ML16342B196

From kanterella
Jump to navigation Jump to search
Notification of 860414,15 & 16 Tour & Site Visits W/Util & Consultants Re Plant Structures & Briefing by Util Re Soil Structure Interaction & Ground Motion Programs
ML16342B196
Person / Time
Site: Diablo Canyon  
Issue date: 03/26/1986
From: Schierling H
Office of Nuclear Reactor Regulation
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8604010019
Download: ML16342B196 (16)


Text

Docket Nos.:

50-275 and 50-323 March 26, 1986 MEMORANDUM FOR:

FROM:

SUBJECT:

DATE, TIME AND LOCATION:

PURPOSE:

PARTICIPANTS:

Steven A. Varga, Director PWR Project Directorate No.

3 Division of PWR Licensing-A Hans E. Schierling, Senior Project Manager PWR Project Directorate No.

3 Division of PWR Licensing-A DIABLO CANYON LONG TERM SEISMIC PROGRAM (LTSP) - PLANT TOUR AND SITE VISIT BY NRC STAFF AND CONSULTANTS April 14, 1986, 9:15 a.m. - 5:00 p.m.

Diablo Canyon Plant and Site April 15, 1986, 8:45 a.m. - 5:00 p.m.

Training Center on Site April 16, 1986, 8:30 a.m. - noon PG&E Offices in SFO NRC staff and consultants will tour site and plant structures and be briefed by PG&E regarding soil structure interaction and ground motion programs.

NRC:

R. Ballard, N. Chokshi, G. Giese-Koch, D. Jeng, L. Reiter, H. Schierling, S. Varga, K. Aki*, R. Archuleta*,

C. Costantino, S. Day*,

G. Gazetas, M. Reich, J. Savy*, A. Veletsos, R. Whitman

  • Will not attend 4/16 meeting in PG&E Offices, SFO.

PG&E:

D. Brand, L. Cluff, et al.

PAD-3 IQ, HSchieFl(ng/pws 03/+86 Hans E. Schierling, Senior Project Manager PWR Project Directorate No.

3 Division of PWR Licensing-A 86040i00i9 860326 i

PDR='DOCK 05000275 I

P PD

L$

f I

(

cy

(

Pacific Gas and Electric Company Diablo Canyon CC:

Philip A. Crane, Jr.,

Esq.

Pacific Gas

& Electric Company Post Office Box 7442 San Francisco, California 94120 Mr. Malcolm H. Furbush Vice President

- General Counsel Pacific Gas

& Electric Company Post Office Box 7442 San Francisco, Californi.a 94120 Janice E. Kerr, Esq.

California Public Utilities Commission 350 McAllister Street San Francisco, California 94102 Mr. Frederi ck Ei s s 1 er, Pres ident Scenic Shoreline Preservation Conference, Inc.

4623 More Mesa Drive Santa Bar bar a, Cali for nia 93105 Ms. Elizabeth Apfelberg 1415 Cozadero San Luis Obispo, California 93401 Mr. Gordon A. Silver Ms. Sandra A. Silver 1760 Alisal Street San Luis Obispo, California 93401 Harry M. Willis, Esq.

Seymour

& Willis 601 California Street, Suite 2100 San Francisco, California 94108 Mr. Richard Hubbard MHB Technical Associates Suite K

1725 Hamilton Avenue San Jose, California 95125 Resident Inspector/Diablo Canyon NPS c/o US Nuclear Regulatory Commission P. 0.

Box 369 Avila Beach, California 93424 Ms.

Raye Fleming 1920 Mattie Road Shell Beach, California 93440 Joel

Reynolds, Esq.

John R. Phillips, Esq.

Center for Law in the Public Interest 10951 West Pico Boulevard Third Floor Los Angeles, California 90064 Mr. Dick Blankenburg Editor

& Co-Publisher South County Publishing Company P. 0.

Box 460 Arroyo Grande, California 93420 Bruce Norton, Esq.

Norton, Burke, Berry

& French, P.C.

202 E. Osborn Road P.. 0.

Box 10569 Phoenix, Arizona 85064 Mr.

W.

C. Gangloff Westinghouse Electric Corporation P. 0.

Box 355 Pittsburgh, Pennsylvania 15230 Davi d F.

Fl ei schaker, Esq.

P. 0.

Box 1178 Oklahoma City, Oklahoma 73101 Mr. John Marrs, Managing Editor San Luis Obis o Count Telegram Tribune 13 1 Jo nson venue P. 0.

Box 112 San Luis Obispo, California 93406

Pacific Gas 5 Electric Company 2 -

Diablo Canyon CC:

Arthur C. Gehr, Esq.

Snell 5 Wi lmer 3100 Valley Center Phoenix, Arizona 85073 Mr. Leland M. Gustafson, Manager Federal Relations Pacific Gas 5 Electric Company 1726 M Street, N.W.

Suite 1100 Washington, DC 20036-4502 Regional Administrator, Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Michael J.

Strumwasser, Esq.

Special Counsel to the Attorney General State of California 3580 Wilshire Boulevard, Suite 800 Los Angeles, California 90010 Mr. Tom Harris Sacramento Bee 21st and 0 Streets Sacramento, California 95814 Mr. H. Daniel Nix California Energy Commission 1516 9th Street, MS 18 Sacramento, California 95814 Lewis Shollenberger, Esq.

