Category:Letter type:RS
MONTHYEARRS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval2024-08-20020 August 2024 Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval RS-24-073, Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information2024-07-31031 July 2024 Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-063, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-06-14014 June 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed RS-24-056, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2024-05-28028 May 2024 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-021, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-04-0202 April 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF2024-03-19019 March 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS2024-03-15015 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS RS-24-016, Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations2024-03-14014 March 2024 Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations RS-24-022, Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.2142024-03-0808 March 2024 Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 RS-24-015, Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval2024-02-29029 February 2024 Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval RS-24-017, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Dresden Nuclear Power Station – Holtec MPC-68MCBS2024-02-23023 February 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Dresden Nuclear Power Station – Holtec MPC-68MCBS RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-02-22022 February 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 262023-10-20020 October 2023 Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2023-06-16016 June 2023 Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2023-06-0808 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling 2024-09-12
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-063, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-06-14014 June 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-021, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-04-0202 April 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF2024-03-19019 March 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF RS-24-022, Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.2142024-03-0808 March 2024 Response to Request for Additional Information by the Office of Nuclear Material Safeguards and Safety to Support Review of a Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell RS-23-041, Response to Request for Additional Information for Alternative Request RV-23H2023-03-14014 March 2023 Response to Request for Additional Information for Alternative Request RV-23H RS-23-004, Response to Request for Additional Information Regarding Transition to GNF3 Fuel License Amendment Request2023-01-23023 January 2023 Response to Request for Additional Information Regarding Transition to GNF3 Fuel License Amendment Request RS-23-005, Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves2023-01-17017 January 2023 Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves ML23012A0832023-01-12012 January 2023 Response to Request for Additional Information for Alternative I6R-09 to Permit Continued Application of Certain ASME Section XI 2013 Edition Non-Destructive Examination Requirements RS-22-117, Response to Request for Additional Information License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies2022-11-0303 November 2022 Response to Request for Additional Information License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-108, Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage2022-10-0505 October 2022 Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage RS-22-095, Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel2022-08-10010 August 2022 Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel RS-22-096, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval2022-08-10010 August 2022 Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval RS-22-101, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval2022-08-10010 August 2022 Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval RS-22-098, Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-282022-08-0101 August 2022 Response to Request for Additional Information for Quad Cities Relief Request RV-11, Code Case OMN-28 RS-22-090, Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies2022-07-13013 July 2022 Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies RS-22-077, Response to Request for Additional Information for Quad Cities Relief Requests RV-08, Safety Relief Valves2022-06-30030 June 2022 Response to Request for Additional Information for Quad Cities Relief Requests RV-08, Safety Relief Valves RS-22-078, Response to Request for Additional Information for Quad Cities Relief Request RV-09, MSSVs2022-06-30030 June 2022 Response to Request for Additional Information for Quad Cities Relief Request RV-09, MSSVs RS-22-083, Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical2022-06-17017 June 2022 Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical RS-22-040, Response to Request for Additional Information Related to the License Amendment Request to Transition to GNF3 Fuel2022-04-11011 April 2022 Response to Request for Additional Information Related to the License Amendment Request to Transition to GNF3 Fuel RS-22-033, Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0303 March 2022 Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-02-0202 February 2022 Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs RS-22-005, Response to Request for Additional Information for the GNF3 Fuel Transition License Amendment Request2022-01-11011 January 2022 Response to Request for Additional Information for the GNF3 Fuel Transition License Amendment Request RS-21-113, Response to Supplemental Request for Information Related to Request for Licensing Amendment Regarding Transition to GNF3 Fuel2021-11-0303 November 2021 Response to Supplemental Request for Information Related to Request for Licensing Amendment Regarding Transition to GNF3 Fuel JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-085, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016)2021-08-17017 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016) NMP2L2773, Company - Response to Request for Additional Information2021-06-30030 June 2021 Company - Response to Request for Additional Information JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments RS-21-055, Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended.2021-05-10010 May 2021 Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended. JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-04-20020 April 2021 Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting RS-21-050, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-16016 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-045, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-0707 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-040, Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-03-31031 March 2021 Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-21-036, Response to Request for Additional Information Re Dresden License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition2021-03-16016 March 2021 Response to Request for Additional Information Re Dresden License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition RS-21-029, Response to RAI Re License Amendment Request - Proposed Changes to Byron & Dresden Stations Emergency Plan for Post-Shutdown and Permanently Defueled Condition2021-03-15015 March 2021 Response to RAI Re License Amendment Request - Proposed Changes to Byron & Dresden Stations Emergency Plan for Post-Shutdown and Permanently Defueled Condition RS-21-027, Response to Request for Additional Information Regarding Request for Exemption from Pre-Access Drug and Alcohol Testing Requirements in 10 CFR 26.652021-02-21021 February 2021 Response to Request for Additional Information Regarding Request for Exemption from Pre-Access Drug and Alcohol Testing Requirements in 10 CFR 26.65 2024-09-12
[Table view] |
Text
4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office RS-16-244 December 12, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265
Subject:
Additional Information Regarding Request for License Amendment to Address Secondary Containment Access Openings
References:
- 1. Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "Request for License Amendment to Address Secondary Containment Access Openings," dated February 3, 2016
- 2. Letter from B. Purnell (U.S. NRC) to B. C. Hanson (Exelon Generation Company, LLC), "Dresden Nuclear Power Station, Units 2 and 3; LaSalle County Station, Units 1 and 2; and Quad Cities Nuclear Power Station, Units 1 and 2 - Request for Additional Information Regarding License Amendment Request to Revise Secondary Containment Access Opening Requirements (CAC Nos. MF7325-MF7330)," dated November 10, 2016 In Reference 1, Exelon Generation Company, LLC (EGC) requested an amendment for Dresden Nuclear Power Station, Units 2 and 3, LaSalle County Station, Units 1 and 2, and Quad Cities Nuclear Power Station, Units 1 and 2. The proposed change revises Technical Specifications (TS) 3.6.4.1, "Secondary Containment," Surveillance Requirement (SR) 3.6.4.1.2 to provide an allowance for brief, inadvertent, simultaneous opening of redundant secondary containment access doors during normal entry and exit conditions.
December 12, 2016 U.S. Nuclear Regulatory Commission Page2 The NRC requested additional information that is needed to complete review of the proposed change in Reference 2. In response to this request, EGC is providing the attached information.
EGC has reviewed the information supporting a finding of no significant hazards consideration, and the environmental consideration, that were previously provided to the NRC in Attachment 1 of Reference 1. The additional information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. In addition, the additional information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Mr. Kenneth M. Nicely at (630) 657-2803.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 12th day of December 2016.
R~R Patrick R. Simpson Manager - Licensing
Attachment:
Response to Request for Additional Information cc: NRC Regional Administrator, Region Ill NRC Senior Resident Inspector- Dresden Nuclear Power Station NRC Senior Resident Inspector- LaSalle County Station NRC Senior Resident Inspector- Quad Cities Nuclear Power Station Illinois Emergency Management Agency- Division of Nuclear Safety
ATTACHMENT Response to Request for Additional Information NRC RAI-3 (LSCS)
In its letter dated July 28, 2016, the licensee stated in response to RAl-2:
The LSCS alternative source term analyses assume a 15 minute reactor building drawdown time. LSCS SR 3.6.4.1.3 requires verification that the secondary containment can be drawn down to > 0.25 inch of vacuum water gauge in < 900 seconds using one SGT subsystem.
For LSCS, provide a quantitative comparison of the time when both doors may be opened simultaneously to the margin in the secondary containment drawdown time assumed in the design-bases analysis.
Response
LaSalle County Station (LSCS) adopted alternative source term (AST) in accordance with 10 CFR 50.67, "Accident source term," using the methodology described in NRC Regulatory Guide 1.183. This resulted in revising Surveillance Requirement (SR) 3.6.4.1.3 allowing a 900-second drawdown time to ensure the secondary containment is > 0.25 inches of vacuum water gauge. Because the typical drawdown time using one Standby Gas Treatment (SGT) subsystem is less than 180-seconds, substantial margin exists to ensure that the secondary containment can be re-established during brief simultaneous opening of secondary containment access doors. The proposed SR 3.6.4.1.2 wording uses the phrase "being used for entry and exit" to ensure that the time both doors may be open simultaneously is limited to the time it takes to traverse through a door, typically less than 10 seconds.
NRC RAI-4 (DNPS and QCNPS)
By letter dated September 11, 2006 (ADAMS Package Accession No. ML062070292), the NRC staff approved license amendments for DNPS and QCNPS to adopt the AST methodology permitted by Title 10 of the Code of Federal Regulations Section 50.67, "Accident source term."
These amendments were issued in response to the licensee's application dated October 10, 2002 (ADAMS Package Accession No. ML022940351). The AST methodology is used in the design-basis analysis for DNPS and QCNPS. In a letter dated September 15, 2003 (ADAMS Accession No. ML032671358), the licensee provided supplemental information in support of the AST amendments. Attachment 1 to the licensee's supplemental letter states, on page 11 of 15 (emphasis added):
In the event of a design basis LOCA [loss-of-coolant accident], secondary containment instrumentation automatically initiates closure of appropriate secondary containment isolation valves and starts the SGT System to limit fission product release. The reactor building is at a negative pressure at the beginning of the event, SGT automatically starts and maintains negative pressure, hence the reactor building pressure is always negative and no exfiltration will occur in the LOCA accident sequence.
Page 1
ATTACHMENT Response to Request for Additional Information The licensee's February 3, 2016, application states (emphasis added):
If an accident should occur during the brief period that both doors could be open for entry and exit, and should that accident require secondary containment vacuum to be established by the SGT system, it might not be possible for the SGT system to establish the required vacuum until the door is closed. However, the accident analyses assume only one SGT subsystem is in operation and the secondary containment is initially at atmospheric pressure. Therefore, the few seconds required to close at least one secondary containment door should not have any significant effect on the ability to establish secondary containment vacuum as assumed in the accident analysis.
Given that the reactor building serves as the secondary containment structure, the two statements above appear to be inconsistent.
