Notification of Significant Licensee Meeting 96-180 W/Util on 960701 to Discuss Apr 1996 Augmented Testing of Unit 1 Main Steam Safety Valves & Subsequent Actions as Described in Listed Special Insp Repts
ML16342D339
Person / Time
Site: Diablo Canyon 
Issue date: 06/17/1996
From: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
EA-96-180, NUDOCS 9606210303
Download: ML16342D339 (10)


Text

~p,R RKC(q 0 1~ t4 UNITED STATES

. UCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE~ SUITE 400 ARLINGTON,TEXAS 76011 8064 JUN I 7 l996 NOTICE OF LICENSEE MEETING Name of Licensee:

Name of Facility:

Docket:

Pacific Gas and Electric Company Diablo Canyon, Unit 1

50-275 96-180 Date and Time of Meeting:

Location of Meeting:

Purpose of Meeting:

NRC Attendees:

Licensee Attendees:

July 1,

1996 2:30 p.m.

(CDT)

Region IV Office, Arlington, Texas Training Conference Room Predecisional enforcement conference to discuss the April 1996 augmented testing of the Unit 1 main steam safety valves and subsequent actions as described in NRC Special Inspection Report 50-275/96-12; 50-323/96-12 S. Collins, Deputy Regional Administrator J.

Dyer, Director, Division of Reactor Projects (DRP)

K. Perkins, Director, Walnut Creek Field Office W. Bateman, Director, Reactor Projects III/IV, Office of Nuclear Reactor Regulation (NRR)

K. Brockman, Deputy Director, Division of Reactor

.Safety (ORS)

H.

Wong, Chief, Project Branch E,

ORP H. Tschiltz, Senior Resident Inspector, DRP S.

Bloom, Project Manager, NRR G. Sanborn, Enforcement Officer P. Goldberg, Reactor Inspector, ORS O. Corporandy, Project Engineer, DRP G. Rueger, Senior Vice President and General Manager R.

Powers, Manager, Operations Services L.. Womack, Vice President, Nuclear Technical Services D. Miklush, Manager, Engineering Services H. Angus,
Manager, Nuclear Technical Services T. Grebel, Director, Regulatory Support C. Groff, Director, Secondary Systems NOTE:

( 1)

This meeting is open to attendance by members of the general public.

96062i0303" 9606i7 PDR ADOCK 05000275 8

PDR

Pacific Gas and Electric Company (2)

NRC personnel, not listed above, that desire to attend this meeting should notify H.

Mong at 510/975-0296 by COB on June 26, 1996.

Approved By:

D er,

>rector Division of Reactor Projects CC:

Gregory M. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit Pacific Gas and Electric Company Nuclear Power Generation, B14A 77 Beale Street, Room 1451

" P.O.

Box 770000 San Francisco, California 94177 Dr. Richard Ferguson Energy Chair, Sierra Club California 1100 11th Street, Suite 311 Sacramento, California 95814 Ms.

Nancy Culver San Luis Obispo Mothers for Peace P.O.

Box 164 Pismo Beach, California 93(48 Ms. Jacquelyn C. Wheeler P.O.

Box 164 Pismo Beach, California 93448 Managing Editor The County Telegram Tribune 1321 Johnson Avenue P.O.

Box 112 San Luis Obispo, California 93406 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408

Pacific Gas and Electric Company Mr. Truman Burns(Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm.

4102 San Francisco, California 94102 Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D

Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O.

Box 942732 Sacramento, California 94234 Peter H. Kaufman, Deputy Attorney General State of California-110 West A Street, Suite 700 San Diego, California 92101 Christopher J.

Warner, Esq.

Pacific Gas and Electric Company P.O.

Box 7442 San Francisco, California 94120 Warren H. Fujimoto, Vice President and Plant Manager Pacific Gas and Electric Company Diablo Canyon Power Plant P.O.

Box 56 Avila Beach, California 93424

Pacific Gas and Electric Company JUN i 7 tees Distribution:

E-Mail To:

(

)

PMNS SAM PAB WTR ACT RPZ 0 EMAIL LJC CAH DMK1 BWH MFH2 LSO

JAC1, CMS, CJG LAT, DLF, CAM3
CLS1, LMB, CLG CAD, NLH, WSW CC:

FOR NRC Attendees Mtg Announcement Coordinator J.

L. Milhoan, DEDR H. L. Thompson, DEDS W. T. Russell, 0/NRR A. C. Thadani, ADT/NRR R.

P.

Zimmerman, ADP/NRR J.

Lieberman, D/OE L. J. Chandler, OGC C. A, Hackney, RSLO D.

M. Kunihiro, WCFO B. Henderson, PAO M.

Hammond, PAO L. S. Ousley, AMB RA Secretaries DRP Secretaries DRS Secretaries DRSS Secretaries DMB (IE 45)

OEDO RIV Coordinator (17G21)

L. S. Ousley, AMB ORA File RIV File DRP File RIV:C: DRP/E HJWong;df 6/17/96 D:WCFO KEPerkins 6/17/96 0

C PAO BWHenderson 6/i /96 CO CO C

a ney 6/

96 0:DRP JEDyer 6/ /7/96

Pacific Gas and Electric Company JUN I 7 lggg Distribution:

E-Mail To:

FOR

(

)

PMNS SAM PAB WTR ACT RPZ 0 EMAIL LJC CAH DMKI BWH MFH2 LSO

JAC1, CMS, CJG LAT, DLF, CAM3
CLS1, LMB, CLG CAD, NLH, WSW NRC Attendees Mtg Announcement Coordinator J.

L. Milhoan, DEDR H.

L. Thompson, DEDS W. T. Russell, 0/NRR A.

C. Thadani, ADT/NRR R.

P.

Zimmerman, ADP/NRR J.

Lieberman, D/OE L. J.

Chandler, OGC C.

A. Hackney, RSLO D.

M. Kunihiro, WCFO B. Henderson, PAO M.

Hammond, PAO

, L. S. Ousley, AMB RA Secretaries DRP Secretaries DRS Secretaries DRSS Secretaries cc..

DMB ( I E 45)

OEDO RIV Coordinator (17G21)

L. S. Ousley, AMB ORA File RIV File DRP File RIV:C:DRP/E HJWong;df D:WCFO KEPerkins PAO BWHenderson C

a ney 0:DRP JEDyer 6/17/96 6/17/96 6/I /96 0

C L

R CORD CO Y

6/.

96 6/ /7/96

le 1 ~