ML16342D995

From kanterella
Jump to navigation Jump to search
Notification of 971216 Meeting W/Pg&E in Arlington,Texas to Discuss on-line Maint & Unit 2 Refueling Outage
ML16342D995
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/05/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9803030184
Download: ML16342D995 (12)


Text

~

CATEGORY REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9803030184 DOC.DATE: 97/12/05 NOTARIZED: NO DOCKET FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION GWYNN,T.P.

Region 4 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION Region 4 (Post 820201)

SUBJECT:

Notification of 971216 meeting w/PG&E in Arlington,Texas to discuss on-line maint 6 Unit 2 refueling outage.

DISTRIBUTION CODE:

IE45D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Summary of Significant Meeting with Licensee (Part 50)

NOTES:

RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL RECIPIENT ID CODE/NAME BLOOM,S COPIES LTTR ENCL INTERNAL: DEDRO NRR/DRPM/PERB RES/DET/EIB ILE CENTE OGC ROED RGN4 FILE 01 EXTERNAL: NOAC NRC PDR D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL

~gg RE@(g

~C Pp

~l nO

]6 k*40(

UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 OEC -5 l997 NOTICE OF LICENSEE MEETING Name of Licensee:

Name of Facility:

Docket:

Date and Time of Meeting:

Location of Meeting:

Purpose of Meeting:

NRC Attendees:

Licensee Attendees:

Pacific Gas and Electric Company Diablo Canyon Power Plant 50-275; 50-323 December 16, 1997 10:45 a.m. - 12:45 p.m. CST Training Conference Room, NRC RIV Arlington, Texas Discussion of on-line maintenance and Unit 2 refueling outage E. Merschoff, Regional Administrator K. Brockman, Deputy Director, Division of Reactor Projects (DRP)

D. Chamberlain, Deputy Director Division of Reactor Safety H. Wong, Chief, Reactor Project Branch E, DRP D. Proulx, Senior Resident Inspector, DRP R. Powers, Vice President and Plant Manager J. Molden, Operations Services Manager D. Oatley, Maintenance Services Manager B. Hinds, Director, Outage Scheduling and Planning Support T. Grebel, Regulatory Affairs Manager NOTE:

(1)

This meeting is open to attendance by members of the general public.

(2)

NRC personnel, not listed above, that desire to attend this meeting should notify B. Olson at 510/975-0295 by COB on December 11, 1997.

Approved Thomas P. Gw nn, irect Division of Re to roje ts 9803030iS4 97i205 PDR ADQCK 05000275 P

PDR lllalll(lllltljm))~!ti)~~~~~~~

Pacific Gas and Electric Company CC:

Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company Nuclear Power Generation, B14A 77 Beale Street, Room 1451 P.O. Box 770000 San Francisco, California 94177

. Dr. Richard Ferguson Energy Chair Sierra Club California 1100 lith Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman Burns>Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234

Pacific Gas and Electric Company Christopher J. Warner, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 Robert P. Powers, Vice President and Plant Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, California 93424 Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406

'\\r

Pacific Gas and Electric Company 4-DEC -5 l997 E-Mail To:

FOR

(

)

PMNS JKR PAB FJM ACT RPZ SDB1 OEMAIL LJC CAH DMK1 GFS BWH MFH2 KEP JAC1, CJG LAT, DLF, JES4 CLG, LMB, NLH NLH, WSW, CAM3 LSO NRC Attendees Mtg Announcement Coordinator DEDE DEDR A/D/NRR Acting, ADT/NRR ADP/NRR S. Bloom, Project Manager, NRR D/OE OGC C. A. Hackney, RSLO D. M. Kunihiro, WCFO G. F. Sanborn, EO B. Henderson, PAO M. Hammond, PAO K. Perkins, Director, WCFO RA Secretaries DRP Division DRS Division DNMS Division L. Ousley cc:

DMB (IE 45)

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File DRP File DOCUMENT NAME: R:i DciDC1 21 6MN.DRP To receive copy of document. indicate in box: "C" = Copy without enctosures "E" = Copy with enctosures "N" = No copy RIV:PI:DRP/E DD:

PAO RSL D:DRP BJOlson;df 12/1/97 (E) 1 2/

/97 1 2/

/97 DDC i

WHenderso AH kney 1 2/

/97 TPGwynn 1 2/

/97

Pacific Gas and Electric Company 4-DEC -5 l997 E-Mail To:

FOR

(

)

PMNS JKR PAB FJM ACT RPZ SDB1 OEMAIL LJC CAH DMK1 GFS BWH MFH2 KEP JAC1, CJG LAT, DLF, JES4 CLG, LMB, NLH NLH, WSW, CAM3 LSO NRC Attendees Mtg Announcement Coordinator DEDE DEDR A/D/NRR Acting, ADT/NRR ADP/NRR S. Bloom, Project Manager, NRR D/OE OGC C. A. Hackney, RSLO D. M. Kunihiro, WCFO G. F. Sanborn, EO B. Henderson, PAO M. Hammond, PAO K. Perkins, Director, WCFO RA Secretaries DRP Division DRS Division DNMS Division L. Ousley c

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File DRP File DOCUMENT NAME':i DCttDC1216MN.DRP To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PI:DRP/E 8JOlson;df 12/1/97 (E)

DD:

DDC I

12/

/97 PAO WHenderso 1 2/

/97 RSL AH kney 1 2/

/97 D:DRP TPGwynn 1 2/

/97