ML16342D105
| ML16342D105 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek, Diablo Canyon, Callaway, Comanche Peak |
| Issue date: | 10/25/1995 |
| From: | Thomas K NRC (Affiliation Not Assigned) |
| To: | Bateman W NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9511010219 | |
| Download: ML16342D105 (16) | |
Text
4 3
MEMORANDUM TO:
FROM:
SUBJECT:
October 25, 1995 William H. Bateman, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Kristine M. Thomas, Project Hanager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation MEETING WITH UNION ELECTRIC COMPANY (UE),
WOLF CREEK NUCLEAR OPERATING CORPORATION (WCNOC),
PACIFIC GAS 5 ELECTRIC COMPANY (PGSE),
AND TEXAS UTILITIES ELECTRIC COMPANY (TU Electric)
ON JOINT STANDARD TECHNICAL SPECIFICATION CONVERSION DATE & TIME:
November 14, 1995 1 3 p.m.
LOCATION:
PURPOSE:
U.S. Nuclear Regulatory Commission One While Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room 0-12Bll To discuss the plans for a joint conversion to standard technical specifications for the Callaway, Wolf Creek, Diablo
- Canyon, and Comanche Peak nuclear plants.
A meeting agenda is attached:
PARTICIPANTS*:
NRC W. Russell R. Zimmerman C. Grimes J.
Stone K. Thomas S.
Bloom Utilities L. Womack, PGLE B. Hagan, WCNOC
- Wideman, WCNOC D. Schnell, UE A. Passwater, UE D. Shafer, UE Docket Nos. 50-483, 50-482, 50-275, 50-323, 50-445, and 50-446
Attachment:
Agenda cc w/att:
See next pages CONTACT:
/'5110i02l9 951025 Kris Thomas 'DR ADOCK 05000275 415-1362 P
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal
~Re ister 48344, 9/20/94.
Document Name:
ISTSHANY.HTR OFC DATE LA:PD4-2
~Pey ton
~C '5 PH:PD4-2 Qw)
KThomas:
k IO Q5/95 OFFICIAL RECORD COPY 30006~
e
'I
DISTRIBUTION November 14 1995 Heetin with UE WCNOC PG&E and TU Electric:
Docket File*
PUBLIC PDIV-2 Reading*
M Russell*
R. Zimmerman*
J.
Roe E. Adensam W. Bateman C. Grimes*
K. Thomas*
J. Stone*
S.
Bloom*
T. Polich*
EPeyton
- OGC, 15B18*
E. Jordan (JKR)
OWFN Receptionist*
ACRS*
J. Hitchell (JAH)
J. Dyer (JED2)
K. Perkins (KEP)
B. Bhnderson
{BR!)
R.
Hammond (HFH2)
- Hard copies
Attachment Heeting Agenda Joint Standard Technical Specification Conversion Union Electric Company, Wolf Creek Nuclear Operating Corporation, Pacific Gas t Electric Company, and Texas Utilities Electric Company November 14, 1995 I.
Overview and Introduction - Don Schnell, Senior Vice President, Union Electric II.
Project Proposal Don Woodlan, Docket Licensing Manager, TU Electric, Joint Licensing Subcommittee Chairman A.
Current Status of Plants'echnical Specifications B.
Proposal for Joint Technical Specification Conversion C.
Joint Development of Submittal D.
Advantages of Joint Technical Specification Conversion E.
Submittal and NRC Review Schedule F.
NRC/Utility Understandings G.
Conclusions III. guestions and Answers
l
Uni on El ectr ic Company Callaway Plant, Unit 1
CC:
Professional Nuclear Consulting, Inc.
19041 Raines Drive Derwood, Maryland 20855 Gerald Charnoff, Esq.
Thomas A. Baxter, Esq.
Shaw, Pittman, Potts 5 Trowbridge 2300 N. Street, N.W.
Washington, D.C.
20037 Mr. H. D. Bono Supervising
- Engineer, Site Licensing Union Electric Company Post Office Box 620 Fulton, Missouri 65251 U.S. Nuclear Regulatory Commission Resident Inspector Office 8201 NRC Road
- Steedman, Missouri 65077-1302 Mr. Alan C. Passwater, Manager Licensing and Fuels Union Electric Company Post Office Box 149 St. Louis, Missouri 63166 Manager - Electric Department Missouri Public Service Commission 301 W. High Post Office Box 360 Jefferson City, Hissouri 65102 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Hr. Ronald A. Kucera, Deputy Director Department of Natural Resources P.O.
Box 176 Jefferson City, Missouri 65102 Mr. Neil S. Cams President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O.
Box 411 Burlington, Kansas 66839 Mr. Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, Missouri 65130 Hr. Lee Fritz Presiding Commissioner Callaway County Court House 10 East Fifth Street Fulton, Missouri 65151 Hr. Donald F. Schnell Senior Vice President - Nuclear Union Electric Company Post Office Box 149 St. Louis, HO 63166
Wolf Creek Nuclear Operating Corporation Wolf Creek Generating Station CC:
Jay Silberg, Esq.
- Shaw, Pittman, Potts
& Trowbridge 2300 N Street, NW Washington, D.C.
20037 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. 0.
Box 311 Burlington, Kansas 66839 Chief Engineer Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Road
- Topeka, Kansas 66612 Attorney General Judicial Center 301 S.W. 10th 2nd Floor
- Topeka, Kansas 66612 County Clerk Coffey County Courthouse Burlington, Kansas 66839 Public Health Physicist Bureau of Air & Radiation Division of Environment Kansas Department of Health and Environment Forbes Field Building 283
- Topeka, Kansas 66620 Vice President Plant Operations Wolf Creek Nuclear Operating Corporation P. 0.
