MONTHYEARIR 05000245/20240012024-11-12012 November 2024 Safstor Inspection Report 05000245/2024001 ML24317A2562024-11-12012 November 2024 Core Operating Limits Report, Gycle 30 IR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 05000423/LER-2023-006, Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report 2024-09-04
[Table view] Category:License-Operator
MONTHYEARML24281A1102024-10-0707 October 2024 Requalification Program Inspection ML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23298A1652023-10-26026 October 2023 Requalification Program Inspection ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A1362022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Operating Test ML22336A1112022-12-0202 December 2022 U2 - Proposed Operating Test ML22336A1262022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Written Exam ML22336A0932022-12-0202 December 2022 U2 - Proposed Written Examination ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22313A0352022-11-0909 November 2022 U2 - Post Exam Comments and Technical References ML22312A5292022-11-0808 November 2022 U2 - Administered Operating Test ML22312A5222022-11-0808 November 2022 U2 - Administered Written Examination with Answer Key ML22277A2522022-10-0404 October 2022 Requalification Program Inspection ML23003A7792022-09-30030 September 2022 U2 - Administered Written Examination and Operating Test Outlines (Folder 3) ML23003A7672022-09-30030 September 2022 U2 - Handouts to Applicants (Folder 3) ML23003A7862022-09-30030 September 2022 U2 - Proposed Written Examination and Operating Test Outlines (Folder 2) ML23003A7692022-09-21021 September 2022 U2 - Miscellaneous Exam Material (Folder 3) ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML22083A1892022-03-24024 March 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22083A1812022-03-24024 March 2022 Final Qa/Related Forms (Folder 1) ML22083A2032022-03-24024 March 2022 Draft Operating Test (Section C) (Folder 2) ML22059B0452022-01-21021 January 2022 Final Operating Test (Section C Only) ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21263A1442021-09-21021 September 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21263A1472021-09-21021 September 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21293A1222021-09-21021 September 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21293A2502021-09-21021 September 2021 Handouts to Applicants (Folder 3) ML21293A2272021-09-21021 September 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21293A2432021-09-21021 September 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21293A2712021-09-21021 September 2021 Post Exam Comments Resolution and References (Folder 1) ML21293A2182021-09-21021 September 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21293A2302021-09-21021 September 2021 Draft Written Examination (Folder 2) ML21293A2202021-09-21021 September 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21293A2472021-09-21021 September 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21293A1142021-09-21021 September 2021 Final QA Related Forms (Folder 1) ML21293A1412021-09-21021 September 2021 Miscellaneous Exam Material (Folder 1) ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21172A2372021-06-21021 June 2021 Requalification Program Inspection ML21105A6502021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Millstone Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) 2024-10-07
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23334A2452023-11-30030 November 2023 75 Day and 150 Day Submittal Letters ML23334A2422023-11-30030 November 2023 Final QA Related Forms ML23065A0682023-02-22022 February 2023 Final QA Related Forms ML23047A4142023-02-16016 February 2023 Operator Licensing Retake Examination Approval ML23040A2562023-02-0909 February 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22336A1362022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Operating Test ML22336A1112022-12-0202 December 2022 U2 - Proposed Operating Test ML22336A0932022-12-0202 December 2022 U2 - Proposed Written Examination ML22336A0792022-12-0202 December 2022 U2 - Final Qa/Related Forms ML22336A1262022-12-0202 December 2022 U2 - NRC Comments on Proposed Licensee-Developed Written Exam ML22313A0352022-11-0909 November 2022 U2 - Post Exam Comments and Technical References ML22312A5292022-11-0808 November 2022 U2 - Administered Operating Test ML22312A5222022-11-0808 November 2022 U2 - Administered Written Examination with Answer Key ML23003A7862022-09-30030 September 2022 U2 - Proposed Written Examination and Operating Test Outlines (Folder 2) ML23003A7672022-09-30030 September 2022 U2 - Handouts to Applicants (Folder 3) ML23003A7792022-09-30030 September 2022 U2 - Administered Written