Text

APPENDIX A NOTICE OF VIOLATION Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106 Docket No. 50-323 Construction Permit No.

CPPR-69 As a result of the inspections conducted during December 1984/January

1985, and in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C),

the following violation was identified:

10 CFR 50, Appendix B, Criterion V, as implemented by Section 17.1.5 of the FSAR and the PGRE equality Assurance Manual Section V states in part that, "Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings...and shall be accomplished in accordance with these instructions, procedures, or drawings..."

1.

Howard P. Foley, (}uality Control procedure, gCPE-9 for "Installation of electrical

raceways, junction and terminal boxes",

states as follows:

Paragraph 3.1, "The Project Manager has the responsibility for employing all measures necessary to accomplish the work in accordance with the requirements of the contract documents and this procedure."

Contrary to the above, during inspections of Electrical Raceway Supports in December 1984/January 1985, the following conditions was identified:

a)

Su ort 2F-117-3-90 M.C.

28 The support drawing MC-28 called for the installation of a P.1001/C-41 unistrut with two clamps.

However, a P-1001 with one clamp had been installed.

b)

Su ort 1178-H-100-4-63 The installation drawing required that a washer be installed under the bolt which attached a S-6 brace to the unistrut support.

No washer was installed.

c)

Su ort 2A-119-6-20 A six inch weld on six inch long angle iron added to stiffen the support was undersized for 25 percent (1 1/2") of the length of the weld.

The above supports had been inspected and accepted by the quality control inspectors.

This is a Severity Level IV Violation (Supplement II).

85032705b8 850305 PDR ADOCK 05000275 Q

PDR

Pursuant to the provisions of 10 CFR 2.201, Pacific Gas and Electric Company is hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further items of noncompliance; and (3) the date when full compliance will be achieved.

Consideration may be given to.extending your response time for good cause shown.

WAAR 051986 Dated T. Young, Jr.,

ief Engineering Sec on