QA+E C.HA~6 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D, C. 20555 JAN 28 1982 Docket Nos.:
50-275 HEt10RANDUM FOR:
F. J. Hiraglia, Chief, Licensing Branch No. 3, DL FROM:
'UBJECT:
H. E. Schierling, Project flanager, Licensing Branch No. 3, DL RENOTIFICATION OF MEETING WITH PACIFIC GAS
& ELECTRIC COMPANY - DIABLO CANYON, UNIT 1, REGARDING PG&E SUBMITTAL DATED DECEMBER 4, 1981*
DATE & TIME:
Wednesday, February. 3, '1982 9:00 a.m. - 4:00 p.m.
LOCATION:
PURPOSE:
Room P-118 Phillips Building
- Bethesda, Hd.
To discuss issues based on staff review of PG&E submittal of December 4,
1981 as listed in attachment and the concerns identified in a letter of H. Furbush, PG&E from D. Eisenhut, NRC dated January 28, 1982.
PARTICIPANTS:
NRC H. Denton R.
DeYoung D. Eisenhut R. Vollmer E, Jordan R. Tedesco F. Hiraglia H. Schierling Region V
PG&E G. Haneatis D. Brand, et.al.
PG&E Consultants cc:
See next page.
Hans E.
Sc ie in
, Project Manager Licensing Branch No.
3 Division of Licensing
- This meeting was originally noticed on January 8,
1982 and scheduled for January 19, 1982.
O'0TE
/E g /
E
0 Mr.
Mal colm H.
F urb ush Vice President
- General Counsel Pacific Ga s E
El ec tric Company PE 0.
Box 7442 San Francisco, Cali fornia 94120 I ABLO Cr.",sou CC:
Philip A. Crane, Jr.,
Esq.
Pacific Gas 8 Electric Company P.O.
Box 7442 San Francisco, California 94120 Janice E. ):err, Esq.
California Public Utilities Commission 350 McAllister Street San Francisco, California 94102 J
Mr. Frederick Eissler, President Scenic Shoreline Preservation Conference, Inc.
4623 More Mesa Drive Santa Barbara, California 93105 Ms. Elizabeth Apfelberg 1415 Cozadero San Luis Obispo, California 93401 Mr. Gordon A. Silver Ms. Sandra A. Silver 1760 Alisal Street San Luis Obispo, California 93401 Harry M. Millis, Esq.
Seymour E Willis 601 California Street, Suite 2100 San Francisco, California 94108 Mr. Richard Hubbard MHB Technical Associates Suite K
1723 Hamilton Avenue San Jose, California 95125 Mr. John Narrs, Managing Editor San Luis Obispo County Telegram-Tribune 1321 Johnson Avenue P. 0.
Box 1 12 San Luis Obispo, California 93406
l<r. 't'ial colm H. Furbush, cc:
Res i dent In spec tor/Diabl o Canyon WPS c/o U.
S. Nuclear Regulatory ComnissioA P.
0.
Box 369 Avila Beach, California 93424 lhs.
Raye Fl aning 1920 flattie Road Shell
- Beach, California 93440 John R. Phillips, Fsq.
Simon Klevansky, Esq.
Hargaret Bl odgett, Esq.
Ilarion P. Johnston, Esq.
Joel
- Reynolds, Esq.
Center for Law in the Public Interest 10203 Santa Honica Boulevard Los Angeles, California 90067 Paul C. Valentine, Esq.
321 Lytton Avenue Palo Alto, California 94302 Hr. Byron S.
Georgiov Legal Affairs Secretary Governor's Office State Capi tol Sacramento, California 9S814 Herbert H. Brown, Esq.
Hill, Christopher 8 Phillips, P.C.
1900 M Street, N.M.
Vashington, D.C.
20036 Hr. Richard E. Blankenburg, Co-Publisher Hr. Mayne A. Soroyan, News Reporter South County Publishing Conpany P. 0.
Box 460 Arroyo Grande, California 93420 Hr.
James
- 0. Schuyler Yice President - Nuclear Generation 0 partment Pacific Gas 5 Electric Company P.O.
Box 7442 San Francisco, California, 94120 Bruce Norton, Esq.
Suite 202 3216 North 3rd Street Phoenix, Arizona 85012
ter.
M. C. Gangl off
~'es tin~house L 1 ec tric Corpor~ti on P. 0.
Box ~55 Pitt"burgh, Pennsy) vania 15230 David F'. Fleischakcr, Esq.
p.
D. Box 1178 Ul:lahoaa City, GLlaho-..a
/3101
Attachment i Agenda Items theeting with PG5E January 19 1982 Seismic Reverification Program I.
Scope and Technical Aspects of Plan II.
Sample Criteria III-Benchmarking of Results IY.
I}A Audit Methods Y.
Size and Technical (}ualifications of Review Team Yl.
Contractual and Financial qualifications of Review Team
I.
Scope and Technical Aspects of Plan 2.