Box 411 Burlington, Kansas 66839 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Supervisor, Licensing Wolf Creek Nuclear Operating Corporation P. 0.
Box 411 Burlington, Kansas 66839 U.S. Nuclear Regulatory Commission Resident Inspectors Office 8201 NRC Road
- Steedman, Hissouri 65077-1302 Supervisor Regulatory Compliance Wolf Creek Nuclear Operating Corporation P. 0.
Box 411 Burlington, Kansas 66839 Hr. Neil S.
Cams President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation Post Office Box 411 Burlington, Kansas 66839
Pacific Gas 8 Electric Company Diablo Canyon Nuclear Power Plant CC:
NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P. 0.
Box 369 Avila Beach, California 93424 Dr. Richard Ferguson, Energy Chair Sierra Club California 6715 Rocky Canyon Creston, California 93432 Hs.
Nancy Culver San Luis Obispo Mothers for Peace P. 0.
Box 164 Pismo Beach, California 93448 Hs. Jacquelyn C. Wheeler P. 0.
Box 164 Pismo Beach, Cailifornia 93448 Managing EdlÃer The Count Tele ram Tribune 1321 Johnson Avenue P. 0.
Box 112 San Luis Obispo, California 93406 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Hr. Truman Burns Hr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, California 94102 Hr. Steve Hsu Radiologic Health Branch State Department of Health Services Post Office Box 942732 Sacramento, California 94232 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 5 Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. Peter H. Kaufman Deputy Attorney General State of California 110 West A Street, Suite 700 San Diego, California 92101 Christopher J.
- Warner, Esq.
Pacific Gas 8 Electric Company Post Office Box 7442 San Francisco, California 94120 Hr. Warren H. Fujimoto Vice President and Plant Manager Diablo Canyon Nuclear Power Plant P. 0.
Box 56 Avila Beach, California 93424 Diablo Canyon Independent Safety Committee ATTN:
Robert R. Wellington, Esq.
Legal Counsel 857 Cass Street, Suite D
Monterey, California 93940 Hr. Gregory M. Rueger Nuclear Power Generation, B14A Pacific Gas and Electric Company 77 Beale Street, Room 1451 P.O.
Box 770000 San Francisco, California 94106
TU Electric Company CC:
Senior Resident Inspector U.S. Nuclear Regulatory Commission P.
O.
Box 1029
- Granbury, TX 76048 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mrs. Juanita Ellis, President Citizens Association for Sound Energy 1426 South Polk
- Dallas, TX 75224 Mr. Roger D. Walker, Manager Regulatory Affairs for Nuclear Engineering Organization Texas Utilities Electric Company
'1601 Bryan Street, 12th Floor
- Dallas, TX 75201-3411 Texas Utilities Electric Company c/o Bethesda Licensing 3 Metro Center, Suite 610
- Bethesda, MD 20814 George L. Edgar, Esq.
- Morgan, Lewis 8 Bockius 1800 M Street, N.W.
Washington, DC 20036-5869 Comanche
- Peak, Units 1 and 2
Honorable Dale McPherson County Judge P. 0.
Box 851 Glen Rose, TX 76043 Office of the Governor ATTN:
Susan Rieff, Director Environmental Policy P. 0.
Box 12428
- Austin, TX 78711 Arthur C. Tate, Director Division of Compliance 5 Inspection Bureau of Radiation Control Texas Department of Health 1100 West 49th Street
- Austin, TX 78756-3189 Mr. C.
Lance Terry Group Vice President Nuclear TU Electric 1601 Bryan Street, 12th Floor
- Dallas, TX 75201-3411
J
. '. MEMORANDUM TO:
s FROM:
SUBJECT:
DATE & TIME:
LOCATION:
PURPOSE:
s October 25, 1995 William H. Bateman, Director Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Kristine H. Thomas, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation MEETING WITH UNION ELECTRIC COMPANY (UE),
WOLF CREEK NUCLEAR OPERATING CORPORATION (WCNOC),
PACIFIC GAS
& ELECTRIC COMPANY (PG&E),
AND TEXAS UTILITIES ELECTRIC COMPANY (TU Electric)
ON JOINT STANDARD TECHNICAL SPECIFICATION CONVERSION November 14, 1995 1
3 p.m.
U.S. Nuclear Regulatory Commission One While Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room 0-12Bll To discuss the plans for a joint conY6rsion to standard technical specifications for the Callaway, Wolf Creek, Diablo
- Canyon, and Comanche Peak nucleai plants.
A meeting agenda is attached.
PARTIC IPANTS*:
NRC W. Russell R.
Zimmerman C.
Grimes J.
Stone K. Thomas S.
Bloom Utilities L. Womack, PG&E B. Hagan, WCNOC T. Grebel, PG&E R. Flannigan, WCNOC D. Woodlan, TU Electric S.
50-483, 50-482, 50-275, 50-323, 50-445, and 50-446
Attachment:
Agenda cc w/att:
See 'next pages CONTACT:
Kris Thomas 415-1362
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Commission Policy Statement on Staff 14eetings Open to the Public" 59 Federal
~Re ister 48344, 9/20/94.
Document Name:
ISTSMANY.MTR OFC NAME DATE LA:PD4-'2 PH:PD4-2 Q'A KThomas; k
JO 0 95 fppey on LO 95 OFFICIAL RECORD COPY
'