ML17096A651
ML17096A651 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 04/06/2017 |
From: | Stoedert K Division Reactor Projects III |
To: | Division Reactor Projects III |
References | |
Download: ML17096A651 (3) | |
Similar Documents at Clinton | |
---|---|
Category:Letter
MONTHYEARIR 05000461/20240032024-11-0505 November 2024
[Table view]Integrated Inspection Report 05000461/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums ML24285A1462024-10-24024 October 2024 Ltr. to Gena Kakkak, Chairwoman, Menominee Indian Tribe of Wisconsin Re CPS Section 106 Consultation ML24285A1482024-10-24024 October 2024 Ltr. to Joseph Rupnick, Chairman, Prairie Band Potawatomi Nation Re CPS Section 106 Consultation ML24285A1472024-10-24024 October 2024 Ltr. to Geoffrey M. Standing Bear, Principal Chief, Osage Nation Re CPS Section 106 Consultation ML24285A1422024-10-24024 October 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1442024-10-24024 October 2024 Ltr. to Estavio Elizondo, Sr., Chairman, Kickapoo Traditional Tribe of Texas Re CPS Section 106 Consultation IR 05000461/20244032024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024403 IR 05000461/20244022024-10-24024 October 2024 – Security Baseline Inspection Report 05000461/2024402 ML24285A1452024-10-24024 October 2024 Ltr. to Gail Cheatham, Kickapoo Tribe of Indians of the Kickapoo Reservation in Ks Re CPS Sect 106 Consult ML24283A1642024-10-23023 October 2024 Summary of the 2024 Environmental Audit Related to the Review of the License Renewal Application Environmental Report (EPID Number L-2024-LNE-0000)(Docket Number:50-461) ML24285A1412024-10-21021 October 2024 Ltr. to Craig Harper, Chief, Peoria Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1432024-10-21021 October 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma Re CPS Section 106 Consultation RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24215A2932024-09-27027 September 2024 Scoping Summary Letter 05000461/LER-2023-002-01, Reactor Core Isolation Cooling Inoperable Prior to Mode Change2024-09-24024 September 2024 Reactor Core Isolation Cooling Inoperable Prior to Mode Change ML24211A2302024-09-11011 September 2024 – Request for Partial Site Release for Facility Operating License No. NPF-62 IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) ML24222A3952024-08-23023 August 2024 Regulatory Audit Report to Support the Review of the Amendments to Revise Reactor Water Cleanup Valve Isolation Timing ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 ML24220A2772024-08-0707 August 2024 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000461/2025010 ML24212A2212024-08-0202 August 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-LNE-0000) (Docket Number: 50-461) ML24157A3242024-07-11011 July 2024 Issuance of Amendment No. 254 Revision of Reactor Water Cleanup Isolation Valve Timing ML24158A0772024-07-0303 July 2024 Notice of Consideration of Approval of Partial Site Release, Public Meeting, and Request for Comments (EPID L-2023-LLA-0088) - Letter ML24163A3242024-06-28028 June 2024 LRA - Portal Letter ML24163A3252024-06-28028 June 2024 Aging Management Regulatory Audit Plan ML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24290A0942024-05-21021 May 2024 Letter from Rachael Mangum (Achp) to Stephen Koenick (NRC) License Renewal Application for the Clinton Power Station Unit 1 Dewitt County, Il, Achp Project Number: 020924 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20240012024-05-0707 May 2024 Integrated Inspection Report 05000461/2024001 ML24103A1032024-05-0101 May 2024 SHPO Consultation Letter for Clinton License Renewal ML24103A1152024-04-30030 April 2024 Ltr. to Geoffrey Standing Bear, Principal Chief, the Osage Nation; Re., CPS Section 106 Consultation ML24120A3442024-04-30030 April 2024 Ltr. to Gena Kakkak, Chairman, Menominee Indian Tribe of Wisconsin; Re., CPS Section 106 Consultation ML24120A3452024-04-30030 April 2024 Ltr. to Lester Randell, Chairman, Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas; Re., CPS Section 106 Consultation ML24120A3432024-04-30030 April 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma; Re., CPS Section 106 Consultation ML24103A0992024-04-30030 April 2024 Achp Scoping Letter for Clinton License Renewal ML24120A3462024-04-30030 April 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma; Re., CPS Section 106 Consultation RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24107B0312024-04-29029 April 2024 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition 2024-09-09 Category:Meeting Summary MONTHYEARML24214A1402024-08-0505 August 2024