Clarify the assumptions regarding secondary containment pressure used in the design-basis accident analysis for DNPS and QCNPS.
Response
There is not an explicit assumption in the Dresden Nuclear Power Station (DNPS) and Quad Cities Nuclear Power Station (QCNPS) AST calculations concerning secondary containment pressure. The implicit assumptions regarding secondary containment pressure used in the design-basis accident analysis for DNPS and QCNPS are as described in the September 15, 2003, letter (i.e., Reference 1) discussed above. The secondary containment is maintained at a negative pressure during normal plant operation to comply with Surveillance Requirement 3.6.4.1.1, and in the event of a design basis LOCA, secondary containment instrumentation automatically initiates closure of appropriate secondary containment isolation valves and starts the SGT system to maintain negative pressure. The NRC-approved AST analyses do not model any exfiltration from the secondary containment occurring during the period of time from event initiation through two minutes, which is when the SGT system is credited for being in operation after which all reactor building leakage is modeled as being filtered by the SGT system.
AST assumes that there is insignificant release to the environment for the first two minutes during the coolant activity release phase. The onset of the gap activity release phase is two minutes after the initiation of the accident. The automatic start of the SGT system will ensure that the reactor building negative pressure will be maintained beyond the two-minute coolant activity release period.
The above underlined portion of the sentence in the February 3, 2016, application is incorrect and an issue report has been entered into the Exelon Generation Company, LLC (EGC)
Corrective Action Program.
Page 2
ATTACHMENT Response to Request for Additional Information NRC RAI-5 (DNPS and QCNPS)
In its letter dated July 28, 2016, the licensee stated in response to RAl-2:
The DNPS and QCNPS alternative source term analyses do not assume an explicit secondary containment drawdown time. The reactor building ventilation system maintains the reactor building atmosphere at a slight negative pressure during normal plant operation. In the event of a design basis loss-of-coolant accident, secondary containment instrumentation automatically initiates closure of appropriate secondary containment isolation valves and starts the Standby Gas Treatment (SGT) system to limit fission product releases.
For DNPS and QCNPS, the AST analysis for a LOCA assumes the following: (1) negative pressure is always maintained in secondary containment, (2) there is no secondary containment drawdown time, (3) there is zero secondary containment bypass, and (4) no exfiltration will occur in the LOCA accident sequence.1 Allowing the secondary containment access doors to be simultaneously opened, even during brief periods of time, appears to be inconsistent with these assumptions.
For DNPS and QCNPS, demonstrate that the functional capability of secondary containment is maintained during accident conditions, without an explicit secondary containment drawdown time. The demonstration shall include the brief, inadvertent, simultaneous opening of the secondary containment access doors.
Response
In Reference 2, EGC provided results of a review of Licensee Event Reports (LERs) that was performed to determine whether the functional capability of secondary containment was maintained during previous events involving brief, inadvertent, simultaneous opening of secondary containment access doors. For each event documented in the LERs reviewed, secondary containment differential pressure was maintained. Therefore, EGC concluded that the functional capability of secondary containment was maintained during these events involving brief, inadvertent, simultaneous opening of secondary containment access doors. Additional information to support maintaining the functional capability of secondary containment is provided below.
The proposed SR 3.6.4.1.2 wording uses the phrase "being used for entry and exit" to ensure that the time both doors may be open simultaneously is limited to the time it takes to traverse through a door, typically less than 10 seconds. In the event of a design basis LOCA, secondary containment instrumentation automatically initiates closure of appropriate secondary containment isolation valves (SCIVs) and starts the SGT system to limit fission product release.
As described in the DNPS and QCNPS Updated Final Safety Analysis Reports (UFSARs), the analysis for a design basis accident (DBA) LOCA assumes a simultaneous loss of offsite power with the break together with the worst single failure in the Emergency Core Cooling System.
1 Licensee's October 10, 2002, AST application, Attachment A, page 36 of 48, and September 15, 2003, supplemental letter, Attachment 1, page 11 of 15.
Page 3
ATTACHMENT Response to Request for Additional Information For a LOCA coincident with a loss of offsite power, the SGT system would not be available until after the diesel generators (DGs) start and achieve the required voltage and frequency.
SR 3.8.1.8 for DNPS and QCNPS specify that the DG start time is < 13 seconds. This time, coupled with the time needed to initiate the DG start signal and sequence other loads, bounds the time (i.e., typically less than 10 seconds) that redundant secondary containment access doors would be inadvertently simultaneously open. As a result, there would not be any impact on the ability of the SGT system to draw down secondary containment to the TS required vacuum condition. In addition, AST assumes that there is insignificant release of activity for the first two minutes during the coolant activity release phase. The onset of the gap activity release phase is two minutes after the initiation of the accident. This release would then have to be transported from the reactor pressure vessel into primary containment, and then into the secondary containment volume. Therefore, the functional capability of secondary containment will be maintained during accident conditions, without an explicit secondary containment drawdown time, since the timeframes currently assumed in the accident analyses significantly bound the time that both doors in a secondary containment access opening may be open under the proposed change (i.e., typically less than 10 seconds).