ML16363A094

From kanterella
Jump to navigation Jump to search
Region I/P. Blanch Emails Concern Regarding Control Room Methane Detection
ML16363A094
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/27/2016
From: Eugene Dipaolo
Reactor Projects Branch 2
To: Blanch P
- No Known Affiliation
DiPaolo E
References
Download: ML16363A094 (1)


Text

From:

Dipaolo, Eugene To:

R1WORKFLOW Resource

Subject:

Indian Point Correspondence FW: Response to Email Concerning Control Room Methane Detection Date:

Tuesday, December 27, 2016 10:30:01 AM Attachments:

20150074RAC.pdf From: Dipaolo, Eugene Sent: Tuesday, December 27, 2016 10:25 AM To: 'pmblanch@comcast.net' <pmblanch@comcast.net>

Subject:

Response to Email Concerning Control Room Methane Detection Mr. Blanch -

I am responding to your email (copied below) dated November 23. The NRCs assessment of the current proposal by Spectra has not changed; in that, a rupture of the pipelines at either an aboveground or underground location would not prevent the safe shutdown of either IPEC unit.

The concern you raise regarding methane in the control room has been addressed in previous correspondence to you. A copy of that letter is attached.

Sincerely, Gene DiPaolo Chief (Acting)

Reactor Projects Branch 2 From: Paul [1]

Sent: Wednesday, November 23, 2016 11:56 AM To: Dipaolo, Eugene <Eugene.DiPaolo@nrc.gov>

Cc: Paul Blanch <pmblanch@comcast.net>

Subject:

[External_Sender] Re: Letter from Spectra Regarding Gas Pipelines Gene:

May I see a copy of the NRCs new assessment? Does it consider a pipe leak with gas ingress into the control room that has no means of detection for methane?

Paul Blanch 135 Hyde Rd.

West Hartford, CT 06117 pmblanch@comcast.net 860-236-0326 Cell 860-922-3119 ML16363A094