Category:Letter
MONTHYEARRS-24-097, Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 12024-10-23023 October 2024 Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 1 ML24256A0422024-10-0404 October 2024 Updated Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24242A3032024-09-0909 September 2024 Letter - Three Mile Island Station, Unit 2, Issuance of Amendment No. 68, Historic and Cultural Resources IR 05000320/20240012024-08-28028 August 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report Nos. 05000320/2024001 and 05000320/2024002 ML24240A2222024-08-27027 August 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24220A2742024-08-15015 August 2024 Request for Additional Information Clarification Call Regarding Three Mile Island Station, Unit 2, Amended Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24135A3292024-08-0909 August 2024 Amendment No 68, Historic and Cultural Resources Cover Letter IR 07200077/20240012024-06-18018 June 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 07200077/2024001 ML24157A3672024-06-13013 June 2024 Updated Post-Shutdown Decommissioning Activities Report Request for Additional Information Transmittal Letter ML24135A1972024-06-13013 June 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0091 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24120A3242024-05-24024 May 2024 TMI-2 Email to Fws RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24121A2472024-04-29029 April 2024 And Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24120A2552024-04-29029 April 2024 Annual Radiological Environmental Operating Report ML24113A0212024-04-18018 April 2024 (TMI-2), Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A0012024-03-28028 March 2024 (TMI-2), Decommissioning Trust Fund Annual Report ML24065A0042024-03-28028 March 2024 Submittal of 2023 Aircraft Movement Data Annual Report ML24088A0122024-03-28028 March 2024 Notification of Amended Post-Shutdown Decommissioning Activities Report (PSDAR) in Accordance with 10 CFR 50.82(a)(7), Revision 6 ML24085A2152024-03-25025 March 2024 (TMI-2) - Annual Notification of Property Insurance Coverage RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. ML24052A0602024-03-20020 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0061 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24074A3922024-03-14014 March 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML24075A0062024-03-14014 March 2024 List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24073A2312024-03-13013 March 2024 And Three Mile Island Nuclear Station, Unit 2 - Management Change ML24044A0092024-02-12012 February 2024 License Amendment Request – Three Mile Island, Unit 2, Historic and Cultural Resources Review, Response to Request for Additional Information IR 05000320/20230042024-02-0707 February 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023004 ML24038A0222024-02-0505 February 2024 Achp Letter on Section 106 Programmatic Agreement Participation IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 ML23342A1242024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23325A1092024-01-0505 January 2024 Review of the Management Plan for Three Mile Island Station, Unit No. 2, Debris Material ML23354A2062023-12-20020 December 2023 (TMI-2), Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23354A2112023-12-20020 December 2023 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 ML23243A9082023-08-29029 August 2023 SHPO Letter to TMI-2 Regarding Section 106 Activities IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 ML23216A1782023-08-14014 August 2023 Consultation Letter to Steve Letavic for TMI-2 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 ML23216A1772023-08-14014 August 2023 Consultation Letter to Rebecca Countess for TMI-2 ML23216A1732023-08-14014 August 2023 Consultation Letter to Christine Turner for TMI-2 ML23216A1742023-08-14014 August 2023 Consultation Letter to David Morrison for TMI-2 ML23216A1752023-08-14014 August 2023 Consultation Letter to Joanna Cain for TMI-2 ML23221A1402023-08-0808 August 2023 (TMI-2), Response to Requests for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML23213A2342023-08-0101 August 2023 Submittal of Defueled Safety Analysis Report and Decommissioning Quality Assurance Plan ML23200A1882023-07-31031 July 2023 TMI-2 Correction Letter Amendment 67 ML23209A7632023-07-28028 July 2023 Letter from PA SHPO to TMI-2 Solutions on Cultural and Historic Impacts of Decommissioning ML23192A8272023-07-10010 July 2023 TMI-2 Solutions, LLC - Response to SHPO Request for Additional Information for Er Project 2021PR03278.006, TMI-2 Decommissioning Project ML23167A4642023-07-0505 July 2023 Letter - TMI-2- Exemption 10 CFR Part 20 Append G Issuance 2024-09-09
[Table view] |
Text
Three Mile Island Unit 1 Exelon Generation Route 441 South, P.O. Box 480 Middletown, PA 17057 Telephone 717-948-8000 TMl-16-102 December 22, 2016 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289
Subject:
Supplemental Information - TMl-1 Steam Generator Tube Inspection Report for Refueling Outage T1R21
Reference:
Exelon Generation Company, LLC Letter to USN RC TMl-1 Steam Generator Tube Inspection Report for Refueling Outage T1R21, dated May 21, 2016 (TMl-16-015)
In the above reference, Exelon Generation Company, LLC (EGC) provided a report on the completed examination oftubing in the TMl-1 steam generators during Refueling Outage T1R21. An issue was discovered during a subsequent review of the report, determined to be a typographical error. The typographical error occurred when a table was re-created from the original vendor's report.
