MONTHYEARLIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0006, Annual 2021 Decommissioning Funding/Irradiated Fuel Management Status Report2021-09-0808 September 2021 Annual 2021 Decommissioning Funding/Irradiated Fuel Management Status Report LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2024-06-18
[Table view] |
Text
LIC-17-0029 EA-13-243 March 10, 2017 Mr. K. M. Kennedy Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285
Subject:
Confirmatory Action Letter Commitments Follow Up
References:
See Page 3
Dear Mr. Kennedy:
By letter dated June 24, 2016 (Reference 4), Omaha Public Power District (OPPD) provided formal notification to the NRC pursuant to 10 CFR 50.4(b)(8) and 10 CFR 50.82(a)(1)(i) of OPPD's contingent determination to permanently cease power operations at Fort Calhoun Station (FCS) no later than December 31, 2016. OPPD updated this letter on August 25, 2016 (Reference 5) certifying that it plans to permanently cease power operations at FCS on October 24, 2016. OPPD certified to the NRC that all fuel was permanently removed from the FCS reactor pressure vessel on November 13, 2016 (Reference 7).
In Reference 1, OPPD made post-restart commitments associated with FCS which were confirmed in a NRC Confirmatory Action Letter (CAL) (Reference 2). In early 2016, the NRC completed a Confirmatory Action Letter Follow up Inspection (Reference 3) and closed a number of the CAL commitments. The Inspection Report also identified eight (8) action items (Al) within the CAL that remained open. In Reference 6, OPPD provided information on the 8 open Als and requested closure of the remaining commitments based on the OPPD's decision to permanently cease FCS operations.
The NRC responded (Reference 8) to OPPD's request and stated additional information would be needed related to the spent fuel pool.
Based on additional discussions with NRC staff, OPPD is proposing that the open CAL items associated with the design and licensing basis project (DLBRP) be closed to a new commitment that is more appropriate for the facility's decommissioning status. The following commitment would replace Als 2013-05570-049, 2013-05570-026, 2013-05570-076, 2013-05570-092 and 2013-05570-093 from Reference 6:
- 1. Complete the following design and licensing basis reconstitution actions for sections directly associated with the spent fuel pool, spent fuel pool cooling, and directly required supporting structures, systems and components:
a) Identify and define the current design and licensing bases that support decommissioning functions and assure the bases are current, accurate, complete and retrievable.
444 South 161h Street Mall Omaha, NE 68102-2247
Mr. K. M. Kennedy LI C-17-0029 Page 2 b) Complete Phase 3 of the Key Calculation Project. Phase 3 consists of revising any deficient critical calculation or engineering analysis identified in Phase 2, as needed for facility decommissioning.
c) Validate the design and licensing basis has been translated into facility decommissioning by verifying that the operation, surveillance, maintenance and training of safety-related components do not compromise the design and licensing basis.
The above activities will be completed as they relate to facility decommissioning and will be performed for the following USAR Sections:
- Section 5. 7 - Structures, Piling
- Section 5.11- Structures, Structures other than containment
- Section 8.3 - Electrical systems, Station Distribution
- Section 9.5 - Auxiliary Systems, Refueling System
- Section 9.6 - Auxiliary System, Spent Fuel Pool Cooling System
- Section 9. 7 - Auxiliary Systems, Component Cooling Water System
- Section 9.8 - Auxiliary Systems, Raw Water system
- Appendix F - Classification of Structures and Equipment and Seismic Criteria
-OR-
- 2. Submit a License Amendment Request (LAR) for an independent spent fuel cooling system.
The completion date for this commitment is December 29, 2017. The above actions have been entered into the FCS corrective action program as condition report (CR) 2017- 00842.
Based on the above information and the information contained in Reference 6, OPPD is requesting closure of the FCS CAL commitments. Attachment 1 of this letter contains the new regulatory commitments.
If you should have further questions, please contact Mr. Bradley H. Blome, Directory - Licensing &
Regulatory Assurance, at 402-533-7270.
