Notice of Issuance of License DPR-82
ML16342B143
Person / Time
Site: Diablo Canyon 
Issue date: 08/26/1985
From: Knighton G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML16341D403 List:
References
NUDOCS 8509060371
Download: ML16342B143 (12)


Text

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-323 DIABLO CANYON NUCLEAR POWER PLANT UNIT 2 PACIFIC GAS ELECTRIC COMPANY NOTICE OF ISSUANCE OF FACILITY OPERATING LICENSE DPR-82 Notice is hereby given that, pursuant to the approval given in a Memorandum and Order dated August 1, 1985, the U.S. Nuclear Regulatory Comnission (the Commission) has issued Facility Operating License No.

DPR-82 (the license) to Pacific Gas and Electric Company (PGSE or the licensee) which authorizes operation of the Diablo Canyon Nuclear Power Plant, Unit 2 (the facility or Diablo Canyon Unit 2).

Diablo Canyon, Unit 2 is a pressurized water reactor located in San Luis Obispo County, California.

This license authorizes operation at reactor core power levels not in excess of 3411 megawatts thermal

( 100K rated power) in accordance with the provisions of the license, the Technical Specifications and the Environmental Protection Plan.

Facility Operating License No. DPR-82 supersedes Facility Operating License No.

DPR-81, previously issued to the licensee on April 26, 1985, which authorized the operation of the facility at power levels up to 5% of rated power.

The application for license complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations.

The Commission has made appropriate findings as required by the Act and the Commission's regulations in 10 CFR Chapter I, which are set forth in the license.

Prior public notice of the overall action involving the proposed issuance of an operating license authorizing full power operation was published in the FEDERAL REGISTER on October 19, 1973 (38 F.

R. 29105).

(

850906037f 850826

~>~0K OSOOO32Q PDR

I gy C

f The Commission has determined that the issuance of this License will not result in any environmental impacts other than those evaluated in the Final Environmental Statement (issued in May 1973, 38 F.R.

14183) and its Addendum (issued in May 1976, 41 F.R. 22895), the NRC Flood Plain Review (dated September 9, 1981) and the NRC Discussion of Environmental Effects of the Uranium Fuel Cycle (dated September 9, 1981) since the activity authorized by this License is encompassed by the overall action evaluated in those documents.

For further details with respect to this action,. see (1) Commission Memorandum and Order (CL1-85-14) dated August 1, 1985; (2) Facility Operating License No.

DPR-82 with Technical Specifications (NUREG-1151) and the Environ-mental Protection Plan; (3) Facility Operating License No.

DPR-81 for fuel load and low power dated April 26, 1985; (4) the reports of the Advisory Committee on Reactor Safeguards dated June 12, 1975, August 19, 1977, July 14, 1978, November 12, 1980, February 14, 1984, April 9, 1984, June 20, 1984 and July 16, 1984; (5) the Commission's Safety Evaluation Report (NUREG-0675, Supplements No.

1 through No. 32);

(6) the Final Environmental Statement dated May 1973 and its Addendum dated May 1976; (7)

NRC Flood Plain Review of Diablo Canyon Nuclear Power Plant Site dated September 9,

1981; and (8) Discussion of the Environmental Effects of Uranium Fuel Cycle dated September 9, 1981.

These items are available for public inspection at the Commission s Public Document

Room, 1717 H Street, N. W., Washington, D. C. and the California Polytechnic State University Library, Documents and Maps Department, San Luis Obispo, California 93407.

A copy of the Facility Operating License No.

DPR-82 may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D. C. 20555, Attention:

Director, Division of Licensing.

Copies of NUREG-0675, NUREG-1151 and the

0 Final Environmental Statement and its Addendum may be purchased from the National Technical Information Service, Department of Commerce, 5285 Port Royal

Road, Springfield, VA 22161, or may be ordered by calling (202) 275-2060 or (202) 275-2171 or by writing to the Superintendent of Documents, U.S. Government Printing Office, Post Office Box 37082, Washington, D.C. 20013-7082.

All orders should clearly identify the NRC publication number and the requester's GPO deposit

account, or Visa or Mastercard number and expiration date.

Dated at Bethesda, Maryland, the 26 day of August, 1985.

FOR THE NUCLEAR REGULATORY COMMISSION George

. Knighto Chief Licensing Branch No. 3 Division of Licensing

Qfi A

~S RCCy

,~c Cy I

nO ItA

'+n

~O

+a*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket Nos. 50-275 50-323 AMENDMENT TO INDEMNITY AGREEMENT NO. B-75 ND N

NO.

9 Effective August 26, l985, Indemnity Agreement No. B-75, between Pacific Gas and Electric Company and the Nuclear Regulatory Comission, dated December 31, 1975, as

amended, is hereby further amended as follows:

Item 3 of the Attachment to the indemnity agreement is deleted in its entirety and the following substituted therefor:

Item 3 - License number or numbers SNM-1503 SNM-1667 DPR-76 DPR-80 (From 12:01 a.m.,

December 31, 1975 to 12 midnight, September 21, 1981 inclusive)

(From 12:01 a.m., October 15, 1976 to 12 midnight, April 25, 1985 inclusive)

(From 12:Ol a.m.,

September 22, 1981 to 12 midnight, November 1, 1984 inclusive)

(From 12:01 a.m.,

November 2, 1984)

0 z

DPR-81 (From 12:Ol a.m., April 26, 1985 to 12 midnight, August 25, l985, inclusive)

DPR-82 (From 12:01 a.m.,

August 26, l985)

FOR THE U. S.

NUCLEAR REGULATORY COMMISSION Jerome

Saltzman, Assistan

>rector State and Licensee Rela ons Office of State Progr s

Accepted By P

C S

LCRI PN

0

(

l

DIABLO CANYON NUCLEAR POWER PLANT, UNIT 2 ISSUANCE OF FACILITY OPERATING LICENSE DPR-82 DISTRIBUTION~

,SO-323

  • LPDR
  • NSIC
  • PRC System LB¹3 Reading

+JLee (25)

  • Hlchierl ing TMNovak JSaltzman, SAB

, *LChandler CMiles HRDenton JRutberg AToalston WMiller, LFMB

~JPartlow

~BGrimes

  • EJordan

<Harmon

~EButcher, SSPB

~TBarnhart (4)

  • I Bail ey
  • With all enclosures.