The total number of plugged tubes was correctly reported. The breakdown by wear mechanism was incorrectly reported for the "B" steam generator.
The attached is a corrected page 13 of 226 for the referenced report. The correction pertains to the table on page 13 titled "Table 3: TMl-1 Tube Plugging History" and under the "TSP wear" and "TIW" columns for "SGB Plug History"; the summation "Total (Tubes)" row should read 192 for "TSP wear" instead ofthe original report listing of 195, and the summation "Total (Tubes)" row should read 3 for "TIW" instead of the original report listing of 0 (zero). All other information in the table is correct.
No new regulatory commitments are established by this submittal. If you have any questions or additional information is needed, please contact Mike Fitzwater at 717-948-8228.
Respectfully, CJ Edw~n n JOJL Site Vice President, Three Mile Island Unit 1 Exelon Generation Company, LLC cc: NRC Regional Administrator - Region I NRC Senior Resident Inspector- Three Mile Island Nuclear Station NRC Project Manager, NRR - Three Mile Island Nuclear Station R. R. Janati, Chief, Division of Nuclear Safety, Pennsylvania Department of Environmental Protection, Bureau of Radiation Protection
Attachment TMl-1 Steam Generator Tube Inspection Report for Refueling Outage T1R21-Corrected Attachment 1, Page 13 of 226 TMI-16-015 (TS 6.9.6.e.) Number of tubes plugged during the inspection outage for each degradation mechanism:
A total of one hundred thirty-four ( 134) tubes were plugged and stabilized during TlR2 I. Three (3) tubes in SG 'A' were preventatively plugged based on engineering judgment due to growth rates and number of indications. One hundred thirty-one (131) tubes in SG 'B' were plugged for TSP wear. Twenty-five (25) of these tubes required plugging based on having indications at or above the Technical Specification limit of 40% Through Wall (TW). The other 106 tubes were preventatively plugged - the majority of these were in the "W-Axis" region of the periphery (Rows l-4). There were no tubes plugged in either SG due to the TTW degradation mechanism.
(TS 6.9.6.f.) The number and percentage of tubes plugged to date, and the effective plugging percentage in each steam generator:
There were no tubes plugged prior to TlRI 9. Table 3 shows the number of tubes plugged during each of the three steam generator inspections and the cumulative number of tubes plugged to date.
Table 3: 'fMl-1 Tube Plugging History SGA Pluiz Historv SGB Plu1* Historv SGA SGB Total Outage TSP TSP TTW Other Total TTW Other Total Plugged Wear Wear Plum!"ed Plu1mcd PSI 0 0 0 0 0 0 0 0 0 T1R19 0 4 0 4 30 3 0 33 37 T1R20 1 0 0 1 31 0 0 31 32 T1R21 3 0 0 3 131 0 0 131 134 Total 4 4 0 8 192 3 0 195 203 (Tubes)
Total(%) 0.051% 1.25% 0.65%
Limit(%) 5.00% 5.00% 5.00%
Limit 779 779 1558 (Tubes)
Note: There are 15,597 tubes per Steam Generator.
There are no sleeves or repairs other than plugs with stabilizers installed in the steam generators.
The effective plugging percentage is the same as the actual plugged tube percentage. Following TIR2l, the effective plugging percentage for SG 'A' is 0.051 % and for SG 'B' 1.25%.
Attachment 1 , Page 13 of 226