LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 3.5, Figure 3.5-1 Through Figure 3.5-7

From kanterella
(Redirected from ML17046A288)
Jump to navigation Jump to search
Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 3.5, Figure 3.5-1 Through Figure 3.5-7
ML17046A288
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/30/2017
From:
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17046A230 List: ... further results
References
LR-N17-0034
Download: ML17046A288 (8)


Text

SGS-UFSAR Figure F3.5-1 intentionally deleted. Refer to plant drawing 204811 in DCRMS Revision 27 November 25, 2013 SGS-UFSAR Figure F3.5-2 intentionally deleted. Refer to plant drawing 232445 in DCRMS Revision 27 November 25, 2013 SGS-UFSAR Figure F3.5-3 intentionally deleted. Refer to plant drawing 232444 in DCRMS Revision 27 November 25, 2013

  • I I I i I i . _......., -*-*-,-*-*-* M!--1-N""...l i PSEG Nuclear, LLC SALEM NUCLEAR GENERATING STAT ION I I t Rev1s1on 21, Dec. 6, 2004 Salem Nuclear Generating Station HIGH PRESSURE CYLINDER 1800 RPM DOUBLE -FLOW DESIGN Updated FSAR Figure 3.5-4 I ear
  • LLC. All Rights Reserved.
  • *
  • View of turbinr: cylinder IJ.'Id blade ring, showing method ot supporting and locking lower blade ring in position.
  • Blade rin$s of large high-pressure, high tempr:rarure with statiOnary blades in place . Features r) Centedine supporting block insures center alignment while allowing differ-ential expansion between blade ring and cylinder. :z.) Blades are inserted in blade ring halves. 3) Tongue and groove holds blade ring in position. 4) Metallic seals between blade rings and cylinder prevent leakage of steam in support grooves. 5) Upper plate, in cylinder cover, prevents any "riding-up" of the blade ring. PUBLIC SERVICE ELECTRIC AND GAS COMPANY SALEM NUCLEAR GENERATING STATION Updated FSAR Blade Rings REVISION 8 FEBRUARY 15, 1987 Figure 3.5-5
  • s ...... ..... u w (j). (J) (J) 0 0: u w z ...... co 0: :J ..... w 0: :J (J) (J) w 0: a:. PSEG Nuclear, LLC SALEM NUCLEAR GENERATING STATION
1) ln.oer eyli.ader, supported &.t the hori:z.oatd ceaterl.i.ne 1.0d fixed tra.a.svc:ady at the top and boctom by dowel pins, .Uows freec!om of expaa.sloa of the c:IUtc:r eylizldet'. 2) Eatirc outer eylindcr is at exhaust steam t.emp<:n.tur'c. 3) Fxb*u:Sf hood of labon..toty"1'1'0Vcd design minimires hood los:;. 4) Provision for extn.dloa r.oaes: with molsturc rcmovd. S) lcnet A!ld outer cylinders of fabriea.tod steel ooast.rue(joo with improved one--piece izmer eylic.der design. 6) Fliminotioa of shrouds, rivets, and luhi.ag wires. 7) Reduced stress corrosion cnd:ing. 8) Reduced high eycle fatigue. 9) Heat rat.:: improvel.l'.lellt. 11) Op<:ntioa &.t up to eight (8) inches of ba.c-l:pn::ssu.R:. 12) <>P<::ntioa at +/- 1.5 Hz off-frequency. 13) Oae plccc rotor forging. 14) No separate discs. IS) Integral couplic.gs. Unit 2 Low-Pressure Element PUBLIC SERVICE ELECTRIC AND GAS COMPANY SALEM NUCLEAR GENERATING STATION 1800 RPM Double-Flow Design with 47" Last Row Blades Updated FSAR Revision 16 Figure 3.5-6A January 31, 1998 Location No. o1 l.PINLET IN 1 EXiAACTJON A4 1 E.XTRAC.TJON A3 2 EXTRACnON A2 2 EXTR.ACliON A1 4 EXHAUST ex 2
  • PSEG Nuclear, LLC SALEM NUCLEAR GENERATING STAT ION i *-*+*--* i End VIew Rev1s1on 21, Dec. 6, Solem Nuclear Generating Station EXPLODED VIEW OF LOW PRESSURE UNIT Updated FSAR