ML17083B412
| ML17083B412 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/11/1984 |
| From: | Knighton G Office of Nuclear Reactor Regulation |
| To: | Bailey I NRC OFFICE OF ADMINISTRATION (ADM) |
| Shared Package | |
| ML16341A100 | List: |
| References | |
| NUDOCS 8407170107 | |
| Download: ML17083B412 (4) | |
Text
gp,to REGS 0
I 0
I oo I
lg
+
0 IP
+oI *++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 JUL gg
))~
MEMORANDUM FOR:
Inez K. Bailey, Chief Records Services Branch FROM:
SUBJECT:
George W. Knighton, Chief Licensing Branch No.
3 Division of. Licensing Diablo Canyon - Documents for Public Document Room We request that the following documents be placed in the Commission's Public Document
- Room, 1717 H Street, N.W., Washington, D.C. and in the Local Public Document Room for the Diablo Canyon Plant at the California Polytechnic State University Library, Documents and Maps Department, San Luis Obispo, California 93407:
l.
DCM M-9 Guidelines for Design of Class I Pipe Supports 2.
I-12, Pipe Support Design Tolerance Clarifications 3.
Control of DP's a.
Processing Diablo Problems 10/10/83 b.
Design guestion Administration 6/3/81 c.
Design guestions NPI-6.1 8/14'/79 d.
Design guestions Submitted by Steam Generation Department 11/22/77 4.
ESD-223, Installation and Inspection of Pipe Supports 5.
GC-PI-17, Document Control Operating Instructions 6.
7.
I-37, Instructions for Incorporation of Field Correction Transmittals I-40, Instructions for the Disposition of As-builts Associated With Design Change Notices.
8.
P-16, Procedure for the Preparation, Review, Approval, Update, and Issue of Pipe Support Detail Drawings yj 275-
)p gg~?
8407i70i07 8407ii PDR ADQCK 05000275 P
PDR VVVV(r4, ~ V( INU(r omIret 0 5W-A>5 tlorrtrot 844'l/7>
, Doto'//~
oflloorrororro&wnro
'EGU TORY DOCKET FILE
Two copies of each document are enclosed.
These documents were referenced by Pacific Gas and Electric Company in a meeting with the NRC on Hay 9, 1984.
Further internal and external distribution of these documents is not re-quired.
8
Enclosures:
As stated George W. Knighton, hief Licensing Branch No.
3 Division of Licensing
DOCUMENTS PROVIDED BY PGandE AT MAY 9, 1984 MEETING 1.
DCH M-9, Guidelines for Design of Class I Pipe Supports 2.
I-12, Pipe Support Design Tolerance Clarifications 3.
Control of DP's a.
Processing Diablo Problems 10/10/83 b.
Design guestion Administration 6/3/81 c.
Design guestions NPI-6. 1 8/14/79 d.
Design guestions Submitted by Steam Generation Department 11/22/77 4.
ESD-223, Installation and Inspection of Pipe Supports 5.
GC-PI-17, Document Control Operating Instructions 6.
9 I-37, Instructions for Incorporation of Field Correction Tr ansmittals I-40, Instructions for the Disposition of As-builts Associated With Design Change Notices P-16, Procedure for the Preparation, Review, Approval, Update, and Issue of Pipe Support Detail Drawings PGandE Letter"'DCL-84-046, 2/7/84, Small Bore Piping 091 9d
4~
0'
/pt
)a
)*
~
t<
r
, I f,