July 2023 Revision of Standard Practice Procedures Plan IR 05000263/20235012023-07-13013 July 2023 Emergency Preparedness Inspection Report 05000263/2023501 2024-01-31 Category:License-Operator MONTHYEARIR 05000263/20223012022-11-21021 November 2022
[Table view]NRC Initial License Examination Report 05000263/2022301 ML23011A2512022-11-10010 November 2022 Form 1.3-1 ML23011A3362022-11-10010 November 2022 Form 2.1-1 L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package ML23011A3392022-10-21021 October 2022 Form 5.1-1 ML22271A9162022-10-0303 October 2022 Operator Licensing Examination Approval ML23012A0092022-09-28028 September 2022 Form 2.3-2 ML23012A0122022-09-28028 September 2022 Form 2.3-4 ML23012A2062022-08-28028 August 2022 Form 3.4-1 ML23012A1922022-08-28028 August 2022 Form 2.3-1 ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package L-MT-22-023, 75-Day Exam Package2022-07-26026 July 2022 75-Day Exam Package ML21342A3762021-12-13013 December 2021 Confirmation of Initial License Examination ML21215A2172021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-MT-21-031, Preparation and Scheduling of Operator Licensing Examinations2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5762021-04-19019 April 2021 GFE Results, March 2021 ML21019A2172020-11-0303 November 2020 Initial License Exam Proposed Scenarios ML21013A5052020-11-0303 November 2020 Initial License Exam Form ES-201-2 ML21019A5742020-11-0303 November 2020 Initial License Exam Administered Written Exam Key ML21013A5452020-11-0303 November 2020 Initial License Exam Forms ES-D1 ML21020A1172020-11-0303 November 2020 Initial License Exam Forms ES-301-7 ML21013A5432020-11-0303 November 2020 Initial License Exam Forms ES-401-1 and 401-3 ML21013A5412020-11-0303 November 2020 Initial License Exam Forms ES-301-1 ML21020A1202020-11-0303 November 2020 Initial License Exam Forms ES-401-9 ML21020A1132020-11-0303 November 2020 Initial License Exam Form ES-401-4 ML21019A2202020-11-0303 November 2020 Initial License Exam Proposed Written Exam Key ML21019A1752020-11-0303 November 2020 Initial License Exam Form ES-401-6 ML21019A5732020-11-0303 November 2020 Initial License Exam Administered Scenarios ML21020A1232020-11-0303 November 2020 Initial License Exam Outline Review Comments ML21013A5072020-11-0303 November 2020 Initial License Exam Forms ES-301-5 ML21019A4262020-11-0303 November 2020 Initial License Exam Forms ES-301-6 ML21019A5722020-11-0303 November 2020 Initial License Exam Administered JPMs ML21013A5422020-11-0303 November 2020 Initial License Exam Forms ES-301-2 ML21013A5122020-11-0303 November 2020 Initial License Exam Outline Submittal Letter ML21019A2092020-11-0303 November 2020 Initial License Exam Proposed JPMs ML21019A4332020-11-0303 November 2020 Initial License Exam Proposed Exam Submittal Letter ML21019A4232020-11-0303 November 2020 Initial License Exam Forms ES-301-3 and 301-4 ML21020A1062020-11-0303 November 2020 Initial License Exam Form ES-403-1 ML21020A1002020-11-0303 November 2020 Initial License Exam Form ES-201-1 ML21020A1022020-11-0303 November 2020 Initial License Exam Security Agreement Forms L-MT-20-042, Initial License Exam Post Exam Letter2020-10-30030 October 2020 Initial License Exam Post Exam Letter ML20293A2562020-10-16016 October 2020 Operator Licensing Examination Approval L-MT-20-006, Plant'S Response to Regulatory Issue Summary 2020-012020-03-16016 March 2020 Plant'S Response to Regulatory Issue Summary 2020-01 ML19106A0172019-04-15015 April 2019 GFE Results, March 2019 ML19045A3722019-02-12012 February 2019 March 2019 GFE Cover Letter Riii ML19009A2502019-01-0808 January 2019 GFE Annual Registration Letter - 2019 Examinations, Region III IR 05000263/20183012018-12-27027 December 2018 NRC Initial License Examination Report 05000263/2018301 ML19241A4682018-12-0606 December 2018 ES-201-3 L-MT-18-022, 2018 Monticello Outline Submittal Letter2018-12-0606 December 2018 2018 Monticello Outline Submittal Letter ML19241A4702018-12-0606 December 2018 ES-403-1 2022-09-28 Category:Part 55 Examination Related Material MONTHYEARIR 05000263/20223012022-11-21021 November 2022
