Board Notification 84-105:fowards Transcript of 840509 Meeting W/Util in Bethesda,Md Re Piping & Piping Supports. NRR 840418 Order Modifying License Identified Eight Conditions on Low Power OL Required Prior to Full Power
ML17083B380
Person / Time
Site: Diablo Canyon  
Issue date: 05/18/1984
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Gilinsky, Palladino, Roberts
NRC COMMISSION (OCM)
Shared Package
ML16340E349 List:
References
TASK-AS, TASK-BN84-105 BN-84-105, NUDOCS 8405180417
Download: ML17083B380 (6)


Text

%pC,r r

c ri "iiIg 0

4 UNITED STATES NUCLEAR REGULATORY COMMISSION VPASHINGTOM, D. C. 20555 Docket Nos.:

50-275 and 50-323 t1EMORANDUH FOR:

Chairman Palladino Commissioner Gilinsky Commissioner Roberts Commissioner Asselstine Commissioner Bernthal FPOH:

SUBJECT:

Darrell G. Eisenhut, Director Division of Licensing TRANSCRIPT OF NRC/PG&E HEETING ON HAY 9, 1 84 (BOARD NOTIFICATION NO.84-105)

In accordance with NRC procedures for Board Notifications the enclosure is provided.for your information.

The enclosure is the transcript of an NRC meeting held on Hay 9, 1984 with PG&E on the sub.iect of piping and piping supports.

In the NRR,Order Modifying the License of April 18, 1984, the staff stipulated eight conditions on the low-power operating license regarding piping and piping supports that must be met prior to full-power.

PG&E addressed these conditions in,a submittal o'f April 27, 1984 which was promptly reviewed by the staff.

At the meeting the staff identified the members o

the NRC teams

.assigned to each of the license conditions.

The sta provided PG&E with its evaluation of the submittal and identif'ied certain needs for clarification and additicnal information.

These requests have been included in the transcript.

At ihe conclus'.on of the meeting the staff advised PG&E that members of.he teams will conduct audits at PG&E/Bechtel Of ices commencing Hay 15, 1984.

By copv of this memorandum we are providinq the transcript to the parties of the proceeding.

Enclosure:

As stated cc:

See next paae Darrell 6.

enhut, Director

, Division of icensing Office of Nuclear Reactor Regulation 8405180417 I

./

cc:

J.

F. Wolf, ASLB G.

O. Bright, ASLB J. I!line, ASLB T.

S. tloore, ASLAB R.'ohnson, ASLAB H. Buck, ASLAB SECY (2)

EDO OGC OPE Parties to the PrnceeCino

DISTRIBUTION LIST FOR BOARD NOTIFICATION Diablo Canyon Units 1&2 Docket Nos.

50-275/323 OL ACRS Members Ms. Elizabeth Apfelberg Maurice Axelrad, Esq.

Mr. Richard E. Blankenburg Mr. Glenn 0. Bright Dr. John H.

Buck Philip A. Crane, Jr.,

Esq.

Mr. Frederick Eissler David S. Fleischaker, Esq.

Mrs.

Raye Fleming Arthur C. Gehr, Esq.

.".r..".ark Gottl ieb Mr. Lee M. Gustafson Mr.

Thomas H. Harris Mr. Richard B. Hubbard Dr.

W.

Reed Johnson Janice E. Kerr, Esq.

Dr. Jerry Kline Mr. John Marrs Thomas S. Moore, Esq.

Bruce Norton, Esq.

Joel R. Reynolds, Esq.

Mr. James

0. Schuyler Lewis Shollenberger, Esq.

Mr. Gordon Silver Michael J.

Strumwasser, Esq.

Paul C. Valentine, Esq.

Harry M. Willis John F. Wolf, Esq Dr. Robert C. Axtmann Mr. Myer Bender Dr.

Max W. Carbon Mr. Jesse C. Ebersole Mr. Harold Etherington Dr. William Kerr Dr. Harold W. Lewis Dr. J.

Carson Mark Mr. William M. Mathis Dr.

Dade W. Moeller Dr. David Okrent

'Dr. Milton S. Plesset Mr. Jeremiah J.

Ray Dr. Paul C.

Shewmon Dr. Chester P.

Siess Mr. David A. Ward Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Appeal Panel

'Malcolm H. Furbush Resident Inspector/Diablo Canyon NPS Dr. William E.

Cooper Mr.

W.

C. Gangloff Mr. Lee M. Gustafson Dr. Jose Roesset Mr. Malcolm H.

Furbush