ML17054D023

From kanterella
Jump to navigation Jump to search
IE Bulletin 76-06, Diaphragm Failures in Air Operated Auxiliary Actuators for Safety Relief Valves
ML17054D023
Person / Time
Site: Crane 
Issue date: 07/21/1976
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
Shared Package
ML17054D025 List:
References
IEB-76-06, IEB-76-6, NUDOCS 7904200132
Download: ML17054D023 (8)


Text

NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C.

20555 IE Bulletin No. 76-06 DATE'.

July 21, 1976 Page 1 of 3 DlAPHRAGM FAILURES IN AIR OPERATED AUXILIARYACTUATORS FOR SAFETY/RELIEF VALVES.

DESCRIPTION OF CIRCUMSTANCES:

On July 8, 1976, Vermont Yankee reported that during a scheduled re-fueling outage surveillance test on their Target Rock valves, the auxiliary air actuator was found to be inoperable on three of the four valves.

The=licensee reported that investigation disclosed that the actuator diaphragms, composed of dacron fabric reinforced silicone rubber, had been degraded by excessive heat.

The excessive heat is attributed to the fact that, contrary to the valve manufacturer's installation in-structions, thermal insulation had been applied to the pneumatic ac-tuator.

The licensee further reported that the valve in which the diaphragm was found not to be degraded, was installed in the direct path of cooling air discharge from the ventilation system, thus receiving supplementary cooling.

Elastomeric materials such as the subject diaphragms are known to have finite service life and to be degraded by excessive temperatures; however, this is the first reported instance of degradation of this component.

This event has particular safety significance, since failure of the diaphragms defeats the function of the Automatic Depressurization System.

In recognition of this situation, the NRR Division of Operating Reactors conducted a telephone survey on July 16, 1976, of selected BWR operating facilities.

~

IE Bulletin No. 76-06 DATE:

July 21, 1976 Page 2 of 3 ACTION TO BE TAKEN BY LICENSEE:

All are operators of BWR and PWR reactor facilities with operating licenses to take the following action:

Determine that the insulation installed on safety related diaphragm operated relief valves in high temperature fluid systems is in accordance with the current recommendations of the valve vendor, i.e., that there is no thermal insulation on the air actuator.

2 ~

Ensure that the procedures used for the disassembly and inspection of these valves, as required by the Technical Specifications, specifically include inspection of the subject diaphragms to determine that no significant deterioration of the diaphragm material has occurred.

3.

~

- Ensure that the vendor's recommended service life and shelf life.

for the diaphragms is not exceeded for the environmental conditions to which the material is exposed.

4.

A report of your plans and schedules for accomplishing the above actions should be submitted within 10 days after receipt of this Bulletin.

For facilities already surveyed by NRR:

DOR, this report should confirm information reported orally.

5 ~

The NRC Regional Office should be promptly informed, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, of any adverse findings resulting from your inspection and/or review of the subject diaphragms or their application.

6.

Within 20 days after completion of the actions described in Item 4 above, report the results, including for any valves found to have d'egradation of diaphragms, the make, type, size, diaphragm material, and service (system) application.

IE Bulletin No. 76-06 DATE:

July 21, 1976 Page 3 of 3 Reports should be submitted to the Director of the NRC Regional Office and a copy should be forwarded to the NRC Office of Inspection and Enforcement, Division of Reactor Inspection Programs, Mashington, D.

C.

20555.

Approval of NRC requirements for reports concerning possible generic problems has been obtained under 44 U.S.C 3152 from the U. S. General Accounting Office.

(GAO Approval B180255(R0072),

expires 7/31/77).

')

NIAGARAMOHAWKPOWER CORPORATION

~if"'IAGARA' MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE. N. Y. 'I3202 blate 12, 1976 kt,. James P. O'R~y Omecto~e o$ ReguLatoxg OpemtL or@

0~ed S~ee NucL~ ReguLatotug Comm&ok on Region 7

631 Pmk Avenue, Kmg o$ Pam6~,

Pa.

19406 RE:

Sock& No.

50-220 VeaII. ~. O'ReilLg:

7n accordance ickth Mme NLe Po~ NucLem S~on U~ IIl TechcaL Speck +~on 6.9, uIe hereby aubnM Peewee Event RepoM 76-13.

Tt~ aepoM con(orms

~o Ae neq~eme~

o$ ReguEato~

Guide 1.16, Reve<on 2 and ups compL&ed ~bin She intent o$ Ne 4.ceIeee Event RepoM.7m~~on BookLet OOE-$$-001, dated Omobw 1974,'+rcev~ed December 24, 1974.

Due Co She nummaL sLgm.pcance categojIy o$ bee

<epos, no auppLemeI~ aepoM m L ncLuded.

VMy~y go~,

R.. Sc in'. u.

Vie Pawl dent ELmtru.c Op~one T30/aOI.

Enc.

3 co@i.ss cc; K.R. GoLL~ (30 cop~as)

L",ERTIFIED 'aiAIL RETURN RECEIPT REQUEST

<<Jta