US Nuclear Regulatory Commission Region V

1450 Maria Lane Suite 210 Walnut Creek, California 94596 Mr. Thomas Devine Government Accountability Project Institute for Policy Studies 1901 Que Street, NW Washington, DC 20009 Chairman San Luis Obispo County Board of Supervisors Room 220 County Courthouse Annex San Luis Obispo, California 93401 Director Energy Facilities Siting Division Energy Resources Conservation and Development Commission 1516 9th Street Sacramento, California 95814 Presiden't California Public Utilities Commission California State Building 350 McAllester Street San Francisco, California 94102 Mr. Joseph

0. Ward, Chief Radiological Health Branch State Department of Health Services

'14 P Street, Office Building 88 Sacramento, California 95814

r

II Pacific Gas L.Electn Company Dr. S. T. Algermissen U. S. Geological Survey P. 0.

Box 25046 Mail Stop 966 Denver Federal Center Denver Colorado 80225 Dr. Keiiti Aki Dept. of Geological Sciences Univeristy of Southern California Los Angeles, California 90089 Dr. Ralph J. Archuleta Dept. of Geological Sciences University of California Santa Barbara Santa

Barbara, Californi'a 93106 Mr. Don Bernreuter Lawrence Livermore Laboratory P. 0.

Box 808 Livermore, California 94550 Mr. Donald A. Brand Vice President, Engineering Pacific Gas 5 Electric Company 77 Beale Street, Room 2645 San Francisco, California 94106 Dr. Robert D. Brown, Jr.

U.S. Geological Service Building 8, 8977 345 Middlefield Road Menl o Park, Cali fornia 94025 Mr. Loyd S. Cluff Pacific Gas 5 Electric Company 77 Beale Street, Room 2661 San Francisco, California 94106 Dr.

C. J. Costantino 4 Rockingham Road Spring Valley, New York 10977 Dr. James Davis State Geologist California Division of Mines and Geology Room 1351 1416 Ninth Street Sacramento, California 95814 Dr. Steven M. Day S-Cubed P. 0.

Box 1620 La Jolla, California 92038 Diablo Canyon Dr. George Gazetas JEC 4049

'Renssalear Polytechnic Institute

Troy, New York 12180-3590 Dr. David Perkins U. S. Geological Survey P. 0.

Box 25046 Mail Stop 966 Denver Federal Center

Denver, Colorado 80225 Dr. Morris Reich Structural Analysis Division Building 129 Brookhaven National Laboratory
Upton, New York 11973 Dr. Jean Savy Mail Stop L-196 Lawrence Livermore Laboratory P. 0.

Box 808 Livermore, California 94550 Dr. David B.

Slemmons 2995 Golden Valley Road

Reno, Nevada 89506 Dr. Andrew S. Veletsos 5211 Paisley Avenue
Houston, Texas 77096 Dr. Robert V. Whitman Room 1-342 Massachusetts Institute of Technology Cambridge, Massachusetts 02139

1 0

l'

LONG TERM SEISMIC PROGRAM (LTSP)

AGENDA FOR SITE VISIT/PLANT TOUR DIABLO CANYON NUCLEAR POWER PLANT NRC STAFF AND CONSULTANTS FOR SOIL STRUCTURE INTERACTION (SSI)

AND GROUND MOTION (GM)

MONDAY, APRIL 14, 1986 8:30 a.m.

9:15 a.m.

9:45 a.m.

10:15 a.m.

12:15 a.m.

1:45 p.m.

4:00 p.m.

5:00 p.m.

5:45 p.m.

9:45 a.m.

10:15 a.m.

12:15 p.m.

1:45 p.m.

3:45 p.m.

5:00 p.m.

Leave Diablo Canyon Energy Center (Route 101) by bus Introduction at Training Center Security check-in Plant tour (non rad.

areas only), including outside perimeter of buildings Training Center (outside plant security),

lunch and briefing on site geology/topography Site vicinity tour PG&E overview of geology, seimology and geophysics activities Leave Training Center by bus Arrive Diable Canyon Training Center

TUESDAY, APRIL 15, 1986 8:00 a.m.

Leave Energy Center (Route 101) by bus 8:45 a.m.

Arrive Diablo Canyon Training Center, outside security area 8:45 a.m. - noon PGKE presentation and discussion of ground motion program noon - 1:00 p.m.

Lunch (will be arranged) 1:00 p.m. - 2:00 p.m.

2:00 p.m. - 3:00 p.m.

3:00 p.m.

3:45 p.m.

- 3:30 p.m.

- 4:30 p.m.

4:30 p.m. -,5:00 p.m.

Continuation of ground motion program discussion PGSE presentation and discussion of soil structure interaction program PGSE summary NRC/Consultant caucus Summary 5:00 p.m.

Leave Training Center'by-bus 5:45 p.m.

Arrive Energy Center Evening NRC staff and SSI consultants travel to San Francisco

WEDNESOAY, APRIL 16, 1986 8:30 a.m. - noon NRC staff and SSI consultants meet at PG&E offices (exact location to be announced at site) to review in detail selected documents, including inputs and outputs of benchmark problems for structures analyzed, soil models, ground motion input, topographic modeling, structural modes.

Meeting to continue in afternoon if necessary.

NRC staff and consultants caucus.

Summary comments with PGSE at end of meeting.

k V

MEETING NOTICE DISTRIBUTION ocket or Central file NRC PDR Local PDR PAD83 RDG ORAS H. Denton E. Rossi D. Crutchfield G. Lainas S.

Varga Project Hanager - H. Schierling OELD E. Jordan B. Grimes J. Partlow {Emergency Preparedness)

ACRS (10)

OPA N. Olson Plant Service List C.

Vogan Resident Inspector Regional Administrator NRC Participants R. Ballard N. Chokshi G. Giese-Koch D. Jeng L. Reiter K. Aki*

R. Archuleta*

C. Costantino S.

Day*

G. Gazetas M. Reich J.

Savy*

A. Veletsos R. Whitman

0

'I 0

~