ML17009A437

From kanterella
Jump to navigation Jump to search
NRC Staff Notification
ML17009A437
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/09/2017
From: Robert Carpenter
NRC/OGC
To:
Office of Congressional Affairs
SECY RAS
References
50-333-EA, Enforcement Action, RAS 51548
Download: ML17009A437 (2)


Text

January 9, 2017 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )

)

Entergy Nuclear Generation Co., and ) Docket No. 50-333-EA Entergy Nuclear Operations, Inc. )

)

(James A. FitzPatrick Nuclear Power Plant) )

NOTIFICATION The U.S. Nuclear Regulatory Commission (NRC) staff (Staff) is filing this notification to inform all participants that the Staff has issued a letter relaxing the schedule requirements of Order EA-13-109 at the James A. FitzPatrick Nuclear Power Plant. Entergy submitted the request to the NRC on September 8, 2016 for an extension to comply with the requirements in Section IV of NRC Order EA-13-109 concerning implementation of the Phase 1 (wetwell vent) at the James A. FitzPatrick Nuclear Power Plant until June 30, 2018.1 The Staffs letter is available through the NRCs Agencywide Documents Access and Management System (ADAMS) via Accession No. ML16336A754.

Respectfully submitted,

/Signed (electronically) by/

Robert G. Carpenter Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555-0001 Telephone: (301) 287-9118 E-mail: Robert.Carpenter@nrc.gov Dated at Rockville, Maryland this 9th day of January, 2017 1 Letter from Brian R. Sullivan, Entergy, to NRC, Request for Extension to Comply with June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109), (September 8, 2016) (ADAMS Accession No. ML16252A482).

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )

)

Entergy Nuclear Generation Co., and ) Docket No. 50-333-EA Entergy Nuclear Operations, Inc. )

)

(James A. FitzPatrick Nuclear Power Plant) )

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305 (revised), I hereby certify that copies of the foregoing notification dated January 9, 2017 have been filed through the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 9th day of January, 2017.

/Signed (electronically) by/

Robert Carpenter Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-14 A44 Washington, DC 20555-0001 Telephone: (301) 287-9118 E-mail: Robert.Carpenter@nrc.gov Date of Signature: January 9, 2017