APPENDIX A NOTICE OF VIOLATION Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106 Docket No. 50-275 License No. DPR-80 As a result of the inspection conducted during the period of March 2
through'pril 12,
- 1986, and in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C), the following violation was identified:
A.
Technical Specification 6.8.1.a required that written procedures "recommended in Appendix A of Regulatory Guide 1.33, Revision 2" shall be established and implemented.
Appendix A of Regulatory Guide 1.33 specifically identified "Access Control to Radiation Areas Including a Radiation Work Permit System" as a radiation protection procedure typical of Pressurized Water Reactors.
Radiation Control Procedure (RCP) G-5, "Control of Access for Radiation Protection Purposes,"
and G-100 "Radiation Work Permits," established these Appendix A written procedure requirements for the plant.
Section 2.a (1) of RCP G-100 stated that personnel performing work "are responsible to ascertain, prior to entry, that their work in a Controlled Area is covered by either a valid RWP or SWP;" additionally, section 3.a of RCP G-5 stated, "Allwork in controlled areas will be in accordance with an RWP or SWP."
Contrary to the above instructions, on March 20,
- 1986, a maintenance mechanic entered a controlled area without a valid RWP or Special Work Permit (SWP).
For further description of this incident see section 4.a of the report.
This is a Severity Level V Violation (Supplement I, IV).
Pursuant to the provisions of 10 CFR 2.201, Pacific Gas and Electric Company is hereby required to submit to this office within thirty days of the date of this Notice, a written statement of explanation in reply including:
(1) the corrective steps which have been taken and the results achieved; (2) the corrective steps which will be taken to avoid further items of noncompliance; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
QY 1 ]gag Dated M. M. Mendonca, Chief Reactor Projects Section 1
8605160158 860501 PDR ADaCZ 05000275
(
G PDR
C I
I
~
PI I
I" I, ~ ~1)
,I i
I I PP IIPQ i I'I) 4 C
IPT>>)
)I)
I" "ytl PI
~
'~'I I'>>
I")
4 II
, )
. 4>> 'f I'
'I I
')Ir ';,, tyy 1
I f, vl I I'pI'1)
' 1i
(
)P 1
)()
l
~ 1I I
1
I',,
I I l )
Ch
~ I TI',
I
~ I pT y
y 1
Pli I
gl P,IP I
- 4) y,,l '
P)I I f,
I T
)yr>> )
P I
p (I,",
'I 141 j>>
I I P
E 'I
>>l/, ry I,
' I, P
4 1
m I
yf P
I
,I Ji
'1 I
1 I
4 4
EI ~ hv C!
f );f 'I
~ lt lf)',
l,h, T,fp: )-;
I P
J I
TPP.! J I(
~
I" /
)'4 'v I 4)1,
P,
~ I
~ I
'f I),"
hp v
I ~ I
~)
4
'1 I CPI' rh>>f
~I 'Ivy 1 "IT, ) I()'pp I)I E ~ o y,l
)
I ~')
pp '<<").
,pp
~ 4 4
I f I ~
q(yt I 'P'g" I'P'I 1
111