ML16342E089
| ML16342E089 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 05/07/1998 |
| From: | Steven Bloom NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML16342E090 | List: |
| References | |
| NUDOCS 9805190047 | |
| Download: ML16342E089 (6) | |
Text
(2)
The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.
118, are hereby incorporated in the license.
Pacific Gas and Electric Company'hall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in speciTic license conditions.
~
In addition, the license is amended to add paragraph 2.C(12) to Facility Operating License No. DPR-82 as follows:*
(12)
The Additional Conditions contained in Appendix D, as revised through Amendment No. 118, are hereby incorporated into this license.
Pacific Gas and Electric Company shall operate the facility in accordance with the Additional Conditions.
The license amendment is effective as of its date of issuance to be implemented within 90 days of issuance.
Implementation of the license amendment shall include the relocation of certain technical specification requirements to the appropriate licensee-controlled document as described in the licensee's application dated October 4, 1995, as supplemented by letters dated July 17,,1996, August 20, 1996, and June 2, 1997, and evaluated in the staffs safety evaluation attached to this amendment.
FOR THE NUCLEAR REGULATORYCOMMISSION Steven D. Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Attachments:
- 1. Changes to the Technical Specifications
- 2. Pages 6 and 7 to License
- 3. Appendix D-Additional Conditions Date of Issuance:
February 3, 1998
- Pages 6 and 7 are attached, for convenience, for the composite license to reflect this change.
'F8051.90047 9'80507 PDR ADOCK 05000323 P
r (10) i w
DE D
2 tin4 Prior to start-up following the first refueling outage PG8 E shall complete a confirmatory analysis for the pipeway structure to further demonstrate the adequacy of the pipeway structure for load combinations that include the design earthquake (DE) and double design earthquake (DDE).
(11)
S nt F I
The licensee is authorized to modify the spent fuel pool as described in the application dated October 30, 1985 (LAR 85-13) as supplemented.
Amendment No. 6 issued on May 30, 1986 and stayed by the U.S. Court of Appeals for the Ninth Circuit pending completion of NRC hearings is reinstated.
Prior to final conversion to the modified rack design, fuel may be stored, as
- needed, in either the modified storage racks described in Technical Specification 5.6.1.1 or in the unmodified storage racks (or both) which are designed and shall be maintained with a nominal 21-inch center-to-center distance between fuel assemblies placed in the storage racks.
The Additional Conditions contained in Appendix D, as revised through Amendment No. 118, are hereby incorporated into this license.
Pacific Gas and Electric Company shall operate the facility in accordance with the Additional Conditions.
D.
E ti n An exemption from certain requirements of Appendix J to 10 CFR Part 50 is described in the Office of Nuclear Reactor Regulation'.s Safety Evaluation Report,.Supplement No.
- 9. This exemption is authorized by law and will not endanger life or property or the
'ommon defense and security and is otherwise in the public interest.
Therefore, this exemption previously granted in Facility Operating License No. DPR-81 pursuant to 10 CFR 50.12 is hereby reaffirmed. Th~ facilitywilloperate, with the exemption authorized, in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission.
The licensee shall fullyimplement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "Diablo Canyon Power Plant, Units 1 and 2 Physical Security Plan," with revisions submitted through March 4, 1988; "Diablo Canyon Power Plant, Units 1 and 2 Security Force Training and Qualification Plan," with revisions submitted through August 16, 1985; and "Diablo Canyon Power Plant, Units 1 atjtl 2 Safeguards Contingency Plan," with revisions submitted through November 9, 1987. Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
Amendment No. ~,118
0
~. I" A
s F.
~ntttrus G.
PG&E shall comply with the antitrust conditions in Appendix C to this license.
Hg~rt~in Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, the licensee shall report any violations of the requirements contained in Section 2.C of this license in the following manner:
initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup within thirty days in accordance with the procedures described in 10 CFR 50.73(b), (c), and (e).
~.
PG&E shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liabilityclaims.
Trm fL 0
This License is effective as of the date of issuance and shall expire at midnight on April 26, 2025.
FOR THE NUCLEAR REGULATORYCOMMISSION Original Signed by:
Harold R. Denton Harold R. Denton, Director Office of Nuclear Reactor Regulation Attachments:
- 1. Appendix A - Technical Specifications (NUREG-1151)
- 2. Appendix B - Environmental Protection Plan
- 3. Appendix C - Antitrust Conditions
- 4. Appendix D - Additional Conditions Date of Issuance:
August 26, 1985 Amendment No. V4;98,118
0
~
q>>t ~
fs
'0 la