ML17102A619

From kanterella
Jump to navigation Jump to search
Reactor Operator Written Retake License Examination
ML17102A619
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/12/2017
From: Diane Jackson
NRC Region 1
To: Rausch T
Susquehanna
Bixler C
Shared Package
ML17068A107 List:
References
Download: ML17102A619 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713 April 12, 2017 Mr. Timothy S. Rausch President and Chief Nuclear Officer Susquehanna Nuclear, LLC 769 Salem Blvd - NUCSB3 Berwick, PA 18603-0467

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 REACTOR OPERATOR WRITTEN RETAKE LICENSE EXAMINATION

Dear Mr. Rausch:

In a telephone conversation on March 8, 2017, between Mr. Brian Fuller, Chief Examiner and Mr. Bill Gilbert, Operations Training Manager, arrangements were made for the administration of a written retake licensing examination at Susquehanna Steam Electric Station, Units 1 and 2 on May 10, 2017.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."

To meet the above schedule, it will be necessary for your staff to furnish the examination outline by March 31, 2017. The written examination and the supporting reference materials identified in to ES-201 will be due by April 10, 2017. Pursuant to Title 10, Section 10 CFR 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations before it is submitted to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examination, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examination is being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.

If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the examination date.

T. Rausch 2 After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Website at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Gilbert has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Brian Fuller at (610) 337-5077, or me at (610) 337-5306.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-387 and 50-388 License No. NPF-14 and NPF-22 cc: Distribution via ListServ

T. Rausch 3

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 REACTOR OPERATOR WRITTEN RETAKE LICENSE EXAMINATION, DATED APRIL 12, 2017 Distribution:

DDorman, RA ATurilin, DRP RidsNrrPMSusquehanna DLew, DRA L.Micewski, SRI Resource MScott, DRP TDaun, DRP, RI RidsNrrDorlLpl1-2 DPelton, DRP DJackson, DRS Resource RLorson, DRS BFuller, DRS ROPreports Resource JYerokun, DRS CBixler, DRS DSchroeder, DRP AGould, DRP, AA SBarber, DRP JBowen, RI, OEDO DOCUMENT NAME: G:\DRS\Operations Branch\FULLER\Exam 17 Susq retake\Susquehanna Retake 2017 ltr.doc ADAMS PKG: ML17068A107 ADAMS ACCESSION NO.: ML17102A619 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME BFuller/BF DEJackson/DEJ DATE 04/11/17 04/12/17 OFFICIAL RECORD COPY