Email - Ray Lorson to Eric Benner Retracting Question #2 from TIA Request Regarding Ginna Nuclear Power Plant Electrical Scheme
ML17090A506
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/2017
From: Ray Lorson
Division of Reactor Safety I
To: Frank Arner, Eric Benner, Doug Broaddus, Glenn Dentel, Dion J, Vijay Goel, Mel Gray, Roy Mathew, Pickett D, Scott Wall, Jacob Zimmerman
Office of Nuclear Reactor Regulation, Division of Reactor Safety I
Johnston J, NRR/DORL/LSPB, 415-1349
References
Download: ML17090A506 (3)


Text

Johnston (Dion), Jeanne From: Lorson, Raymond Sent: Friday, March 31, 2017 3:26 PM To: Johnston (Dion), Jeanne; Dentel, Glenn; Zimmerman, Jacob; Mathew, Roy; Goel, Vijay; Wall, Scott; Pickett, Douglas; Broaddus, Doug; Gray, Mel; Arner, Frank; Benner, Eric Cc: Patel, Jigar; Harris, Brian; Yerokun, Jimi

Subject:

RE: Ginna Call with Region 1 Follow Up Flag: Follow up Flag Status: Flagged Eric:

I appreciate all of the hard work to resolve this long-standing open TIA and am glad to hear that we are making progress and have only a few more questions to answer to finalize the agencys position related to the off-site power system at Ginna. I was asked to provide an update to clarify the regional need related to each of the three questions contained in the original TIA. Our request at this time related to each issue is:

Question 1. Does the Ginna current licensing basis (CLB) for the offsite power system allow credit for the plant main generator voltage support to demonstrate capacity and capability of the offsite power system to permit the functioning of the required engineered safety features (ESF)? - We still need this question from the original TIA answered to allow Region I to close out a currently open URI. We have to report back whether the historical conditions was (or was not) consistent with the licensing basis at Ginna.

Question 2: Does the answer to this question constitute a change in NRC staff position previously approved in licensing actions, whereby a backfit evaluation needs to be performed? - Region I no longer requires that this question be answered as part of the TIA. Since opening the URI (and drafting the TIA),

the licensee has performed a detailed engineering calculation and made operational changes such that the plant no longer requires support from the main generator to ensure reliability of the off-site power system.

As a result, any final agency position related to the adequacy of Ginnas prior approach would only allow us to provide the appropriate close-out of the URI and would not drive or result in any additional licensee actions at this point.

And for completeness; Question 3 from the TIA related to the degraded voltage relays has already been closed out.

Please let me know if you need anything else and once again, thanks to all for seeing this lengthy process to closure.

Ray From: Johnston (Dion), Jeanne Sent: Thursday, March 30, 2017 2:32 PM To: Dentel, Glenn <Glenn.Dentel@nrc.gov>; Zimmerman, Jacob <Jacob.Zimmerman@nrc.gov>; Mathew, Roy

<Roy.Mathew@nrc.gov>; Goel, Vijay <Vijay.Goel@nrc.gov>; Wall, Scott <Scott.Wall@nrc.gov>; Pickett, Douglas

<Douglas.Pickett@nrc.gov>; Broaddus, Doug <Doug.Broaddus@nrc.gov>; Gray, Mel <Mel.Gray@nrc.gov>; Arner, Frank

<Frank.Arner@nrc.gov>

Cc: Patel, Jigar <Jigar.Patel1@nrc.gov>; Harris, Brian <Brian.Harris@nrc.gov>; Lorson, Raymond 1

<Raymond.Lorson@nrc.gov>; Yerokun, Jimi <Jimi.Yerokun@nrc.gov>; Benner, Eric <Eric.Benner@nrc.gov>

Subject:

RE: Ginna Call with Region 1

Glenn, Thank you for the quick response. As we agreed, we will work with EEEB staff and your staff as needed to address OGC comments.

To document withdrawal of the backfit question we need correspondence from Ray Lorson to Eric Benner. If sent by email, we can add it to ADAMS for the record.

