ML17025A007

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - Final Request for Additional Information - Point Beach Nuclear Plant, Unit 1, Steam Generator Tube Inspection Report - MF8401
ML17025A007
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 01/24/2017
From: Mahesh Chawla
Plant Licensing Branch III
To: Schneider T
Point Beach
References
MF8401
Download: ML17025A007 (2)


Text

1 NRR-PMDAPEm Resource From:

Chawla, Mahesh Sent:

Tuesday, January 24, 2017 4:37 PM To:

Schneider, Thomas (Thomas.Schneider@nexteraenergy.com); Kilby, Gary; Catron, Steve (Steve.Catron@fpl.com)

Cc:

Wrona, David; Huynh, Alan; Rutkowski, John; Johnson, Andrew; Boettcher, Julie; Cameron, Jamnes; Barclay, Kevin; Wong, Emma

Subject:

Final Request for Additional Information - Point Beach Nuclear Plant, Unit 1, Steam Generator Tube Inspection Report - MF8401 Final Request for Additional Information On January 19, 2016, the U.S. Nuclear Regulatory Commission (NRC) staff sent NextEra Energy Point Beach, LLC (NextEra)(the licensee) the draft Request for Additional Information (RAI) provided below. This RAI relates to the results of their 2016 steam generator inspections performed during refueling outage 36 at Point Beach Nuclear Plant, Unit 1.

A clarification call was held on January 24, 2016, between the NRC staff and the representatives of NextEra.

The licensee understood the requested information to be provided on the docket. Tom Schneider from NextEra agreed to provide a response to this final RAI within 30 days from the date of this correspondence. The NRC staff also informed the licensee that a publicly available version of this final RAI would be placed in the NRCs Agencywide Documents Access and Management System.

By letter dated September 20, 2016 (Agencywide Documents Access Management System Accession No. ML16264A202), NextEra Energy Point Beach, LLC (the licensee), submitted the results of their 2016 steam generator inspections performed during refueling outage 36 at Point Beach Nuclear Plant, Unit 1.

In order to complete its review, the U.S. Nuclear Regulatory Commission staff requests the following additional information:

1. Regarding the channel head inspections and the upper steam drum internals visual inspections, please clarify the meaning of no anomalies and whether any degradation was observed.

Please provide the requested information on docket within 30 days of the receipt of this correspondence. Thanks Mahesh Chawla Project Manager Phone: 301-415-8371 Fax: 301-415-1222 mahesh.chawla@nrc.gov

Hearing Identifier:

NRR_PMDA Email Number:

3285 Mail Envelope Properties (Mahesh.Chawla@nrc.gov20170124163600)

Subject:

Final Request for Additional Information - Point Beach Nuclear Plant, Unit 1, Steam Generator Tube Inspection Report - MF8401 Sent Date:

1/24/2017 4:36:43 PM Received Date:

1/24/2017 4:36:00 PM From:

Chawla, Mahesh Created By:

Mahesh.Chawla@nrc.gov Recipients:

"Wrona, David" <David.Wrona@nrc.gov>

Tracking Status: None "Huynh, Alan" <Alan.Huynh@nrc.gov>

Tracking Status: None "Rutkowski, John" <John.Rutkowski@nrc.gov>

Tracking Status: None "Johnson, Andrew" <Andrew.Johnson@nrc.gov>

Tracking Status: None "Boettcher, Julie" <Julie.Boettcher@nrc.gov>

Tracking Status: None "Cameron, Jamnes" <Jamnes.Cameron@nrc.gov>

Tracking Status: None "Barclay, Kevin" <Kevin.Barclay@nrc.gov>

Tracking Status: None "Wong, Emma" <Emma.Wong@nrc.gov>

Tracking Status: None "Schneider, Thomas (Thomas.Schneider@nexteraenergy.com)"

<Thomas.Schneider@nexteraenergy.com>

Tracking Status: None "Kilby, Gary" <Gary.Kilby@fpl.com>

Tracking Status: None "Catron, Steve (Steve.Catron@fpl.com)" <Steve.Catron@fpl.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1721 1/24/2017 4:36:00 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: