ML17083A158
| ML17083A158 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos Nuclear Center, Vallecitos |
| Issue date: | 03/23/2017 |
| From: | Feyrer M GE-Hitachi Nuclear Energy Americas |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| Shared Package | |
| ML17083A156 | List: |
| References | |
| M170076 | |
| Download: ML17083A158 (1) | |
Text
HITACHI M170076 March 23, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-001 GE Hitachi Nuclear Energy Matt J Feyrer Site Manager.
VaUecitos Nuclear Center 6705 Vallecitos Rd Sunol. CA 94586 USA T 925 918 6018 Matt.feyrer@ge.com
Subject:
GEH Annual Shutdown Reactor Reports for 2017
References:
License DPR-1, Docket 50-18 (VBWR), License DR-10, Docket 50-183 (EVESR), License TR-1, Docket 50-70 (GETR)
Enclosed are the 2017 Annual Reports for the deactivated Reactors (Vallecitos Boiling Water Reactor (VBWR), ESADA-Vallecitos Experimental Superheat Reactor (EVESR),
and the General Electric Test Reactor (GETR)) located at the GE Hitachi, Vallecitos Nuclear Center near Sunol, California.
If there are any questions or additional information required, please contact me at the number above.
Matt Feyrer, Site Manager Vallecitos Nuclear Center
Enclosures:
VBWR Annual Report No. 52, EVESR Annual Report No. 49, and GETR Annual Report No. 58 cc: NRC Region IV Administrator J. Parrott, NRC NMSS MJF 17-006