ML17037B893

From kanterella
Jump to navigation Jump to search
Letter Regarding GE Report NEDO-21581 Final Report, In-Plant Safety/Relief Valve Discharge Load Test, Monticello Plant
ML17037B893
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 10/03/1977
From: Sobon L
General Electric Co
To: Stello V
Office of Nuclear Reactor Regulation
References
NEDO-21581
Download: ML17037B893 (4)


Text

Mr. VirI:or Stello~ Jri FROM:

General Electric Company San Jose,. California Lo Jo Sabon ZLETTER C}ORIGINAI QCOPY 0 NOTO R IZED OUNCLASSIFIEO PROP INPUT FORM 4 lhalllhAV,~VI.4 s. ~, ~vs,ia 1M, Ss ev y Vs iv s

s w v ~~

s a a va v iv w

~i ~ v

.4RC FORsr~~5 U.S. NUCLEAR REGULATORY COMMISSION NRC DISTRIBUTION FGR PART 50 DOCKET MATERIAL rCAZ FILE NUMBER Su'P7 OATE OF OOCUMENT 10/3/77 DATE RECEIV'E 0 10/4/77 NUMBER OF COPIES RECEIVED

/ ~pc u~~

ESCRIPTION ENCLOSURE Final Report

<< In-Plant Safety/Relief Valve Discharge Load Test,. Monticello Plant-PLPBT NAME:

Monticello

RJZ,

'0/5/77 (1-P)

(3/4" )

FOR ACTION/INFORMATION

/OO WA~. gepeo 1b CENTRAL FILES 2

JJCrL

~

NRC PDR NSIC TIC I G E (7)

ACRS 16 L.

SHAO 4

G.

LAINAS 4

J.

P.

IQ/IGHT 2

BUTLER 4 STOLZ DAVIS LEAR REID t400RE VASSALLO GOLLER SCHRODER TEDESCO STELLO EISENHUT SCHWENCER SIHWEIL J.

GUIBERT (2)

I L~ ~EEL.

INTERNAL0 J.

E t.L

~- seP EC.e~

Rl BUTION LY EXTERNALDISTRIBUTION CONTROL NUMBER pga7fo o 70

GENERAL;'LECTRIC NUCLEAR ENERGY GENERAL ELECTRIC COMPANY, 175 CURTNER AVE., SAN JOSE, CALIFORNIA95125 MC 681, (408) 925-3495 October 3, 1977 SYSTEMS DIVISION BWR PROJECTS DEPARTMENT MFN 371-77

<<~F/'"<"-

OCl 4 (g~7

,CO~ ~<>,

+TORg

~<fhf ggcg

~/ g)l U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.

C.

20555 Attention:,

Mr. Victor Stello, Jr., Directo Division of Operating Reactors Gentlemen:

SUBJECT:

GENERAL ELECTRIC REPORT NEDO-21581 "FINAL REPORT, IN-PLANT SAFETY/RELIEF VALVE DISCHARGE LOAD TEST, MONTICELLO PLANT" This. report is a non-proprietary version of NEDC-21581-P submitted to you.earlier this year.

Sincerel One hurdred copies of the report "NED0-21581, Final Report, In-Plant Safety/Relief Valve Discharge Load, Test, Monticello Plant" are being provided by General Electric Company on behalf. of the Mark I and II Owners Groups.

This report presents information on the structural and hydrodynamic measurements

~obtained during the test and documents comple-tion of Task 5.1.1 of the Mark I Program and Task B.3 of the Mark II Program.

L.. Sobon, Manager BWR Containment Licensing LJS:LDS:at/38 cc:

L. S. Gifford (GE-Bethesda)

J.

C. Guibert (NRC)

R.

L., Tedesco (NRC)

C. I. Grimes (NRC)

- S. ~Miner ~(NRC)

R. S.

Boyd (NRC)

R.

C.

DeYoung (NRC)

H. C. Brinkmann (Mark II Owners Group)

C. J. Anderson (NRC)

~gD

'~f0

r