ML16343A519

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on 970807 to Discuss Engineering & Maintenance Activities at Diablo Canyon
ML16343A519
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/24/1997
From: Perkins K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9709020031
Download: ML16343A519 (10)


Text

~

CATEGORY 2 ~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9709020031 DOC.DATE: 97/07/24 'OTARIZED: NO FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga AUTH.NAME AUTHOR AFFILIATION PERKINS,K.E.

Region 4 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION Region 4 (Post 820201)

SUBJECT:

Notification of significant licensee meeting w/util on 970807 to discuss engineering

& maintenance activities at Diablo Canyon.

DISTRIBUTION CODE:

IE45D COPIES RECEIVED:LTR ENCL SIZE:

T1TI E:

Summary of Significant Meeting with Licensee (Part 50)

NOTES:

DOCKET 05000275 05000323 RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: DEDRO NRR/DISP/PIPB RES/DET/EIB EXTERNAL: NOAC COPIES LTTR ENCL NRC PDR RECIPIENT ID CODE/NAME BLOOM,S MFILE ICENTERQQ OGC/ROED RGN4 FILE 01 COPIES LTTR ENCL 0

R D

0 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 6

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL

~8 RfG(gg P

~4 0

Cy OO V/

++*<<~

UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION IV 611 R'I/Nk'RkALAfB,SUITE 400 ARLINGTON,TEXAS 760114064 NOTICE OF LICENSEE MEETING Name of Licensee:

Name of Facility:

Docket:

Date and Time of Meeting:

Location of Meeting:

Purpose of Meeting:

NRC Attendees:

Licensee Attendees:

Pacific Gas and Electric Company Diablo Canyon Power Plant 50-275, 50-323 August 7, 1997 8:30 a.m. - 10:00 a.m.

10:30 a.m. - 11:30 a.m.

Region IV Office, Arlington, Texas Technical Conference Room Management meeting to discuss engineering and maintenance activities at Diablo Canyon K. E. Perkins, Director, Walnut Creek Field Office W. H. Bateman, Director, Project Directorate IV-2, Office of Nuclear Reactor Regulation '(NRR)

A. T. Howell, Director, Division of Reactor Safety D. A. Powers, Chief, Maintenance Branch T. F. Stetka, Acting Chief, Engineering Branch H. J. Wong, Chief, Reactor Projects Branch E L. F. Womack, Vice President, Nuclear Technical Services D. B. Miklush, Manager, Engineering Services D. H. Oatley, Manager, Maintenance Services J. E. Tompkins, Acting Manager, Nuclear Safety Assessment 5 Licensing T. L. Grebel, Director, Regulatory Services R. A. Waltos, Workload Management NOTE:

(1)

This meeting is open to attendance by members of the general public.

(2)

NRC personnel, not listed above, that desire to attend this meeting should notify Howard Wong at (510) 975-0296 by COB on July 31, 1997.

+p,~)IQ.,Q wJ V DISTRIBUTION:

See next page Approved By:

K. E. Perkins for Thomas P. Gwynn, Director Division of Reactor Projects 9709020031 970724 PDR ADQCK 05000275 P

PDR lllllllllililillllllllllllllilllllllll

0

Pacific Gas and Electric Company CC:

Dr. Richard Ferguson Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, California

> 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns>Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 Christopher J. Warner, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 Robert P. Powers, Vice President and Plant Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, California 93424

0 1

I

Pacific Gas and Electric Company Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406

Pacific Gas and Electric Company E-Mail To:

FOR

(

)

PMNS JKR PAB FJM ACT RPZ SDB1 OEMAIL LJC MDT CAH DMK1 GFS BWH MFH2 KEP JAC1, CMS, CJG LAT, DLF, CAM3 CLG, LMB, DXY CLS1, NLH, WSW LSO CC:

DMB (IE 45)

OEDO RIV Coordina Receptionist ORA File NRC Attendees Mtg Announcement Coordinator E. L. Jordan, DEDO H. L. Thompson, DEDR F. J. Miraglia, A/D/NRR A. C. Thadani, ADT/NRR R. P. Zimmerman, ADP/NRR Project Manager, NRR J. Lieberman, D/OE L. J. Chandler, OGC Senior Resident Inspector C. A. Hackney, RSLO D. M. Kunihiro, WCFO G. F. Sanborn, EO B. Henderson, PAO M. Hammond, PAO Ken Perkins, Director, WCFO RA Secretaries DRP Division DRS Division DNMS Division Linda Ousley tor (17G21)

CC:

DMB (IE 46)

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File DOCUMENT NAME: R:i DCiDC080797.MTG To receive copy of document, indicate In box: "C" = Copy without enciosures "E" = Copy with enctosures "N"= No copy RIV:PI:DRP/E BOlson 07/24/97 RIV:D:

WCFO KPerkins 07/24/97 RIV:D:

DRS AHowell 07/24/97 OFFICIAL RECORD COPY