CATEGORY 3y REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9602010028 DOC.DATE: 96/01/22 NOTARIZED: NO DOCKET FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION SANBORN,G.
Region 4 (Post 820201)
LIEBERMAN,J.
Ofc of Enforcement (Post 870413)
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
EN-96-002:on 960125,notice of proposed imposition of civil penalty in amount of
$ 50,000 issued to licensee. Action based on breakdown in licensee program to assure adequate control of temporary grounding devices.
DISTRIBUTION CODE: IE33F COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Enforcement Notice (EN)
NOTES:
RECIPIENT ID CODE/NAME INTERNAL: AEOD/SPD/RRAB NRR/DISP/PIPB NUDOCS FULL TXT OE FILE 01 EXTERNAL: LITCO BRYCEgJ H
NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME TER RR/DRPM/PER OE DIR NOAC COPIES LTTR ENCL R"
D 0,
C Q
M E
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDt TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL
I
January 22, 1996 EN 96-002 OF CE 0 ENFORCEMENT OTIFICAT 0 OF S
G FIC NT NFORCEH NT CT 0 Licensee:
Pacific Gas and Electric Company (EA 95-279)
Diablo Canyon Nuclear Power Plant Docket Nos.
50-275; 50-323
$g5iee:
PROPOSED IMPOSITION OF CIVIL PENALTY - $50,000 This is to inform the Commission that a Notice of Violation and Proposed Imposition of Civil Penalty in the amount of $ 50,000 will be issued on or about January 25, 1996, to Pacific Gas and Electric Company (PGSE).
This action is based on a breakdown in the licensee's program to assure adequate control of temporary grounding devices.
Specifically, on October 21,
- 1995, several procedures were violated when the licensee failed to remove a "ground buggy" before restoring power to a breaker.
This resulted in a transformer fire and loss of all off-site power supplies to Unit 1.
In determining the
- penalty, the licensee was given credit for corrective actions, but not identification since the violations were discovered after an event and the staff concluded that there were missed opportunities to correct problems in the licensee's program for controlling these devices.
It should be noted that the licensee has not been specifically informed of the enforcement action.
The schedule of issuance and notification is:
Hailing of Notice Telephone Notification of Licensee The State of California will be notified.
January 25, 1996 January 25, 1996
~Co t cts:
G. Sanborn, RN, 817/860-8222 J.
Lieberman, 02, 301/415-2741 g1mtrJbbs OWFN Chairm'aan acheson Comm.
Rogers SECY OCA GPA OWFN EDO DEDR DEDS OE OGC NRR OI SP TWFN OC AEOD OP CTR NMSS IRM OIG RES ACRS Regional Offices GCB,GXC,HLB RIV RIII NAIL NUDOCS PUBLIC PRELIMINARY INFORMATION NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION 01003i 9so2oa002s 9+0am PDR ICE EN-96-002 PDR
/E: 03
0 I