ML16342C696

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on 941026 to Discuss Systematic Assessment of Licensee Performance
ML16342C696
Person / Time
Site: Diablo Canyon  
Issue date: 10/11/1994
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9410140019
Download: ML16342C696 (10)


Text

RK0I Wp0

~~a

~o'a*++

UNITED STATES CLEAR REGULATORY COMMISSIO REGION IV 611 RYAN PLA2A DRIVE, SUITE 400 ARLINGTON,TEXAS 76011.8064 OCT 1

t i998 NOTICE OF SIGNIFICANT MEETING Name of Licensee:

Pacific Gas and Electric Company Name of Facility:

Diablo Canyon Nuclear Power Plant Docket Number:

Date and Time of Meeting:

Location of Meeting:

Purpose of Meeting:

NRC Attendees:

Licensee Attendees:

50-275; 50-323 October 26, 1994 1:00 p.m.

3 p.m.

PGEE Community Center (PG8E Information Center),

San Luis Obispo California (Avila Beach exit from Highway 101 South)

Systematic Assessment of Licensee Performance Meeting J.

M. Montgomery, Deputy Regional Administrator T.

R. quay, Director, Project Directorate IV-2, Division of Reactor Projects, NRR J.

E. Dyer, Deputy Director, Division of Reactor Projects D.

F. Kirsch, Chief, Reactor Projects Branch E

G.

W. Johnston, Senior Project Inspector B. Henderson, Public Affairs Officer, WCFO M. D. Tschiltz, Resident Inspector G.

H. Rueger, Senior Vice President and General

Manager, Nuclear Power Generation Business Unit W. Fujimoto, Acting Vice President and Plant Manager, Diablo Canyon Operations J.

D. Townsend, Acting Vice President, Nuclear Technical Services M. J.

Angus, Manager, Nuclear Engineering Services W.

G. Crockett,

Manager, Technical and Support Services R.

N. Curb,

Manager, Nuclear Construction Services B.

W. Giffin, Manager, Maintenance Services D.

B. Hiklush, Manager, Operations Services R.

P.

Powers, Manager, Nuclear equality Services J.

A. Sexton,

Manager, Nuclear Regulatory Services T. L. Grebel, Supervisor, Regulatory Compliance NOTE:

(1)

This meeting is open to attendance by members of the general public.

9410140019 941011 PDR ADOCK 05000275 8

PDR

Pacific Gas and Electric Company (2)

NRC personnel, not listed above, that desire to attend this meeting should notify D. Kirsch at (510) 975-0290 by COB on October 19, 1994.

Approved:

A. Bill Beach, Director Division of Reactor Projects CC:

Pacific Gas and Electric Company Nuclear Power Generation, B14A ATTN:

Gregory H. Rueger, Senior Vice President and General Manager Nuclear Power Generation Bus. Unit 77 Beale Street, Room 1451 P.O.

Box 770000 San Francisco, California 94177 Sierra Club California ATTN:

Dr. Richard Ferguson Energy Chair 6715 Rocky Canyon

Creston, California 93432 San Luis Obispo Mothers for Peace ATTN:

Hs.

Nancy Culver P.O.

Box 164 Pismo Beach, California 93448 Ms. Jacquelyn C. Wheeler P.O.

Box 164 Pismo Beach, California 93448 The County Telegram Tribune ATTN:

Hanaging Editor 1321 Johnson Avenue P,O.

Box 112 San Luis Obispo, California 93406 San Luis Obispo County Board of Supervisors ATTN:

Chairman Room 370 County Government Center San Luis Obispo, California 93408

Pacific Gas and Electric Company California Public.Utilities Commission ATTN:

Mr. Truman Burns)Mr. Robert Kinosian 505 Van Ness, Rm.

4102 San Francisco, California 94102 Diablo Canyon Independent Safety Committee Attn:

Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D

Monterey, California 93940 Radiologic Health Branch State Department of Health Services ATTN:

Mr. Steve Hsu P.O.

Box 942732 Sacramento, California 94234 State of California ATTN:

Mr. Peter H. Kaufman Deputy Attorney General 110 West A Street, Suite 700 San Diego, California 92101 Pacific Gas and Electric Company ATTN:

Christopher J.

Warner, Esq.

P.O.

Box 7442 San Francisco, California 94120 Diablo Canyon Nuclear Power Plant ATTN:

John

Townsend, Vice President and Plant Manager P.O.

Box 56 Avila Beach, California 93424

gl

'1 Il

Pacific Gas and Electric Company Distribution:

E-Hail to:

CJG (Carol Gordon)

DMKI (D. H. Kunihiro)

BWH (Breck Henderson)

,DJS (D. Sullivan/ILPB)

';DMB (IE 45)

J.

L. Hilhoan, DEDR (HS 17G21)

H. L. Thompson, DEDS (HS 17G21)

W. T. Russell, D/NRR (HS 12Dl)

A. C. Thadani, ADT/NRR (HS 12G18)

L. A. Reyes, ADP/NRR (HS 12D9)

J.

Lieberman, D/OE (MS 7H5)

L. J. Chandler, OGC (MS 15B18)

S. Peterson, Project

Manager, NRR (HS 13E19)

OEDO RIV Coordinator (HS 17G21)

L. J. Callan, RA J.

H. Montgomery, DRA G.

F. Sanborn, EO C. A. Hackney,

RSLO, RIV J.

T. Gilliland,

PAO, RIV

'RC Attendees RA Secretary DRA Secretary Carol Gordon Division Secretary (DRP)

L. S, Ousley RIV File Project Inspector H. Smith, WCFO J. Bianchi, WCFO RIV:C/DRP:E*

DKirsch:lt 10/

/94 PAO'-

JTGilliland 10/g; /94 RSLO

",'AHackney 10/! /94 D'

A ech 10/ II /94

  • Previous y concurre File Location:

G:)PSl(DC(HEETNOTE.GWJ

Pacific Gas and Electric Company OCT I

) l9 Distribution:

E-Mail to:

CJG (Carol Gordon)

DMK1 (D. H. Kunihiro)

BWH (Breck Henderson)

DJS (D. Sullivan/ILPB)

DMB (IE 45)

J.

L. Hilhoan, DEDR (HS 17G21)

H. L. Thompson, DEDS (MS 17G21)

W. T. Russell, D/NRR (MS 12Dl)

A. C. Thadani, ADT/NRR (MS 12G18)

L. A. Reyes, ADP/NRR (HS 12D9)

J.

Lieberman, D/OE (MS 7H5)

L. J. Chandler, OGC (HS 15B18)

S.

Peterson, Project Manager, NRR (HS 13E19)

OEDO RIV Coordinator (HS 17G21)

L. J. Callan, RA J.

H. Montgomery, DRA G.

F. Sanborn, EO C. A. Hackney,

RSLO, RIV

,J.

T. Gilliland,

PAO, RIV NRC Attendees RA Secretary DRA Secretary Carol Gordon Division Secretary (DRP)

L. S. Ousley RIV File Project Inspector H. Smith, WCFO J. Bianchi, WCFO DKirsch:lt JTGilliland RIV:C/DRP:E*

PAO~

RSLO Q:.

CAHackney D:

P A

ech 10/

/94 10/) /94 10/l( /94 10/ ll /94

  • Previous y concurre File Location:

G:)PSl)DC)HEETNOTE.GWJ

I