KPS Amendment 219 - Removal of Cyber Security Requirements for Operating License
ML17052A591
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/09/2017
From: Bruce Watson
Reactor Decommissioning Branch
To: Heacock D
Dominion Energy Kewaunee
CARTER T, 415-5543, T08F05
Shared Package
ML17052A589 List:
References
Download: ML17052A591 (2)


Text

DOMINION ENERGY KEWAUNEE, INC.

DOCKET NO. 50-305 KEWAUNEE POWER STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 219 License No. DPR-43

1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:

A. The application (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15294A072), as supplemented by letters ML15302A402 and ML16323A193 dated October 27, 2015 and November 16, 2016 respectively complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR)

Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

Enclosure 1

2. Accordingly, by Amendment No. 219, License No. DPR-43 is hereby amended to modify the KPS Operating License by referencing 10 CFR 72.212(b)(9), removing requirements for 10 CFR 73.55, replacing the plan name, and removing the requirement for a Cyber Security Plan.
3. The license amendment is effective as of the date of issuance, and shall be implemented within 60 days following DEKs submittal of a written certification to the NRC that the final spent nuclear fuel assembly has been transferred out of the spent fuel pool and placed in storage within the ISFSI.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Bruce A. Watson, CHP, Chief Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery, and Waste Programs Office of Nuclear Material Safety and Safeguards Waste Programs Date of Issuance: May 9, 2017