Respectfully,
---nl~~
Mary J. Fisher Senior Director FCS Decommissioning . Regulatory Commitments BHB/cac/epm c: U. S. NRC Document Control Desk J. S. Kim, NRC Project Manager S. M. Schneider, NRC Senior Resident Inspector
Mr. K. M. Kennedy LI C-17-0029 Page 3 REFERENCES
- 1. OPPD Letter (L. P. Cortopassi) to USNRC (M. L. Dapas), "Integrated Report to Support Restart of Fort Calhoun Station and Post-Restart Commitments for Sustained Improvement,"
dated December 2, 2013 (LIC-13-0164) (ML13336A785)
- 2. NRC Letter (M. L. Dapas) to OPPD (L. P. Cortopassi), "Confirmatory Action Letter - Fort Calhoun Station," dated December 17, 2013 (ML13351A395)
- 3. NRC Letter (J. Sowa) to OPPD (S. M. Marik), "Fort Calhoun Station - NRC Confirmatory Action Letter Follow up Inspection 05000285/2016007," dated February 11, 2016 (ML16042A542)
- 4. OPPD Letter (T. Burke) to USN RC (Document Control Desk), "Certification of Permanent Cessation of Power Operations," dated June 24, 2016 (LIC-16-0043) (ML16176A213)
- 5. OPPD Letter (T. Burke) to USN RC (Document Control Desk), "Certification of Permanent Cessation of Power Operations," dated August 25, 2016 (LIC-16-0067) (ML16242A127)
- 6. OPPD Letter (S. M. Marik) to USNRC (Document Control Desk), "Closure of Remaining Confirmatory Action Letter Commitments," dated October 31, 2016 (LIC-16-0066)
(ML16305A104)
- 7. OPPD Letter (T. J. Burke) to USNRC (Document Control Desk), "Certification of Permanent Removal of Fuel from the Reactor Vessel," dated November 13, 2016 (LIC-16-0074)
(ML16319A254)
- 8. NRC Letter (K. M. Kennedy) to OPPD (S. M. Marik), "Response to Request to Close Remaining Confirmatory Action Commitments," dated December 29, 2016(ML16364A332)
LIC-17-0029 Page 1 Regulatory Commitments This table identifies actions discussed in this letter for which OPPD commits to perform. Any other actions discussed in this submittal are described for the NRC's information and are not commitments.
TYPE (Check one) SCHEDULED ONE-TIME CONTINUING COMPLETION DATE COMMITMENT ACTION COMPLIANCE (If Required)
- 1) Complete the following design and licensing basis x Complete by reconstitution actions for sections directly 12/29/2017 associated with the spent fuel pool, spent fuel pool cooling, and directly required supporting structures, systems and components:
a) Identify and define the current design and licensing bases that support decommissioning functions and assure the bases are current, accurate, complete and retrievable.
b) Complete Phase 3 of the Key Calculation Project. Phase 3 consists of revising any deficient critical calculation or engineering analysis identified in Phase 2, as needed for facility decommissioning.
c) Validate the design and licensing basis has been translated into facility decommissioning by verifying that the operation, surveillance, maintenance and training of safety-related components do not compromise the design and licensing basis.
The above activities will be completed as they relate to facility decommissioning and will be performed for the following USAR Sections:
- Section 5.7 - Structures, Piling
- Section 5.11- Structures, Structures other than containment
- Section 8.3 - Electrical systems, Station Distribution
- Section 9.5 - Auxiliary Systems, Refueling System
- Section 9.6 - Auxiliary System, Spent Fuel Pool Cooling System
- Section 9.7 - Auxiliary Systems, Component Cooling Water System
- Section 9.8 - Auxiliary Systems, Raw Water system
- Appendix F - Classification of Structures and Equipment and Seismic Criteria
-OR-
- 2) Submit a License Amendment Request (LAR) for x Submitted by an independent spent fuel cooling system. 12/29/2017 444 South 161h Street Mall Omaha, NE 68102-2247