[Table view]NRC Initial License Examination Report 05000263/2022301 ML23011A2512022-11-10010 November 2022 Form 1.3-1 ML23011A3362022-11-10010 November 2022 Form 2.1-1 L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package ML23011A3392022-10-21021 October 2022 Form 5.1-1 ML22271A9162022-10-0303 October 2022 Operator Licensing Examination Approval ML23012A0092022-09-28028 September 2022 Form 2.3-2 ML23012A0122022-09-28028 September 2022 Form 2.3-4 ML23012A1922022-08-28028 August 2022 Form 2.3-1 ML23012A2062022-08-28028 August 2022 Form 3.4-1 ML23012A2102022-07-26026 July 2022 Letter Submitting Monticello Outline Package L-MT-22-023, 75-Day Exam Package2022-07-26026 July 2022 75-Day Exam Package ML21342A3762021-12-13013 December 2021 Confirmation of Initial License Examination ML21215A2172021-08-0303 August 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-MT-21-031, Preparation and Scheduling of Operator Licensing Examinations2021-04-20020 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21020A1232020-11-0303 November 2020 Initial License Exam Outline Review Comments ML21019A4332020-11-0303 November 2020 Initial License Exam Proposed Exam Submittal Letter ML21013A5412020-11-0303 November 2020 Initial License Exam Forms ES-301-1 ML21020A1172020-11-0303 November 2020 Initial License Exam Forms ES-301-7 ML21019A1752020-11-0303 November 2020 Initial License Exam Form ES-401-6 ML21019A5742020-11-0303 November 2020 Initial License Exam Administered Written Exam Key ML21019A2202020-11-0303 November 2020 Initial License Exam Proposed Written Exam Key ML21020A1202020-11-0303 November 2020 Initial License Exam Forms ES-401-9 ML21013A5452020-11-0303 November 2020 Initial License Exam Forms ES-D1 ML21019A2092020-11-0303 November 2020 Initial License Exam Proposed JPMs ML21019A5722020-11-0303 November 2020 Initial License Exam Administered JPMs ML21013A5122020-11-0303 November 2020 Initial License Exam Outline Submittal Letter ML21019A5732020-11-0303 November 2020 Initial License Exam Administered Scenarios ML21013A5072020-11-0303 November 2020 Initial License Exam Forms ES-301-5 ML21019A2172020-11-0303 November 2020 Initial License Exam Proposed Scenarios ML21013A5422020-11-0303 November 2020 Initial License Exam Forms ES-301-2 ML21013A5432020-11-0303 November 2020 Initial License Exam Forms ES-401-1 and 401-3 ML21020A1132020-11-0303 November 2020 Initial License Exam Form ES-401-4 ML21020A1022020-11-0303 November 2020 Initial License Exam Security Agreement Forms ML21020A1062020-11-0303 November 2020 Initial License Exam Form ES-403-1 ML21019A4232020-11-0303 November 2020 Initial License Exam Forms ES-301-3 and 301-4 ML21013A5052020-11-0303 November 2020 Initial License Exam Form ES-201-2 ML21020A1002020-11-0303 November 2020 Initial License Exam Form ES-201-1 ML21019A4262020-11-0303 November 2020 Initial License Exam Forms ES-301-6 L-MT-20-042, Initial License Exam Post Exam Letter2020-10-30030 October 2020 Initial License Exam Post Exam Letter ML20293A2562020-10-16016 October 2020 Operator Licensing Examination Approval L-MT-20-006, Plant'S Response to Regulatory Issue Summary 2020-012020-03-16016 March 2020 Plant'S Response to Regulatory Issue Summary 2020-01 IR 05000263/20183012018-12-27027 December 2018 NRC Initial License Examination Report 05000263/2018301 L-MT-18-072, Post Examination Submittal Letter2018-12-0606 December 2018 Post Examination Submittal Letter ML19246A0342018-12-0606 December 2018 ES-301-5 ML19241A4702018-12-0606 December 2018 ES-403-1 L-MT-18-022, 2018 Monticello Outline Submittal Letter2018-12-0606 December 2018 2018 Monticello Outline Submittal Letter ML19246A0312018-12-0606 December 2018 ES-201-2 ML19241A4662018-12-0606 December 2018 ES-201-1 ML19246A1102018-12-0606 December 2018 Proposed Examination Submittal Letter 2022-09-28 |
Text
ø A REGU/ UNITED STATES v- '4>
.Jo. ottt N UCLEAR REGU LATORY COM MSSION E )".4á g REGION III iws 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532'4352 April12,2017 Mr. Peter Kissinger Training Manager Monticello Nuclear Generating Plant Northern States Power Company - Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
Dear Mr,
Kissinger:
On March 8,2017, the U,S, Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees at your facility. Enclosed with this letter are copies of both forms of the examination, including answer keys, the grading results for your facility, and copies of the. individual answer sheets fór each of yóur emfltoyeeé. Please forward the results to the individuals along with the copies of their respective answer sheets. A "P" in the RESULTS cqlg1n indicates that the inciividual achieved a passing grade of 80 percent or better on the GFE, while ar "F" indicates that the individual failed the exam, lf you have any questions concerning this examination, please contact Mr. Jacob Dolecki at (301) 415-2947.
Sincerely, I
/tu//A Robert J. Orlikowski, Chief Operations Branch Division of Reactor SafetY Docket No. 50-263
Enclosures:
- 1. Examination Forms "A" and "8" with answers
- 2. Examination Results SummarY for Monticello Nuclear Generating Plant
- 3. lndividual Answer Sheets
- 4. Post-Examination Comments
P, Kissinger LETTER TO MR. PETER KISSINGER FROM MR. ROBERT J. ORLIKOWSKI DATED APRTL/l1,2017 DOCUMENT NAME:
P:\Client ServerApplications OL Downloads\GFE test results\Monticello GFE Results March 2017.docx OFFICE Rlll/DRS/OB:OLA RIII/DRS/OB:BC NAME CSchmidt cs ROrlikowski \
DATE 04t05t17 O4l t¿ 117 OFFIGIAL RECORD COPY