ML17083B934
| ML17083B934 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/28/1987 |
| From: | Wenslawski F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML17083B931 | List: |
| References | |
| 50-275-87-30, 50-323-87-30, NUDOCS 8709110343 | |
| Download: ML17083B934 (4) | |
Text
APPENDIX A NOTICE OF VIOLATION Pacific Gas and Electric Company Diablo Canyon Power Plant Docket Nos.
50-275 8 50-323 License Nos.
DPR-80 8
DPR-82 During an NRC inspection conducted on July 27-31,
- 1987, a violation of NRC requirements was identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C
(1987), the violation is listed below:
A.
Technical Specification 6.8. 1 states, in part, "Written Procedures shall be established, implemented and maintained covering the activities referenced below:
a.
The applicable proce'dures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978...."
Appendix A, Section 1, Administrative Procedures, Items d.
and e., specifically identify, in part, Procedure Adherence and Procedure Review and Approval."
Nuclear Plant Administrative Procedure, NPAP E-4, Procedures, Section
- 4. 10, Tem orar Instructions, Item 4. 10. 1. C.,
- states, in part, "Temporary instructions shall not be used in lieu of an, approved procedure...."
Item 4. 10.3.C.
- states, in part, "Temporary instructions shall be promptly destroyed or otherwise identified as being obsolete...,
when they are no longer in force."
1.
Contrary to the above, on July 28, 1987, the Radiation Protection Department was using a Temporary Instruction, dated July 15, 1987, that implemented a proposed revision of Procedure, RCP D-600, Personnel Decontamination and Evaluation.
This Temporary Instruction was placed in effect pending approval of revised RCP D-600 by the Plant Staff Review Committee.
2.
Contrary to the above, during the period of July 15-28, 1987, the Radiation Protection Department had not destroyed or identified as being obsolete a Temporary Instruction, Technician Res onse to Frisker Alarms, that had been superseded by a Temporary Instruction that implemented a proposed revision of Procedure, RCP D-600.
The two Temporary Instructions specified conflicting requirements.
This is a Severity Level V Violation (Supplement I).
Pursuant to the provisions of 10 CFR 2. 201, Pacific Gas and Electric Company is hereby required to submit a written statement or explanation to the U.
S.
Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555 with a copy to the Regional Administrator.,
Region V, and a copy to the NRC Resident Inspector, within 30 days of the date of the letter transmitting this Notice.
This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation:
(1) the reason for the violation if admitted, (2) the corrective steps that have been taken and the results
- achieved, (3) the corrective steps that will be taken to avoid
'urther violations, and (4) the date when full compliance will be achieved.
8709i10303 870828 PDR ADOCK 0500027S Q
.PDR
If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.
Consideration may be given to extending the response time for good cause shown.
Dated at Walnut Creek, California this 28th day of August 1987 FOR THE NUCLEAR REGULATO Y COMMISSION F.
A.
Wens1 awski, Chief Emergency Preparedness and Radiological Protection Branch