[Table view]July 24, 2024, Summary of the Public Meeting Regarding Clinton Power Station, Unit 1, Partial Site Release ML24183A1642024-07-0202 July 2024 June 27, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 ML24135A3722024-05-22022 May 2024 Enclosure 1 - Meeting Summary for May 7 and May 9 2024 Public Scoping Meetings ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24032A0862024-02-0202 February 2024 Summary of Meeting with Constellation Energy Generation, LLC, on Planned Requests to Use Code Case N-932 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23198A0152023-07-27027 July 2023 License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23200A2592023-07-24024 July 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting-Meeting Summary ML23173A0142023-06-22022 June 2023 Summary of the June 14, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML22140A2912022-05-23023 May 2022 Summary of Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Clinton, Unit 1, and Lasalle, Units 1 and 2 ML22032A3112022-02-18018 February 2022 January 31, 2022, Summary of Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC, Extending the Clinton Power Station, Unit 1, Secondary Containment to Include the Fuel Building Railroad Ai ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21195A3932021-07-14014 July 2021 June 30, 2021, Summary of Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1, and Lasalle County Station, Units 1 & 2 ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure ML21139A1852021-06-22022 June 2021 Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting ML21028A1472021-01-28028 January 2021 Summary of January 21, 2021, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Exelon Generation Company, LLC Regarding One-Time Extension of the Clinton Power Station, Unit 1, Containment Type a ILRT Frequency EPID L- ML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 ML20351A2832020-12-18018 December 2020 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20342A3522020-12-10010 December 2020 Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) ML20323A0332020-12-0101 December 2020 Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20239A8252020-08-25025 August 2020 Summary of the August 4, 2020 Public Webinar to Discuss the NRC 2019 End-Of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 ML20181A0002020-06-29029 June 2020 Summary of 6/24/20 Meeting with Exelon Generation Company, LLC Regarding Planned Request for Alternative to Supplemental Valve Position Indication Testing Requirements for Braidwood, Calvert Cliffs, Clinton, Limerick, Nine Mile, Peach Botto ML19326A3152019-12-0303 December 2019 Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements ML19326C3582019-12-0303 December 2019 Summary of November 20, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Revise the Quality Assurance Program ML19162A0272019-06-21021 June 2019 Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief Valves ML19036A8832019-02-0707 February 2019 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use ASME Code Case N-879 ML18354B1712019-01-0202 January 2019 Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines IR 05000461/20180512018-12-19019 December 2018 Summary of November 30, 2018, Meeting with Exelon Generation Company, LLC Regarding the Preliminary Safety Significance Determination in NRC Inspection Report 05000461/2018051 Dated November 6, 2018 ML18325A1712018-11-28028 November 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation Areas ML18297A1722018-10-26026 October 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned License Amendment Request to Adopt TSTF-427 ML18120A1772018-05-0101 May 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Draft Guidance for Emergency Response Organization Staffing ML18099A2562018-04-0909 April 2018 March 28, 2018, Summary of the Public Outreach/Open House to Discuss the NRC 2017 End-of-Cycle Plant Performance Assessment of Clinton Power Station ML18065A8362018-03-0707 March 2018 Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report ML18058A5232018-03-0101 March 2018 Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing Requirements ML17347B1022017-12-14014 December 2017 Summary of Meeting with Exelon Generation Company, LLC on Its Planned Fleet License Amendment Request to Revise the Minimum Staffing Requirements