ML16347A011

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation, Submittal of Cask Registration for Spent Fuel Storage
ML16347A011
Person / Time
Site: Millstone, 07201004  Dominion icon.png
Issue date: 12/01/2016
From: Daugherty J
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
16-449
Download: ML16347A011 (2)


Text

Dominion Nuclear Connecticut, Inc.

Rope Ferry Rd., Waterford, CT 06385 Mailing Address: P.O. Box 128 Waterford, CT 06385 *DEc O 1 2016 dom.com Attention: Document Control Desk Serial No.16-449 Director, Division of Spent Fuel Management NSSL/TFO Office of Nuclear Material Safety and Safeguards Docket Nos. 12-41 /7 z..- tb "Y U.S. Nuclear Regulatory Commission 50-423 Washington, DC 20555-0001 License No. NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 3 INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

SUBMITTAL OF CASK REGISTRATION FOR SPENT FUEL STORAGE Pursuant to 10 CFR 72.212, "Conditions of general license issued under §72.21 O,"

paragraph (b)(2), Dominion Nuclear Connecticut, Inc. (DNC) hereby provides the Nuclear Regulatory Commission (NRC) notification regarding the registration of spent fuel storage casks approved under NRC Certificate of Compliance No. 1004. The required registration information is submitted within 30 days of loading. The information required per 10 CFR 72.212(b)(2) is provided as follows:

Licensee Name: Dominion Nuclear Connecticut, Inc.

Licensee Address: Rope Ferry Road Waterford, CT 06385 Reactor License No.: NPF-49 Reactor Docket No.: 50-423 Cask Certificate No.: 1004 Cask Model No.: NUHOMS-32PT DSC Canister Cask Identification Nos.:

MPS 32PT-L 125-A224-HZ026 Initial Use: November 04, 2016 MPS 32PT-L 125-A224-HZ028 Initial Use: November 10, 2016 MPS 32PT-L 125-A224-HZ030 Initial Use: November 17, 2016 The casks were placed in service under Amendment 13 of Certificate of Compliance No. 1004.

Should there be any questions regarding this submittal, or additional information required regarding spent fuel storage under the general license requirements of 10 CFR 72 Subpart K, please contact Mr. Jeffry Langan, Manager Station Licensing, at (860) 444-5544.

Sincerely, John . Daugherty Site ice President- Millstone Commitments made in this letter: None

Serial No.16-449 Docket Nos. 72-4 7/50-423 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 T. H. Carter NRC Senior Project Manager Millstone Unit 1 U.S. Nuclear Regulatory Commission Two White Flint North, Mail Stop T-8F8 11545 Rockville Pike Rockville, MD 20852-2738 L. A. Kauffman U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 R. V. Guzman NRC Senior Project Manager Millstone Units 2 and 3 U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 J.M. Goshen NRC Senior Project Manager - Millstone ISFSI U.S. Nuclear Regulatory Commission, Mail Stop 3D-02M One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station