Basis for selection of building(s) phd structure(s) for seismic requalification
\\
Models for piping problems, including isometric drawings based on "as built" conditions 3.
Verification of input and seismic loads, for 'piping and support analysi s 4.
Verification of design specifications, design reports and desi gn documents with respect to "as built" conditions 5.
Acceptance and rejection criteria for piping and supports 6.
Supports for large components (tanks, heat exchanger,
- pumps, vessels) 7.
Application of Reg.
Guide 1.100 (Seismic qualification of Electric Equipment for tlucl ear Power Plants) to conduit and cable tray supports, and equipment 8.
Adequacy of seismic input for equipment qualification, interpretation of vertical ground motion, effects of torsion and building response characteristics 9.
Equipment procurement and qualification process (contractual obligations, modifications to account for Hosgri earthquake, commitments made during licensing activities) 10.
Procedure and basis for determining errors in seismic qualifications Independent development of dynamic model for auxiliary building 12.
13.
Criteria for acceptance of fundamental mode frequency, mode shapes and selective floor response spectra Seismic reverification of buried tank and outdoor water storage tank 14.
Independent field verification prior to requalifica-tion; consideration of IE Bulletin 79-14 in independent field verification
r A
- 15. Seismic service contract activities within program scope
- 16. Details for analysis of PG5E internal interfaces 17.
Definitions for (a) significant deficiency or error and (b) insignificant deficiency or error 18.
Guidelines for determining appropriateness of design methods considering cnange in "state of the art" technology II.
Sample Criteria 1.
Criteria for selection of sample calculation and for expansion of sample size if needed 2.
Statistical basis for sample size and proceaure in case of failure 3.
Equipment sample from safe shutdown and cooldown systems 4.
Adequacy of design process and quality assurance; reporting on basis of sample cases 5.
Criteria for sample checks and independent calculations 6.
- Application of current evaluation tecnniques to independent sample calculations in analysis of structures and components.
III.
Benchmarking of Results 1.
Benchmarking to NRC problems, of computer code for piping analysis IV.
9A Audit Methods 1.
Reporting procedure for R. F.
Reedy to R. L. Cloud and PGSE 2.
Scope of ()A review (procurement documentation control; instructions, procedures and drawings; document control; audi ting) 3.
Review of operational
()A program
(.post 1978) with respect to implementation of corrective actions 4.
Consideration of applicable gA criteria (10 CFR 50 App. S)
~
ir V.
Si ze and Techni cal
(}ualifi ca tions of Revi ew Team l.
Identification and qualifications of individuals performing gA review 2.
Expertise of individuals in civil-structural design and analysis 3.
Expertise in seismic analysis of structures 4.
Assignment of individuals with appropriate expertise to specific tasks Yl.
Contractual and financial (}ualifications of Review Team l.
Previous involvement of companies and individuals in Diablo Canyon activities now under their independent review scope.
2.
Previous involvement of companies or individuals in Diablo Canyon Seismic design work 3.
Previous employment by PGAE of individuals now participating, in independent review 4.
Ownership or control of PGSE stock by individuals participating in independent review 5.
Employment by PGSE of relatives or members of present household of individuals participating in review, and position if appropriate.
~
~
Docket File 50-p75 NRC PDR Local PDR NSIC TERA LB83 Files E.
Case D. Eisenhut R. Purple R.
Tedesco B. J.
Youngblood A. Schwencer F. Miraglia E.
Adensam J. Miller G. Lainas
. T. Ippoli'to B. Russell D. Crutchfield T. Novak S.
Varga D. Vahsallo R. Clark.
J. Stolz R. Vollmer J.
Knight R.
Bosnak F.
Schauer R. -Jackson
" G. Lear
- Attorney, OELD OI E (3)
ACRS (16)
OSD (7)
J.
- LeDoux, I&E B. Grimes, I'8E M: Ki,lli.'ams, DL W. Johnston S,
PawlicRi V. Benaroya Z. Rosztoczy W.
Haass D. Muller R. Ballard W.
Reagan A. Toalston F. Schroeder K, Kniel D. Skovholt G. Knighton M. Ernst A. Thadani W. Minners
~
S.
Hanauer
'H. Thompson D. Vassallo P. Collins D. Ziemann V. Moore Regional Administrator R
bcc:
Applicant Service H.
En el Branch LB83 Project Manager
. H Licensing Assistant J.
Lee MEETING NOTICE DISTRIBUTION I8E Region I I&E Region II I&E Region III I8E Region IV I8E Region V
NRC Partici ants H. Denton R.
DeYoung D. Eisenhut RVollmer E. Jordan R. Tedesco FMiraglia H. Schierling IP Mattson T. Speis M. Srinivasan
- 0. Parr F.
Rosa B. Sheron, Acting L: G.
Hulman R. Houston W. Gammill F.
Congel L. Rubenstein W. Butler C. Berlinger
~
~.
v