for Emergency Response ML17184A0092017-07-10010 July 2017 Summary of June 29, 2017, Meeting with Exelon Generation Company, LLC, on Proposed Changes to Emergency Plans to Revise Emergency Action Levels (CAC Nos. MF9779-MF9801) ML17096A6512017-04-0606 April 2017 Summary of Public Outreach/Open House to Discuss the NRC 2016 End-Of-Cycle Plant Performance Assessment of Clinton Power Station ML17067A3722017-03-16016 March 2017 March 7, 2017, Summary of Public Pre-Submittal Teleconference Meeting with Exelon Generation Company, LLC to Discuss Proposed License Amendment Request Regarding Residual Heat Removal System Operability in Mode 3 at Clinton Power Station, U ML16307A3162016-11-28028 November 2016 Summary of Public Meeting with Exelon to Discuss Pre-Submittal License Amendment Requests And/Or Exemptions to Part 37 for Decommissioning Plans for Clinton, Quad Cities, and Oyster Creek ML16195A4482016-07-22022 July 2016 Summary of July 12, 2016, Public Meeting with Exelon to Discuss Decommissioning Transition Plans for Clinton, Quad Cities, and Oyster Creek ML16085A3292016-04-0606 April 2016 Summary of March 22, 2016, Meeting with Exelon Generation Company, LLC, on Proposed License Amendment Request to Adopt ANSI 3.1-2014 Operating Training Standards ML16095A3072016-04-0101 April 2016 Summary of the March 30, 2016, Public Outreach/Open House to Discuss the NRC 2015 End-Of-cycle Plant Performance Assessment of Clinton Power Station ML16040A2182016-02-11011 February 2016 January 21, 2016, Summary of Meeting with Exelon Generation Company, LLC Licensing Managers ML16035A1762016-02-11011 February 2016 Summary of January 7, 2016, Meeting with Exelon Generation Company, LLC on It'S Planned Fleet License Amendment Request to Revise the Minimum Staffing Requirements for Emergency Response (CAC Nos. MF7162 - MF7183) ML16032A4112016-02-0404 February 2016 Summary of December 9, 2015 Meeting with Exelon Generation Company, LLC to Discuss Proposed Submittal Related to Secondary Containment Airlock Extension ML15072A4242015-04-16016 April 2015 February 23, 2015, Summary of Meeting with Exelon Generation Company, LLC Regarding Relief Request for Clinton Power Station, Unit 1 (TAC Nos. MF5334, MF5344, and MF5345 2024-08-05 |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 April 6, 2017 LICENSEE: Exelon Generation Company, LLC FACILITY: Clinton Power Station
SUBJECT:
SUMMARY
OF THE MARCH 29, 2017, PUBLIC OUTREACH/OPEN HOUSE TO DISCUSS THE NRC 2016 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF CLINTON POWER STATION On March 29, 2017, from 4:00 p.m. to 7:00 p.m. (CDT), a public outreach/open house was held by representatives of the U.S. Nuclear Regulatory Commission (NRC) to provide the public with information on the 2016 End-of-Cycle plant performance assessment of the Clinton Power Station and with general information on the NRC. The outreach was held as part of the annual Business Expo conducted by the Clinton Area Chamber of Commerce. The Expo was held at the Clinton High School and involved representatives of approximately 50 local businesses and government agencies staffing booths in the schools gymnasium. Members of the public visited the various booths as dictated by their interests.
Representatives at the NRC booth made copies of the 2016 End-of-Cycle plant performance assessment of Clinton Power Station and other information brochures and fact sheets available to the public in attendance. The NRC representatives also discussed the Clinton Power Station or the NRC, in general, with over 30 members of the public. No feedback form was received during this open house.
/RA/___________________
Karla Stoedter, Branch Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62
Enclosure:
List of Meeting Attendees cc: Distribution via LISTSERV
CLINTON 2016 PERFORMANCE ASSESSMENT MEETING March 29, 2017 MEETING ATTENDANCE LIST NRC Attendees William Schaup, Senior Resident Inspector, Clinton Power Station Elba Sanchez-Santiago, Resident Inspector, Clinton Power Station Viktoria Mytling, Senior Public Affairs Officer, Region III Office Enclosure
SUBJECT:
SUMMARY
OF THE MARCH 29, 2017, PUBLIC OUTREACH/OPEN HOUSE TO DISCUSS THE NRC 2016 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT OF CLINTON POWER STATION DISTRIBUTION:
Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRSIII DRPIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML17096A651 OFFICE RIII N RIII N NAME RNg:bw KStoedter DATE 04/05/2017 04/06/2017 OFFICIAL RECORD COPY