ML17013A152
| ML17013A152 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/12/2017 |
| From: | Jamnes Cameron Reactor Projects Region 3 Branch 4 |
| To: | Coffey R Point Beach |
| References | |
| 3-2015-016 | |
| Download: ML17013A152 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 January 12, 2017 Mr. Robert Coffey Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241-9516
SUBJECT:
NRC OFFICE OF INVESTIGATIONS REPORT NO. 3-2015-016
Dear Mr. Coffey:
This refers to an investigation conducted by the U.S. Nuclear Regulatory Commission (NRC)
Office of Investigations (OI) to determine whether an auxiliary operator at the Point Beach Nuclear Plant was discriminated against for raising a safety concern. Based on the evidence developed during the investigation, we did not substantiate the allegation. The synopsis from the OI Report of Investigation is enclosed.
If you have any questions or comments regarding this matter, please contact an NRC Region III Office Allegation Coordinator by calling (800) 522-3025. The NRC Region III Office Allegation Coordinators are Jim Heller, Paul Pelke, and Sarah Bakhsh.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's Rules of Practice, a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). You should note that final NRC documents, including the final OI reports, may be made available to the public under the Freedom of Information Act (FOIA) subject to redaction of information pursuant to the FOIA. Requests under the FOIA should be made in accordance
R. Coffey with 10 CFR 9.23, Request for Records. The instructions for making a request for information under the FOIA are accessible at http://www.nrc.gov/reading-rm/foia/foia-request.html.
Sincerely,
/RA Ann Marie Stone for/
Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-266 and 50-301 License Nos. DPR-24 and DPR-27
Enclosure:
OI Synopsis
R. Coffey with 10 CFR 9.23, Request for Records. The instructions for making a request for information under the FOIA are accessible at http://www.nrc.gov/reading-rm/foia/foia-request.html.
Sincerely,
/RA Ann Marie Stone for/
Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket Nos. 50-266 and 50-301 License Nos. DPR-24 and DPR-27
Enclosure:
OI Synopsis bcc w/encl: AMS File No. RIII-2015-A-0028 FILE NAME: G:\\ORAIII\\EICS\\ALLEGATIONS\\AMS-LTRS\\15 AMS\\150028 Point Beach\\150028.OI synopsis to lic.docx To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII N
OI:RIII N
RIII N
RIII N
NAME Pelke Bigoness*
SK for Skokowski**
Cameron AMStone DATE 01/09/17 01/09/17 01/11/17 01/12/17 OFFICIAL RECORD COPY
- For permission to release OI synopsis. ** The 3-week e-mail has expired.
Case No. 3-2015-016 Enclosure OI SYNOPSIS This investigation was initiated on August 25, 2015, by the U.S. Nuclear Regulatory Commission, Office of Investigations, Region III, to determine whether an auxiliary operator at the Point Beach Nuclear Plant was discriminated against for raising a safety concern.
Based upon the evidence developed, this investigation did not substantiate that an auxiliary operator at the Point Beach Nuclear Plant was discriminated against for raising a safety concern.