Best, Jeanne Johnston TIA Project Manager NRR/DORL Special Projects Branch 301-415-1349 From: Dentel, Glenn Sent: Thursday, March 30, 2017 1:57 PM To: Johnston (Dion), Jeanne <jeanne.johnston@nrc.gov>; Zimmerman, Jacob <Jacob.Zimmerman@nrc.gov>; Mathew, Roy <Roy.Mathew@nrc.gov>; Goel, Vijay <Vijay.Goel@nrc.gov>; Wall, Scott <Scott.Wall@nrc.gov>; Pickett, Douglas

<Douglas.Pickett@nrc.gov>; Broaddus, Doug <Doug.Broaddus@nrc.gov>; Gray, Mel <Mel.Gray@nrc.gov>; Arner, Frank

<Frank.Arner@nrc.gov>

Cc: Patel, Jigar <Jigar.Patel1@nrc.gov>; Harris, Brian <Brian.Harris@nrc.gov>; Lorson, Raymond

<Raymond.Lorson@nrc.gov>; Yerokun, Jimi <Jimi.Yerokun@nrc.gov>

Subject:

RE: Ginna Call with Region 1 We discussed with Ray Lorson regarding the TIA. Region I would like to keep the TIA request; however, we would withdraw the backfit question to expedite the process.

Glenn Dentel Branch Chief responsible for oversight of Fire Protection, Cyber Security, Program, and Electrical Inspections 610-337-5233 (w)

From: Johnston (Dion), Jeanne Sent: Thursday, March 30, 2017 10:46 AM To: Zimmerman, Jacob <Jacob.Zimmerman@nrc.gov>; Mathew, Roy <Roy.Mathew@nrc.gov>; Goel, Vijay

<Vijay.Goel@nrc.gov>; Wall, Scott <Scott.Wall@nrc.gov>; Pickett, Douglas <Douglas.Pickett@nrc.gov>; Broaddus, Doug

<Doug.Broaddus@nrc.gov>; Gray, Mel <Mel.Gray@nrc.gov>; Dentel, Glenn <Glenn.Dentel@nrc.gov>; Arner, Frank

<Frank.Arner@nrc.gov>

Cc: Patel, Jigar <Jigar.Patel1@nrc.gov>; Harris, Brian <Brian.Harris@nrc.gov>

Subject:

RE: Ginna Call with Region 1

<< File: TIA 201308 Ginna_OGC Edits and Comments.docx >>

Thank you all for the discussion this morning. Attached are the OGC edits.

2

Region 1 took the action to discuss with their management the need for the TIA response considering licensee actions to address the issue. If the decision is made to keep the TIA request, R1 will follow up with me. Also please consider withdrawing the backfit question (question #2) assuming that the response to question 1 will be adequate to close the URI.

Thanks, Jeanne D. Johnston Project Manager NRR/DORL/LSPB 3014151349 Original Appointment From: Johnston (Dion), Jeanne Sent: Monday, March 27, 2017 4:54 PM To: Johnston (Dion), Jeanne; Zimmerman, Jacob; Mathew, Roy; Goel, Vijay; Wall, Scott; Pickett, Douglas; Broaddus, Doug; Gray, Mel; Dentel, Glenn; Arner, Frank; Harris, Brian Cc: 'Jigar Patel'

Subject:

Ginna Call with Region 1 When: Thursday, March 30, 2017 9:00 AM10:00 AM (UTC05:00) Eastern Time (US & Canada).

Where: HQOWFN10B0612p

Purpose:

Discuss the Regions need for the Ginna TIA response and discuss outcomes of recent electrical inspections Outcome: Understand the safety significance of the issue, desired outcome and decide on next steps within the TIA process Process: Telecon with the following participants R1 BCs NRR/DE/EEEB BC and staff NRR/DORL BC TIA PM (and back up PM, Scott Wall)

Ginna PM

Background:

The response is available This version is a streamlined response which was recently concurred on by DE/EEEB and R1. Several questions were posed during OGC review of the TIA response and NRR would like clarity form the Region before deciding how to best move forward.

The region is seeking answers to 2 questions to close an URI:

1. Does the Ginna current licensing basis (CLB) for the offsite power system allow credit for the plant main generator voltage support to demonstrate capacity and capability of the offsite power system to permit the functioning of the required engineered safety features (ESF)?
2. Does the answer to this question constitute a change in NRC staff position previously approved in licensing actions, whereby a backfit evaluation needs to be performed?

3