Corrected Pages to Insp Repts 50-275/96-01 & 50-323/96-01. Correction Due to Administrative Error
ML16342D267
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/18/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML16342D268 List:
References
50-275-96-01, 50-275-96-1, 50-323-96-01, 50-323-96-1, NUDOCS 9604240021
Download: ML16342D267 (2)


See also: IR 05000275/1996001

Text

1

PERSONS

CONTACTED

1. 1

Licensee

Personnel

ATTACHMENT

¹R.

Powers,

Acting Vice President

and Plant Manager

¹D. Brosnan,

Supervisor,

Licensing

and Design Basis

  • ¹W. Crockett,

Manager,

Nuclear Quality Services

  • R. Curb. Acting Plant Manager
  • L. Fisher,

Supervisor,

Special

Projects,

Security Section

¹T. Grebel, Director, Regulatory Compliance

¹L. Hagen. Director, Safety,

Health.

and

Emergency Services

  • B. Hansen-Harris,

Special

Projects,

Security Section

K. Hitchen,

Westinghouse Site Representative

  • J. Hubble, Supervisor,

Operations,

Security Section

¹D. Miklush, Manager,

Engineering Services

¹J.

Molden, Manager,

Maintenance Services

  • D. Morris. Special

Projects,

Security Section

  • R. Prigmore,

Engineer,

Quality Assurance

  • ¹W. Ryan,

Supervisors'ccess

and Fitness-for-Duty

  • D. Sisk. Sr.

Engineer,

NRC Regulatory Support

  • R. Taylor, Engineer,

Quality Assurance

  • R. Todaro, Director, Security Section
  • R. Watson.

Engineer,

Quality Assurance

"¹J.

Young, Director, Quality Assurance

1.2

NRC Personnel

  • J. Dixon-Herrity. Resident

Inspector

  • Denotes those that attended

the exit interview on January

12,

1996.

¹Denotes

those that participated in the followup telephone exit meeting

on

April 5,

1996.

In addition to the personnel

listed above,

the inspector contacted other

personnel

during this inspection period.

Those employees

included

members of

the licensee's

technical

and management staff and members of the security

organization.

2

EXIT INTERVIEW

An exit meeting

was conducted

on January

12,

1996, following the onsite

inspection.

A followup telephone exit meeting

was also conducted

on April 5,

1996.

During these

meetings.

the inspector

reviewed the scope

and findings of

the report.

The licensee

discussed

and furnished proprietary information to

the inspector during the course of this inspection.

During the April 5,

1996.

meeting,

the licensee

acknowledged their understanding

of the apparent

violation.

960424002l

960418

PDR

ADOCK 05000275

8

PDR

0