Examination and Operating Test Outlines (Folder 3) ML23003A7692022-09-21021 September 2022 U2 - Miscellaneous Exam Material (Folder 3) ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML22083A1812022-03-24024 March 2022 Final Qa/Related Forms (Folder 1) ML22083A2032022-03-24024 March 2022 Draft Operating Test (Section C) (Folder 2) ML22083A1892022-03-24024 March 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22059B0452022-01-21021 January 2022 Final Operating Test (Section C Only) ML21350A1582021-12-16016 December 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21293A1142021-09-21021 September 2021 Final QA Related Forms (Folder 1) ML21293A2502021-09-21021 September 2021 Handouts to Applicants (Folder 3) ML21293A2202021-09-21021 September 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21293A2182021-09-21021 September 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21293A2272021-09-21021 September 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21293A2432021-09-21021 September 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21263A1472021-09-21021 September 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21293A2302021-09-21021 September 2021 Draft Written Examination (Folder 2) ML21293A2472021-09-21021 September 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21293A1412021-09-21021 September 2021 Miscellaneous Exam Material (Folder 1) ML21293A1222021-09-21021 September 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21293A2712021-09-21021 September 2021 Post Exam Comments Resolution and References (Folder 1) ML21263A1442021-09-21021 September 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21245A0672021-09-0202 September 2021 Operator Licensing Examination Approval ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20349A2262020-12-14014 December 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20307A0102020-11-0202 November 2020 Final Qa/Related Forms (Folder 1) ML20307A0642020-11-0202 November 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20307A0192020-11-0202 November 2020 Fina Qa/Related Form - Form ES-401-6 (Folder 1) ML20302A2342020-10-15015 October 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20302A2352020-09-18018 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20303A0112020-09-18018 September 2020 Handouts to Applicants (Folder 3) 2023-02-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713 December 14, 2016 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, VA 23060-6711
SUBJECT:
REACTOR OPERATOR RETAKE LICENSE EXAMINATIONS - MILLSTONE POWER STATION, UNIT 2
Dear Mr. Stoddard:
In a telephone conversation on December 2, 2016, between Mr. David Silk, Senior Operations Engineer, and Mr. John Riley, Senior Operations Training Instructor, arrangements were made for the administration of the retake licensing examinations at Millstone Power Station, Unit 2 during the week of February 27, 2017.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors, Revision 10. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by the week of January 16, 2017. The operating tests and the supporting reference materials identified in Attachment 3 to ES-201 will be due by the week of February 13, 2017.
Pursuant to Title 10, Section 55.40(b)(3) of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required tests reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
D. Stoddard To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)
(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and to process the certificates.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
D. Stoddard Thank you for your cooperation in this matter. Mr. John Riley has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. David Silk at (610) 337-5372, or me at (610) 337-5306.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65 cc: Distribution via ListServ
D. Stoddard Thank you for your cooperation in this matter. Mr. John Riley has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. David Silk at (610) 337-5372, or me at (610) 337-5306.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65 cc: Distribution via ListServ DISTRIBUTION: (via email)
DDorman, RA CHighley, DRP, RI DLew, DRA ARancourt, DRP, AA MScott, DRP JBowen, RI OEDO DPelton, DRP RidsNrrPMMillstone Resource RLorson, DRS RidsNrrDorlLpl1-1 Resource JYerokun, DRS ROPreports Resource EDiPaolo, DRP DJackson, DRS TSetzer, DRP DSilk, DRS LCruz, DRP DRS Master Exam File (C. Bixler)
JAmbrosini, DRP, SRI (w/concurrences)
LMcKown, DRP, RI DOCUMENT NAME: G:\DRS\Operations Branch\SILK\MS2Retake150dayexamRetakeltr.doc ADAMS PKG: ML16337A097 ADAMS ACCESSION NO. ML16350A177 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME DSilk DEJackson DATE 12/5/16 12/14/16 OFFICIAL RECORD COPY